HomeMy WebLinkAboutUntitled (4) LAW OFFICES OF
Ecicherg, Lammers, Briggs, Wolff & Vierling, P.L.L.P.
1835 Northwestern Avenue
Lyle J. Eckberg Stillwater, Minnesota 55082 David K. Snyder
James F. Lammers (612) 439-2878 Urosh Piletioh*
Robert G. Briggs*t► FAX (612) 439-2923 Paul A. Wolff
Mark J. Vierling*
Gregory G. Gallery Direct Dial No. : (612) 351-2118 (1944-1996)
*Qualified Neutral Arbitrator&Mediator
Thomas J. Weidner* �
Susan D. Olson March 24, 1998 Qualified Neutral Arbitrator
*Certified Real Estate Specialist
[E OWE
Mr. Thomas Melena MAR 2 5 199$
City Administrator
City of Oak Park Heights
14168 - 57th Street North
P.O. Box 2007
Oak Park Heights, Minnesota 55082
Re: Valley View Estates Walkway Easements
Dear Tom:
I am enclosing herewith and r- ur 'ng to you Joe
Anderlik' s correspondence dated March 13 , 998 . nd the drawing he
provided to you.
Yours ery t • y,
Ma k J. Vierling
MJV/sdb
Enclosure
• Bonestroo,Rosene,Anderlik and Associates,Inc.isflimative Action/Equal Opportunity Emplc ver
Bonestroo Principals::Otto G.Bonestroo,PE.•Joseph C.And •Marvin L.Sorvala,RE.•
Richard E.Turner,P...• Glenn R.Cook,P.E.•Robert G.Schunicht,RE.• Jerry A.Bourdon,PE.•
RoseneRobert W.Rosene,P.E.and Susan M.Eberlin,C.P.A.,Senior Consultants
Associate Principals:Howard A.Sanford,RE.• Keith A.Gordon,P.E.• Robert R.Pfefferle,P.E.•
Anderlik &
Richard W.Foster,RE.• David O.Loskota,PE.•Robert C.Russek,A.I.A.• Mark A.Hanson,P.E.•
Michael T.Rautmann,RE.• Ted K.Field,P.E.• Kenneth R Anderson,RE.• Mark R.Rolls,P.E.•
Associates Sidney P Williamson,PE.,L.S.• Robert F.Kotsmith
Offices:St.Raul,Rochester,Willmar and St.Cloud,MN•Milwaukee,WI
Engineers &Architects
March 13, 1998 IE OWE
Mr. Thomas Melena, Administrator v
City of Oak Park HeightsMAR 17 1998
14168—57th Street North
P.O. Box 2007
Oak Park Heights, MN 55082-2007
Re: Osgood Pathway Easement
Our File No. 55
Dear Tom:
Enclosed please find a drawing showing the existing contours and proposed grading required to
install an eight-foot wide pathway along the east side of Osgood Avenue from 56th Street to
Upper 56th Street. The pathway is shown in yellow and would be five feet from the back of
existing curb.
A twenty-foot wide easement would be required on the Krongard lot, which is Lot 1, Block 1,
Valley View Estates 2"d, to accommodate the filling which will be required as shown on the
drawing. However, only a five-foot wide easement is required for the pathway itself if it is
located five foot off of the back of curb.
Mr. Krongard has previously objected to providing a 20-foot wide easement along this lot.
Therefore, it is suggested that Mr. Krongard be required to grade the area adjacent to Osgood
Avenue as shown and provide a five-foot wide permanent easement for the pathway.
It should be noted that the pathway location proposed allows the existing power poles to remain
in place but eventually a telephone pedestal would have to be relocated. The grading activity will
require the removal or relocation of the five evergreen trees planted adjacent to the Krongard lot
as well as other trees and vegetation within the grading limits shown on the plan.
If you have any questions on this matter, please do not hesitate to call me at 604-4833.
Very truly yours,
BONESTROnO, ROSENE, ANDERLIK&ASSOCIATES, INC.
•
C.. Q44,pai
Josep C. Anderlik
JCA:gs •
2335 West Highway 36 • St. Paul, MN 55113 • 612-636-4600 • Fax: 612-636-1311
i
'9 `_
•
N
I `\
_-_________ %\ 0
/
/ k----
/ J ti's i ai ' \\I
`
•......i......... ... •, •ii • .m.m..m•.mm.im.m..m.ii.•.imiImmm•ii..:
/ I
1, // 1
/0 1
/ • I
—s-• �-��—
11 / 'lb' ` I
S 1
11 1
Nty
\ t7buG�Sk7d SI
\ 8 I Z
v \ \ • s
\ I
LI
ecC
\ I- 968 --- _ 1
CI
6g I
L ' It 2 1 1 k.5.
\ . -i
_ 8 �
8 � \ 1L 1.
988,., 1 1 1 1 tr:.1141
� , I
" \ 4 .
\ t ;
11/� / /
-G 1 / / /
eit co / 3 :Ili
1,,/ ,co
,/ _w
1
1 ...
/ - A N''.
:::\
/ /
// 1.`� ti III
I� ,
III
/ / � � t III
Lar
// /// �jr( III
/ / I III
4
_j = - 11= N
/i6N No_,\
1 --1- ` N
\\I//_______:/_ _l �
-t I
I
• LAW OFFICES OF S
Eckberg. Lammers. Briggs. Wolff & Vierling. P.L.L.P.
1835 Northwestern Avenue
Lyle J. EA6erg Stillwater. Minnesota 55082 D
Jamesl . Lammers Susan D. Olson
F.
(612) 439-2878 David K. Snyder
RoLert G. Briggs**
J. Vierling*
FAX (612) 439-2923 Lrosk Pt(etich*
Gregory G. Ga(ler. Direct Dial No. : (612) 351-2118 Pdul A. Wolff
Thomas J. Weidner* 0044-1996)
*Q°alit ed Neutral .arbitrator& Mediator
January 12, 1998
*Qualified Neutral Arbitrator
*Certified Real Estate Specialist
Mr. Jack Krongard Fir
Krongard Construction Company (I)
14791 - 60th Street North
Stillwater, Minnesota 55082
Re : Valley View Addition/Valley View Estates II
Dear Jack:
I talked to you last September with regard to
bike/walkway easement along Osgood Avenue affecting these two
subdivisions. At that time, you advised me that you would have Mr.
Kurth prepare the necessary descriptions so that the 20 foot wide
easement could be conveyed to the City. The same would obviously
not have any, impact on the developability of the affected
properties .
I have not heard anything from Randy or .you since that
time . We need to get these matters cleared up and I would
appreciate if you could get those descriptions in here as soon as
possible . If you have any questions or if there are concerns with
regard to this matter, please contact me directly.
Yours very truly,
Mark J. Vierling
MJV/sdb
Enclosure
cc : . Judy Holst
•
D
JAN 1 3 1998
row,: • E.
, 7,7),
AUG3 11998
VALLEY VIEW CONDOMINIUMS NORTH ASSO• 1 •
% DONNA S. GRAY
14812 58TH STREET NORTH #3D
OAK PARK HEIGHTS MN 55082-6396
TEL: 651-430-0822
August 28, 1998
Thomas M. Melena
Administrator
City of Oak Park Heights
14168 North 57th Street
Oak Park Heights MN 55082-2007
Dear Mr. Melena: •
We are currently working with Jim Butler to resolve some issues between the City of Oak
Park Heights,Jack Krongard and our Association. Jim Butler has been very helpful in
resolving some of these issues with Jack Krongard. There are a few that remain
unresolved that are of great concern to the homeowners of Valley View Condominiums
North Association. We are asking the City's assistance to resolve these issues in a timely
fashion.
The first issue is the drainage problem coming from the Assembly of God Church into
our development. The Church is located immediately to the West of our development.
Jim Butler indicated he was going to meet with the City Engineer to look into this matter.
He also indicated that the Church has limited funds to make any changes in the current
situation. We would like to see a copy of the grading plan that the City of Oak Park
Heights approved per the Developer's Agreement with Jack Krongard. All the water
from the Church parking lot flows down a spillway into our private street and therefore
we often have standing water. The only drains on our property are located just north of
the entrance and these drain into holding ponds, which are maintained by our association.
•
•
� }
According to Jim Butler in his letter dated August 19, 1998 to Jack Krongard the water
that comes down from the grass area to the North of the church should be corrected to
prevent water filling the cores of the blocks on Units 3D and 4D. Should this occur,
damages to the foundation and slab are very possible and would be a costly repair. The
address for these units is 14812 58th Street North. If our current drainage system doesn't
meet the grading plan as approved by the City we expect the City will work with Jack
Krongard, at either Jack Krongard or the City's expense,to make the necessary repairs.
The second issue is the retaining wall located between our property and the Church.
When Jack Krongard built the wall there was a gap on the North side of the spillway.
This gap caused erosion of the embankment and a constant flow of rocks, sand and debris
into our street. This created additional maintenance to the Association to return the rocks
to the embankment after each heavy rainfall. This problem was brought up to Jack
Krongard last January 1998, following turnover of the board to the homeowners. At that
time,he actually inspected the problem and agreed to pay for V2 the cost of additional
blocks to extend the wall up the North side of the spillway. He would not agree to pay
any labor to install the blocks. Because of the problems the Association hired
Northwestern Masonry to complete the wall at a cost of$835.00. The cost of the blocks
was $219.65 bringing the total cost to the homeowners of our Association to $1,127.65,
of which Jack Krongard reimbursed$146.32. We requested Jim Butler to do research
into the Landscaping Plan approved by the City for this development. Jim Butler
indicated that Jack Krongard proposed a four-foot retainingwall but that there was no
g p Po
record of the City's acceptance of this plan. The current wall as it stands today is not
four feet high. Jim Butler agreed to address the height concerns with Jack Krongard but
that still leaves our homeowners bearing the expense to alleviate the erosion problem on
the North Side of the spillway. We expect full reimbursement from the City or Jack
Krongard for this expense.
There are numerous other repairs that need to be addressed by Jack Krongard—far too
many to list. These items are things that were never completed upon homeowner
possession of the property. We are attaching copies of two memos written to Krongard
addressing some of these repairs. One is dated February 24, 1998 and the other August
12, 1998.
Our Association funds are for maintenance only and not to correct problems that have
arisen from negligence on the part of the City or the builder. We are looking to the City
of Oak Park Heights to resolve these issues between it and Jack Krongard. We trust that
you will take care of these issues in a timely fashion.
i •
If you need further information or would like to discuss these issues please contact Linda
Carufel at 430-5914. Linda is now Chairman of the committee to resolve these issues.
She was the first homeowner in the development and has been involved with the
Association from the beginning.
We trust you,Jim Butler, and the City of Oak Park Heights will stand firm on the
position stated in Jim Butler's letter of July 30, 1998 to Jack Krongard and not issue
permits of any kind or do inspections requested for the 8-unit complex presently under
construction until issues are resolved to the satisfaction of all parties concerned.
Sincerely yours,
James R. Meyer,President
Valley View Condominiums North Association
Donna S. Gray, Treasurer
Valley View Condominiums North Association
Attachments 2:
Memo to Jack Krongard dated February 24, 1998
Memo to Jack Krongard dated August 12, 1998
Cc: MayetiodCouncit
Jim Butler,Building Official
Jay Johnson,Public Works Director
Scott Richards,City Planner
Joe Anderlik, City Engineer
Mark Vierling, City Attorney
Melanie Mesko
Linda Carufel
• s
LAW OFFICES OF
Eckberg, Lammers. Briggs. Wolff ( Vierling. P.L.L.P.
1835 Northwestern Avenue
Lyle J. Eokberg - Stillwater. Minnesota 55082 David K. Snyder
James F. Lammers (612) 439-2878 Urosh Piletioh*
Robert G. Briggs* FAX (612) 439-2923 Paul A. Wolff
Mark J. Vierlis; (� 2(� �.7 I (1944-199(1)
Gregory G. Cial VC L/ cC Disl No. : (6121 351-2118 *Qual:fued Neutral Arbitrator&Mediator
Thomas J. Weid% 441.61;1%0d Neetrel Ar6itrator
Susan D. Olson APR 13 1998 April 9, 1998 *Gertifie.'Real Estate Speoielisl'
Registrar of Titles
Washington County Government Center
14900 - 61st Street North C O py
Stillwater, Minnesota 55082
Re : Valley View Estates and Valley
View Estates 3rd Addition
Dear Sir or -Madame:
Enclosed herewith please find two Public Walkway and Bike
Path Easements and Agreements . Also enclosed please find Owner' s
Duplicate Certificate of Title No. 47840 regarding Outlots A & B,
Valley View Estates and Owner' s Duplicate Certificate of Title No.
49546 regarding Lot 1, Block 1, Valley View Estates 3rd Addition.
Please memorialize each easement on the appropriate certificate of
title, and upon completion of this transaction, return the ODC' s to
the undersigned. Also enclosed are this firm' s checks in total the
amount of $39. 00 for the recording fees. If you have any questions
regarding this matter, please do not hesitate to contact me.
Yours very truly,
Mark J. Vierling
MJV/sdb
Enclosure
cc : Thomas Melena (w/o enc)
• • .
LAW OFFICES OF
Eekberg. Lammers. Briggs. Wolff & Vierling. P.L.L.P.
1835 Northwestern Avenue
Lyle J. EolC6erg Stillwater. Minnesota 55082 David K. Snyder
James F. Lammers (612) 439-2878 - Urosli Piletiok*
Robert G. Briggs* FAX (612) 439-2923 Paul A. Wo111
Mark J. Vierling* (1944-1996)
Gregory G. Gallere Direct Dial No. : (612) 351-2118 ,tQ.a1�G.J N..t►J Arbar.ter&M.J60.r
'Roses J. Weidner* eQ.al:f:.J Neutral AA:tr.ter
$esas D. Olson March 27, 1998 .C.rtif:.J R.aI Estea.S,..:.l:.t
MAR30
Mr. Jack Krongard CGOMC
0 P
Krongard Construction Company
14791 - 60th Street North
Stillwater, Minnesota 55082
Re: Valley View Addition/Valley View Estates II
Dear Jack:
Following up on the meeting that you have had with Tom
Melena and upon receipt of the survey materials we have received
from Mr. Kurth, I have prepared and am forwarding to you a public
walkway and bike path easement for each of the affected lots. I am
asking that you sign both where indicated and return same to the
City of Oak Park Heights along with the Owner' s Duplicate
Certificates of Title for Lot 1, Block 1, Valley View Estates 3rd
Addition and Outlot B, Valley View Estates.
Thereupon, the City will undertake to secure the -
recording of the documents and return of the Owner' s Duplicates to
you as soon as the recording process has been completed.
If you have any questions with regard to same, please
feel free to contact me directly.
Yours very truly,
Mark J. Vierling
MJV/sdb
Enclosure
cc : Thomas Melena, City Administrator
o !Y
PUBLIC WALKWAY AND BIKE PATH
EASEMENT AND AGREEMENT
THIS INDENTURE, made this day of
1998, by and between ST. CROIX LAND COMPANY, INC. , a corporation
under the laws of the State of Minnesota, party of the first part;
and the CITY OF OAK PARK HEIGHTS, Washington County, Minnesota,
party of the second part.
WITNESSETH:
WHEREAS, the above-named party of the first part is the
owners in fee simple of the real estate hereinafter described.
That for and in consideration of the sum of One and
00/100 Dollars ($1 . 00) and other good and valuable consideration,
the receipt of which is hereby acknowledged, the party of the first
part has this day bargained and sold, and by these presents does
bargain, sell and transfer unto the City of Oak Park Heights, its
successors and assigns the following:
A perpetual easement for public walkway, bike path, and
pedestrian crossing purposes with the right to enter upon the real
estate hereinafter described at any time that it may see fit, and
construct, maintain, repair and replace any lines, equipment,
materials, or other items for public roadway and public walkway,
for the purpose of maintaining, repairing or replacing the said
public roadway and public walkway over, across, through and under
the lands hereinafter described, together with the right to
excavate and refill ditches and/or trenches for the location of
said public roadway and walkway, and the further right to remove
• •
trees, bushes, undergrowth, and other obstructions interfering in
the location, construction and maintenance of said public roadway
and walkway.
That said perpetual public walkway easement located in
the County of Washington, State of Minnesota, is described as
follows, to-wit :
A perpetual easement for roadway and walkway purposes in
favor of the City of Oak Park Heights, over that part of
Outlot B, VALLEY VIEW ESTATES, lying westerly of a
straight line drawn 20 feet easterly of and parallel with
the most westerly line of said Outlot B.
TO HAVE AND TO HOLD, said perpetual easement and right-
of-way unto the City of Oak Park Heights, Washington County,
Minnesota, its successors and assigns, forever.
The party of the first part does hereby covenant with the
City of Oak Park Heights, that it is lawfully seized and possessed
of the real estate above described.
It is understood and agreed that the party of the second
part will restore said lands to as good or better a condition as it
was prior to the time of any excavation for public walkway or any
other purpose, and that party of the second part will restore any
fencing that it is necessary to remove or becomes damaged during
the process of any excavation.
It is further understood and agreed that the party of the
second part will forthwith re-sod all areas, where necessary, on
said lands from which it is necessary to remove or damage the sod
thereon, during the process of any excavation.
2
S •
It is further understood that the party of the second
part will replace all driveways and sidewalks which it is necessary
to remove or damage during the process of any excavation.
IN WITNESS WHEREOF, the said parties have caused this
instrument to be executed the day and year first above written.
IN PRESENCE OF: PARTY OF THE FIRST PART:
ST. CROIX LAND COMPANY, INC.
By:
By:
STATE OF MINNESOTA )
ss .
COUNTY OF WASHINGTON)
On this day of 1998, before me,
a Notary Public, within and for said County and State, personally
appeared and
to me personally known, who, being each by me duly sworn did say
that they are respectively the and the
of St. Croix Land Company, Inc. , a Minnesota
corporation, named in the foregoing instrument, and that said
instrument was signed on behalf of St. Croix Land Company, Inc. , by
authority of its Board of Directors and said
and acknowledged said instrument to be the
free act and deed of said corporation.
Notary Public
3
111
•
IN PRESENCE OF: PARTY OF THE SECOND PART:
CITY OF OAK PARK HEIGHTS
By:
Its Mayor
By:
Its Administrator
STATE OF MINNESOTA )
ss.
COUNTY OF WASHINGTON)
On this day of , 1998, before
me, a Notary Public, in and for said County and State, appeared
David Schaaf and Thomas Melena, to me personally known, who being
by me first duly sworn, did say that they are respectively the
Mayor and Administrator of the City of Oak Park Heights, by
authority of the City Council of the City of Oak Park Heights, and
said Mayor and Administrator acknowledge said instrument to be the
free act and deed of said City of Oak Park Heights .
Notary Public
THIS INSTRUMENT DRAFTED BY:
Mark J. Vierling
ECKBERG, LAMMERS, BRIGGS,
WOLFF & VIERLING, P.L.L.P.
1835 Northwestern Avenue
Stillwater, MN 55082
(612) 439-2878
0 PY
PUBLIC WALKWAY AND BIKE PATH
EASEMENT AND AGREEMENT
THIS INDENTURE, made this day of
1998, by and between ST. CROIX LAND COMPANY, INC. , a corporation
under the laws of the State of Minnesota, party of the first part;
and the CITY OF OAK PARK HEIGHTS, Washington County, Minnesota,
party of the second part.
WITNESSETH:
WHEREAS, the above-named party of the first part is the
owners in fee simple of the real estate hereinafter described.
That for and in consideration of the sum of One and
00/100 Dollars ($1.00) and other good and valuable consideration,
the receipt of which is hereby acknowledged, the party of the first
part has this day bargained and sold, and by these presents does
bargain, sell and transfer unto the City of Oak Park Heights, its
successors and assigns the following:
A perpetual easement for public walkway, bike path, and
pedestrian crossing purposes with the right to enter upon the real
estate hereinafter described at any time that it may see fit, and
construct, maintain, repair and replace any lines, equipment,
materials, or other items for public roadway and public walkway,
for the purpose of maintaining, repairing or replacing the said
public roadway and public walkway over, across, through and under
the lands hereinafter described, together with the right to
excavate and refill ditches and/or trenches for the location of
said public roadway and walkway, and the further right to remove
• •
trees, bushes, undergrowth, and other obstructions interfering in
the location, construction and maintenance of said public roadway
and walkway.
That said perpetual public walkway easement located in
the County of Washington, State of Minnesota, is described as
follows, to-wit:
A perpetual easement for roadway and walkway purposes in
favor of the City of Oak Park Heights, over that part of
Lot 1, Block 1, VALLEY VIEW ESTATES 3RD ADDITION, lying
westerly of a straight line drawn 20 feet easterly of and
parallel with the most westerly line of said Lot 1.
TO HAVE AND TO HOLD, said perpetual easement and right-
of-way unto the City of Oak Park Heights, Washington County,
Minnesota, its successors and assigns, forever.
The party of the first part does hereby covenant with the
City of Oak Park Heights, that it is lawfully seized and possessed
of the real estate above described.
It is understood and agreed that the party of the second
part will restore said lands to as good or better a condition as it
was prior to the time of any excavation for public walkway or any
other purpose, and that party of the second part will restore any
fencing that it is necessary to remove or becomes damaged during
the process of any excavation.
It is further understood and agreed that the party of the
second part will forthwith re-sod all areas, where necessary, on
said lands from which it is necessary to remove or damage the sod
thereon, during the process of any excavation.
2
S •
It is further understood that the party of the second
part will replace all driveways and sidewalks which it is necessary
to remove or damage during the process of any excavation.
IN WITNESS WHEREOF, the said parties have caused this
instrument to be executed the day and year first above written.
•
IN PRESENCE OF: PARTY OF THE FIRST PART:
ST. CROIX LAND COMPANY, INC.
By:
By:
STATE OF MINNESOTA
ss .
COUNTY OF WASHINGTON)
On this day of , 1998, before me,
a Notary Public, within and for said County and State, personally
appeared and
to me personally known, who, being each by me duly sworn did say
that they are respectively the and the
of St . Croix Land Company, Inc. , a Minnesota
corporation, named in the foregoing instrument, and that said
instrument was signed on behalf of St . Croix Land Company, Inc. , by
authority of its Board of Directors and said
and acknowledged said instrument to be the
free act and deed of said corporation.
Notary Public
3
410 110
IN PRESENCE OF: PARTY OF THE SECOND PART:
CITY OF OAK PARK HEIGHTS
By:
Its Mayor
By:
Its Administrator
STATE OF MINNESOTA )
ss .
COUNTY OF WASHINGTON)
On this day of , 1998, before
me, a Notary Public, in and for said County and State, appeared
David Schaaf and Thomas Melena, to me personally known, who being
by me first duly sworn, did say that they are respectively the
Mayor and Administrator of the City of Oak Park Heights, by
authority of the City Council of the City of Oak Park Heights, and
said Mayor and Administrator acknowledge said instrument to be the
free act and deed of said City of Oak Park Heights .
Notary Public
THIS INSTRUMENT DRAFTED BY:
Mark J. Vierling
ECKBERG, LAMMERS, BRIGGS,
WOLFF & VIERLING, P.L.L.P.
1835 Northwestern Avenue
Stillwater, MN 55082
(612) 439-2878
•
LAW OFFICES OF
Eckberg. Lammers, Briggs, Wolff & Vierling, P.L.L.P.
1835 Northwestern Avenue
Lyle J. Eckberg Stillwater, Minnesota 55082 David K. Snyder
James F. Lammers (612) 439-2878 Urosh Piletich*
Robert G. Briggs** FAX (612) 439-2923 Paul A. Wolff
Mark J. Vierling* (1944-1996)Gregory G. Galled Direct Dial No. : (612) 351-2118 *Qualified Neutral Arbitrator&Mediator
Thomas J. Weidner* *Qualified Neutral Arbitrator
Susan D. Olson March 4, 1998 *Certified Real Estate Specialist
Mr. Thomas Melena
City Administrator
City of Oak Park Heights
14168 —57th Street North
P.O. Box 2007
Oak Park Heights, Minnesota 55082
Re : Krongard Construction Company - Valley View Addition
and Valley View Estates II
Dear Tom:
As per my conversation with you, I am providing you with
a checklist of issues that need to be resolved dealing with Mr.
Krongard. To my knowledge, those issues are as follows :
1 . Public Works . The Public Works Department has
received a number of complaints from property owners in the
development as it affects the billing for water services .
Certainly check with Roger on the issue, but it is my understanding
that members of the homeowners association feel that they are being
• billed for water services, particularly as it affects outdoor,
automatic sprinkling systems that are on other properties . This is
largely an issue between the developer and the individual property
owners, but, of course, it is the City staff that is receiving the
complaints .
2 . Engineering Issues . There is a drainage structure
located upon the property that needed to be raised or altered as a
result of the developer regrading in the area to address storm
water drainage problems . The developer' s position is that the
drainage structure was originally in place before he got there and
he does not feel he should have to be responsible for the
reconstruction or raising of that structure . Engineering' s
position is that the nature of the regrading that took place out
Mr. Thomas Melena
March 4, 1998
Page 2
there by the developer is what necessitated the adjustment which is
required to be made to the drainage structure and they feel it is
his responsibility to make the adjustment . The drainage structure,
I understand, will cost approximately $2, 500 . 00 to make the
appropriate adjustment . Copy of the original Development Agreement
(unsigned) is provided. You will note that on Page 5, Subparagraph
K. , developer is required to dedicate and survey all drainage,
storm water, and holding ponds as required by the City and is also
responsible for storm sewer cleaning and holding pond dredging,
etc. You will also note that on Page 1 under Plan A Improvements,
Subparagaph A. , the developer is responsible for site grading
subject to the approval of the City Engineer. My understanding is
that the position of the engineers is that the particular problems
in place on the property are primarily the result of the grading
done by the developer and, hence, the dispute that exists .
3 . Easements . There are two sets of easements required
of Mr. Krongard. One was an access easement to get into Valley
View Park that has already been secured. The other remaining set
of easements that we were to obtain from him dealt with
bikeway/pathway easements 20 feet in length going along Osgood
Avenue. Mr. Krongard was to provide the legal descriptions and the
easements as he is still under ownership of the lots that are
immediately impacted on the property.
I am enclosing a copy of a letter that I sent to Mr.
Krongard dated January 12 following up on a conversation that I had
with him again in September of 1997 following up on these very
easements .
Mr. Krongard has consistently told me that he was
having Mr. Randy Kurth, the surveyor, prepare these easements and
that they would be provided to me. Of course, it has been several
months and we have yet to see same.
Judy advises me that she has received a bill from
Mr. Kurth for the surveying services, which I do not object to the
City picking up as I assume it is relatively small and the
easements are for our benefit; however, we have not seen the legal
descriptions nor have we been provided with the easements by Mr .
Krongard. Given the length of time that has transpired, we would,
of course, have to re-check the status of title to make sure that
S •
Mr. Thomas Melena
March 4 , 1998
Page 3
Mr. Krongard is still in position to be able to convey these
easements. My sense is that these easements have been caught up in
the dispute between Mr. Krongard and engineering as it affects the
drainage structure and are being held hostage at this point in
time.
4 . Finance. Judy has advised me previously that she
either has some bills owing from Mr. Krongard on this or other
projects and/or may have funds which need to be returned to him.
This, of course, needs to be wrapped up at the same time as the
other issues are concluded.
Within the City' s file you should be able to find signed
copies of the two Development Agreements, one for Valley View
Addition, the second for Valley View Estates, and also the planning
reports that deal with this matter. Engineering reports should
also be in the file, although you may wish to check with Joe
Anderlik directly with regard to the dis• - ed drainage structure.
If I can be of further assistance in th' ma er, please feel free
to contact me directly.
Your% ve truly,
/J. Vi
MJV/sdb
Enclosure
cc: Scott Richards (via fax)
Joe Anderlik (via fax)
S
LAW OFFICES OF
Eckberg, Lammers, Briggs. Wolff & Vierling, P.L.L.P.
1835 Northwestern Avenue
Lyle J. Ect(zberg Stillwater, Minnesota 55082 David K. Snyder
James F. Lammers (612) 439-2878 Urosh Piletioli*
Robert G. Briggs*.. FAX (612) 439-2923 Paul A. Wolff
Mark J. Vierling*
Gregory G. Galler• Direct Dial No. : (612) 351-2118 )
*Qualified Neutral Arbitrator
1f4Mediator
4-199
Thomas J. Weidner* *Qualified Neutral Arbitrator
Susan D. Olson January 12, 1998
*Certified Real Estate Specialist
Mr. Jack Krongard
Krongard Construction Company
14791 - 60th Street North
Stillwater, Minnesota 55082
Re : Valley View Addition/Valley View Estates II
Dear Jack:
I talked to you last September with regard to
bike/walkway easement along Osgood Avenue affecting these two
subdivisions . At that time, you advised me that you would have Mr.
Kurth prepare the necessary descriptions so that the 20 foot wide
easement could be conveyed to the City. The same would obviously
not have any impact on the developability of the affected
properties .
I have not heard anything from Randy or you since that
time . We need to get these matters cleared up and I would
appreciate if you could get those descriptions in here as soon as
possible . If you have any questions or if there are concerns with
regard to this matter, please contact me directly.
Yours very truly,
Mark J. Vierling
MJV/sdb
Enclosure
cc: Judy Holst
s �r
CITY OF OAK PARK HEIGHTS
WASHINGTON COUNTY, MINNESOTA
DEVELOPER' S AGREEMENT
THIS AGREEMENT, made and entered into this day of
, 1995, by and between the City of Oak Park
Heights, a municipal corporation under the laws of the State of
Minnesota (the "City" ) , and St . Croix Land Company, Inc . (the
"Developer" ) .
WITNESSETH; That :
WHEREAS, the Developer has made application to the City
Council for approval of a plat of land within the corporate limits
of the City described as follows :
•
See Attached Exhibit A.
(the "Subdivision" ) ; and,
WHEREAS, the City Council has on , 1995, granted
preliminary approval to the Subdivision, on the condition that the
Developer enter into this Agreement stipulating the conditions for
the installation of street, water, sewer and other public
improvements as well as the development of on-site improvements
hereinafter described, all in accordance with the terms and
conditions hereinafter set forth.
NOW, THEREFORE, in consideration of the premises and of the
mutual promises and conditions hereinafter contained, it is hereby
agreed as follows :
Designation of Improvements : Improvements to be installed at
Developer' s expense by the Developer as hereinafter provided are
hereinafter referred to as "Plan A Improvements" . Improvements to
be installed by the City and paid for by Developer are hereinafter
referred to as "Plan B Improvements" .
1 . PLAN A IMPROVEMENTS: The Developer will construct at
Developer' s expense the following improvements under Plan
A according to the following terms and conditions :
A. The Developer shall do all site grading, common
greenway and open spaces, storm water storage
ponds, surface drainage ways and all private
driveways including sodding of boulevards, all in
accordance with the approved grading, drainage and
site plan. A grading plan with maximum two (2)
foot contours, house pad elevations, drainage
provisions, erosion control provisions and cross
sections, as necessary, shall be submitted to and
approved by the City prior to commencement of any
! i
site grading. Any changes to the grading plan
during construction shall be submitted to the City
for approval . Individual building sites including
private driveways are to be customed graded to
preserve the maximum number of trees on each site .
Unless waived by the Building Inspector, each
building site must have an individual grading plan
separately approved by the Building Inspector of
the City of Oak Park Heights prior to a building
permit being issued.
B. The Developer shall control soil erosion ensuring:
1 . All development shall conform to the natural
limitations presented by the topography and
soil of the subdivision in order to create the
best potential for preventing soil erosion.
The Developer shall submit an erosion control
plan, detailing all erosion control measures
to be implemented during construction, said
plan shall be approved by the City prior to
the commencement of site grading or
construction.
2 . Erosion and siltation control measures shall
be coordinated with the different stages of
development . Appropriate control measures as
required by the City Engineer shall be
installed prior to development and as may be
necessary to control erosion.
3 . Land shall be developed in increments of
workable size such that adequate erosion and
siltation controls can be provided as
construction progresses . The smallest
practical area of land shall be exposed at any
one period of time .
4 . Where the topsoil is removed, sufficient
arable soil shall be set aside for respreading
over the developed area. The topsoil shall be
restored to a depth of at least four (4)
inches and shall be of a quality at least
equal to the soil quality prior to
development .
5 . On all residential properties, the Developer
or his designee shall provide finished grading
with a topcoat of black dirt and sod in the
front and side yards. The back or rear yards
of all residential properties shall be sodded
or seeded at the developer' s option. No
certificate of occupancy or final inspection
approval shall be granted by the Building
• •
Inspections Department of the City of Oak Park
Heights until compliance of this provision has
been met with this requirement .
C. The Developer shall place iron monuments at all lot
and block corners and at all other angle points on
boundary lines . Iron monuments shall be placed
after all street and lawn grading has been
completed in order to preserve the lot markers for
future property owners .
D. The Developer shall be responsible for maintaining
the location of and protecting curb stops, water
services and sewer services . Any service or curb
stop damaged shall be repaired or replaced as
specified by the City. The Developer shall make
all necessary adjustments to the curb stops to
bring them flush with the topsoil (after grading)
or driveway surface .
•
E. The Developer shall be required to provide
landscaping and screening as determined by the City
and as required by the ordinances of the City. In
all instances one boulevard tree should be planted
by Developer per dwelling unit . In no instance
shall the Developer plant more than 50 percent of
the same type of tree. A detailed landscape plan
shall be submitted to and require the approval by
the City prior to commencement of final platting
and landscaping construction.
F. The Developer shall install all street name signs
at all intersections and provide other traffic
control signs within the subdivision as determined
to be necessary by the City. Temporary street name
signs shall be installed by the Developer prior to
issuance of the first building permit . The
temporary sign shall be constructed of durable
materials to be approved by the Building Official.
G. The Developer shall remove all diseased trees
before building permits will be issued as to any
individual lot . As it affects the removal of dead
trees and vegetation on any individual lot, the
same shall be addressed within the individual
grading plan to be submitted to the Building
Inspector of the City of Oak Park Heights at each
time that a building permit is sought with regard
to the construction of a single family residence as
to any individual lot . The Building Inspector
shall determine in conjunction with the City
Forester, the need to remove dead vegetation upon
3
411
any individual lot as part of the custom grading to
be implemented on each lot relating to the
construction of any residential dwelling thereon.
H. The Developer shall be responsible for street
maintenance, including curbs, boulevards, sod and
street sweeping until the project is complete . All
streets shall be maintained free of debris and soil
until the subdivision is completed. Warning signs
shall be placed when hazards develop in streets to
prevent the public from traveling on same and
directing attention to detours . If and when the
street becomes impassible, such streets shall be
barricaded and closed. In the event residences are
occupied prior to completing streets, the Developer
shall maintain a smooth driving surface and
adequate drainage on all temporary streets . The
Developer shall be responsible for the removal of
snow from all gravel streets . The repair of any
damage done to the streets or public utilities
shall be the financial responsibility of the
Developer.
I . The Developer shall furnish street lights in
accordance with the City' s residential street
lighting policy.
General Requirements :
1 . Residential street lighting shall be owned,
installed, operated and maintained by the
• electric utility company (NSP) . City and
utility company shall enter into a contractual
agreement on the rate and maintenance of the
street lighting system.
2 . It shall be the responsibility of the
Developer to:
a. Reimburse the City for the first two (2)
years of operating cost of the street
lighting system.
b. Pay the electric utility company any cost
incurred in the installation of the
street lighting units not covered in the
electric utility company rate for this
service. This payment shall be required
to be guaranteed as part of the Plan A
security.
c . The two year payment schedule (policy)
4
• •
shall be put into effect upon
installation of each lighting unit .
d. All these costs shall be guaranteed by
part of the Plan A security.
J. The Developer shall, in all new subdivisions,
dedicate a reasonable portion of each proposed
subdivision as the City Council reasonably
determines to the public for public uses as parks,
playgrounds, public open space, trails, or other
conditions as required by the City. Developer
shall dedicate pedestrian/bike trail easement areas
to the City of Oak Park Heights as specified on the
plat and approved by the Oak Park Heights Park
Commission this dedication is credited against the
total park dedication requirement .
The Developer for the balance of the plat for of
Valley View Estates II shall pay to the City of Oak
Park Heights the sum of $12 , 580 . 00 on execution of
this Agreement .
K. The Developer er shall
dedicate and survey all
drainage storm water and hold ponds as required by
the City. The Developer shall be responsible for
storm sewer cleaning and holding pond dredging, as
required, by the City prior to completion of the
development .
L. The Developer shall be required to depict possible
future bus routes and surrounding land uses
including parks and all scheduled improvements on
all display materials and brochures given to
prospective buyers .
M. The Developer shall be responsible for securing all
necessary approvals and permits from all
appropriate federal, state, regional and local
jurisdictions prior to the commencement of site
grading or construction and prior to the City
awarding construction contracts for public
utilities.
•
N. Drainage and utility easements . 10 foot drainage
and utility easements shall be provided along all
lot lines .
O. Wetland Designation. All areas classified as
wetlands shall be displayed upon the plat and those
so specified by the City Engineer be dedicated to
the public for that purpose .
5
411
2 . DESCRIPTION OF IMPROVEMENT ESTIMATED COST
1 . Boulevard and swale sod $ 5, 700 . 00
2 . Boulevard trees 5, 600 . 00
3 . Street signs 850 . 00
4 . Street lights 2, 880 . 00
5 . Erosion Control 3, 600 . 00
6 . Pond Protection & Restoration 1, 000 . 00
7 . Utility protection and repair 6, 680 . 00
6 . Street protection and repair 8, 790 . 00
TOTAL ESTIMATED CONSTRUCTION COST 35, 100. 00
OF PLAN A IMPROVEMENTS: $
ESTIMATED ENGINEERING, LEGAL AND
ADMINISTRATIVE (20%) : $ 7, 000 . 00
TOTAL ESTIMATED CONSTRUCTION COST 42, 100 . 00
OF PLAN A IMPROVEMENTS : $
SECURITY REQUIREMENT (25%) $ 10 , 500 . 00
TOTAL PLAN A ESCROW $ 52, 600 . 00
3 . CONSTRUCTION OF PLAN A IMPROVEMENTS.
A. Construction. The construction, installation,
materials and equipment shall be in accordance with
the plans and specifications approved by the City.
B. Inspection. All of the work shall be under and
subject to the inspection and approval of the City
and, where appropriate, any other governmental
agency having jurisdiction.
C. Easements . The Developer shall dedicate to the
City, prior to approval of the final plat, at no
cost to the City, all permanent or temporary
easements necessary for the construction and
installation of the Plan A and AllPlan such Improvements
ements
as determined by the City.
required by the City shall be in writing, and in
recordable form, containing such terms and
conditions as the City shall determine.
6
D. Faithful Performance of Construction Contracts .
The Developer will fully and faithfully comply with
all terms and conditions of any and all contracts
entered into by the Developer for the installation
and construction of all Plan A Improvements and
hereby guarantees the workmanship and materials for
a period of one year following the City' s final
acceptance of the Plan A Improvements .
Concurrently with the execution hereof by the
Developer, the Developer will furnish to, and at
all times hereinafter maintain with the City, a
cash deposit, certified check, or an Irrevocable
Letter of Credit, based on one hundred and twenty-
five percent (125%) of the total estimated cost of
Plan A Improvements as indicated in Section 2 . An
Irrevocable Letter of Credit shall be for the
exclusive use and benefit of the City of Oak Park
Heights and shall state thereon that the same is
issued to guarantee and assure performance by the
Developer of all the terms and conditions of this
Development Agreement and construction of all
required improvements in accordance with the
ordinances and specifications of the City. The
City reserves the right to draw, in whole or in
part, on any portion of the Irrevocable Letter of
Credit for the purpose of guaranteeing the terms
and conditions of this Agreement . The Irrevocable
Letter of Credit shall be renewed orreplaced i by
not later than thirty (30) days prior
r
s
expiration.
E. Reduction of Escrow Guarantee . The Developer may
request reduction of the Letter of Credit or cash
deposit based on prepayment or the value of the
completed improvements at the time of the requested
reduction. The amount of reduction will be
determined by the City and such recommendation will
be submitted to the City Council for action.
Following any payment for a Plan A improvement
which is within the Engineer' s estimate, the City
may consider and allow a reduction of the Letter of
Credit up to the rate of $1 . 25 for every dollar
that has been paid out of the escrow/Letter of
Credit provided that the project is on schedule,
the Developer is not in default under the terms of
the Development Agreement and/or no extraordinary
expenses beyond the engineering estimate have been
incurred during the course of the project .
4 . PLAN B IMPROVEMENTS. The following improvements will be
installed by the City at the Developer' s expense
according to the following terms and conditions :
7
411
•
1 . DESCRIPTION OF IMPROVEMENT ESTIMATED COST
A. Sanitary sewer $ 23 , 950 . 00
B. Water main 21, 010 . 00
C. House Services 26, 730 . 00
D. Storm sewer 61, 850 . 00
E. Base preparation 59, 290 . 00
F. Curb and gutter 18, 860 . 00
G. Surfacing streets 47, 500 . 00
TOTAL ESTIMATED CONSTRUCTION COST
OF PLAN B IMPROVEMENTS: $259, 190 . 00
ESTIMATED ENGINEERING, LEGAL AND
ADMINISTRATIVE (200) : $ 50, 810 . 00
TOTAL ESTIMATED CONSTRUCTION COST
OF PLAN B IMPROVEMENTS: $310, 000 . 00
SECURITY REQUIREMENT (25%) $ 77, 500 . 00
TOTAL PLAN B ESCROW $387, 500 .00
2 . That prior to the City ordering the installation
and awarding the contracts as it relates to the
Plan B improvements and the costs therefor, the
Developer shall deposit with the City of Oak Park
Heights, the total estimated cost of the Plan B
improvements plus a 25% security requirement
related thereto for a total of $387, 500 . 00 . The
City shall pay from said deposit all expenses
related to the construction of the Plan B
improvements providing for the construction of same
as follows :
A. Construction. After the preparation of
preliminary plans and estimates by the City,
the City Council shall take bids on the
projects and thereafter award the contract
pursuant to law for the installation of the
Plan B improvements under the City' s
supervision.
B. Escrow. No work shall be commenced under this
8
•
Agreement until the Developer shall have filed
with the City a cash deposit, certified check
or Letter of Credit (in a form to be approved
by the City Attorney) in the amount equal to
the total estimated cost of the Plan B
improvements plus a security requirement of
25% in the total amount of $387, 500 . 00 . The
City shall have the right to apply against the
Letter of Credit all bills incurred by the
City with regard to the Plan B improvements,
however, the City shall provide the Developer
the opportunity to pay for said improvements
as bills are incurred, in cash, rather than
applying payments as against the Letter of
Credit provided to the City, if a Letter of
Credit is used in lieu of a cash escrow by the
Developer. In such case, the Developer shall
have 10 business days from the time of
submission of the bill by the City to the
Developer to pay to the City such amount in
cash so that the City can use the payment to
pay the amount due in lieu of drawing down on
the Letter of Credit or other escrow on file
• with the City of Oak Park Heights.
C. The Developer shall be provided with a copy of
the plans and specifications as prepared by
the office of the City Engineer for the Plan B
improvements and shall be allowed the
opportunity to comment on same prior to final
release of the bid specifications by the
office of the City Engineer for purposes of
receiving bid on the improvements. The
Developer shall also be notified of the bid
opening date and provided the opportunity to
comment on the bids received prior to the
award of the bid on the Plan B improvements.
The Developer may recommend rejection of al
bids and the rebidding of the project or any
portion thereof; however, such recommendation
is not binding on the City of Oak Park Heights
and the City may award the contract based upon
the bids received if it, in its absolute
discretion, determines that the bids so
received are reasonable .
The Developer shall also be provided the
opportunity to request that the City Engineer
consider including certain contractors that
the Developer might suggest to be added to the
proposed bidder' s list . Final determination
of the proposed bidder' s list shall rest in
9
I 410
the discretion of the City Engineer.
D. All such improvements as constructed shall
become the property of the City of Oak Park
Heights. The Developer shall dedicate to the
City prior to approval of the final plat at no
cost to the City all permanent and temporary
easements necessary for the construction of
such improvements as determined by the City.
E. Contracts . All such construction contracts as
awarded by the City of Oak Park Heights to
construct the Plan B improvements shall
provide for a guarantee of the workmanship and
materials for a period of one year following
the completion of construction of the Plan B
improvements . All such contracts shall also
conform to the ordinances and specifications
of the City in the construction of all Plan B
improvements .
F. Reduction of Cash Deposit/Letter of Credit .
The City shall be allowed to draw upon the
cash deposit/Letter of Credit/escrow for the
payment of any and all construction contracts
awarded as it relates to the Plan B
improvements, or any portion or increment
thereof, upon certification by the City
Engineer of completion of construction of the
Plan B improvements, or any portion or
increment thereof . Upon final completion of
the Plan B improvements and certification of
same by the City Engineer, any remaining funds
on hand, provided as security to secure the
construction of the Plan B improvements, shall
be refunded to the Developer.
G. Chancre Orders . No change order increasing the
contract expense shall be authorized by the
City without first notifying Developer of the
change .
H. Estimates . The above estimates are
engineering projections only. Developer shall
be responsible for all actual expenses
incurred in the securing and installing of all
Plan B improvements .
I . Connection Charges. All connection charges
and fees shall be paid by Developer on a per
lot basis at the time that building permits
are obtained for each dwelling or principal
10
S 411
structure to be constructed. The City
Engineer shall compute the connection fee as
prescribed by ordinance/resolution as to this
development and advise the City Administrator
as to the appropriate fee to be collected. As
it affects this "Development" , the engineer
has calculated the total sanitary, water works
and storm sewer connection charges to be in
the amount of $1, 485 .44 per townhome unit .
$2 , 785 . 73 per single family unit and $2 , 151 . 35
per twin home unit .
5 . CASH ESCROW ACCOUNT. The Developer shall provide a
cash escrow account to the City of Oak Park Heights
in the amount of $ to reimburse the
City of Oak Park Heights for previous expenses
relating to this development . Developer shall also
al and
be responsible for future engineering, legal
administrative costs incurred by the City in the
process of supervising the implementat the on pubhis
this
development agreement relating to
improvements and other provisions effecting the
subject property. The Developer will be billed
periodically by the City for such expenses and pay
same within 10 days of presentation. Any disputes
•
over billings presented to the Developer shall be
resolved by the City Council who shall act as the
final authority to determine the reasonableness of
such charges .
6 . GENERAL:
A. Binding Effect . The terms and provisions
hereof shall be binding upon and inure to the
benefit of the heirs, representatives,
successors and assigns of the parties hereto
and shall be binding upon all future owners of
all or any part of the Subdivision and shall
be deemed covenants running with the land.
References herein to Developer, if there be
more than one, shall mean each and all of
them. The Agreement, at the option of the
City, shall be placed on record so as to give
notice hereof to subsequent purchasers and
encumbrances of all or any part of the
Subdivision and all recording fees, if any,
shall be paid by the Developer.
B. Final Plat Approval . The City agrees to give
final approval to the plat of the Subdivision
upon execution and delivery of this Agreement
and of all required documents and security,
11
• .
subject to compliance with the Ordinances of
the City and terms and provisions hereof,
permits may be issued by the City.
C. Incorporation of Reference . All plans,
special provisions, proposals, specifications
and contracts for the improvements furnished
and let pursuant to this Agreement shall be
and hereby are made a part of this Agreement
by reference as fully as if set out herein in
full . City Planner File No. 798 . 02 - 94 . 05 and
Engineering File No. 55120 are hereby
incorporated herein by reference.
D. The City of Oak Park Heights shall file the
Developer' s Agreement or a permit issued
pursuant thereto in the office of the County
Recorder. Providing that the Developer is not
in default under the terms of the Development
Agreement, the City shall provide appropriate
releases to the financial aspects of same and
documentation to individual buyers of lots .
E. As to any and all administrative, legal or
engineering costs which the Developer is
expected to pay to the City of Oak Park
Heights, which costs are to be offset against
the cash escrows or Letters of Credit which
the Developer has filed and provided to the
City of Oak Park Heights, the Developer shall
be given the opportunity to review and comment
on such costs prior to the application by the
City of Oak Park Heights to the escrow for the
payment of same . Notwithstanding the above,
the City of Oak Park Heights shall be the
final authority in determining the fairness
• and reasonableness of all such costs incurred;
and the decision by the City Council for the
City of Oak Park Heights on any such dispute
shall be binding.
F. Establishment of Construction Schedules. The
City Engineer shall establish construction
schedules for Plan A and Plan B improvements
and shall consult with Developer prior to
establishing same.
G. Zoning. All future use and development shall
comply with the applicable provisions of the
relevant zoning ordinance of the City of Oak
Park Heights relating thereto.
12
111 •
H. Signage . Should Developer or his heirs and/or
assigns desire any signage affecting
this
development it must be submitted by detail
sign plan to the City of Oak Park Heights and
approved prior to being implemented on the
site .
I . Street Grades . The grades of all streets
shall not exceed 8% and the minimum grade
shall not be less than . 5% .
this
IN WITNESS WHEREOF, City
on the Developer
teles na year first caused
above
Agreement to be duly executed
written.
In the presence of : CITY OF OAK PARK HEIGHTS
By
Barbara H. O'Neal
Mayor
Michael J. Robertson
Administrator
In the presence of : ST. CROIX LAND COMPANY, INC.
By
Its
By
Its
STATE OF MINNESOTA )
ss .
COUNTY OF WASHINGTON)
On this day of , 1995, before me a Notary
Public, within and for said County personally appeared Barbara H.
O'Neal and•Michael J. Robertson, to me personally known,
being each
by me duly sworn did say that they are respectively the Mayor and
the Administrator ofn he City of the foregoingak Park instrument Heights,
hand that municipal
ec
sealorporation named
13
• 111
affixed to said instrument is the corporate seal of said
corporation, and that said instrument was signed and sealed on
behalf of said municipal corporation by authority of ' its City
Council and said Mayor and Administrator acknowledged said
instrument to be the free act and deed of said municipal
corporation.
Notary Public
STATE OF MINNESOTA )
. ss .
COUNTY OF WASHINGTON)
On this day of , 1995, before me a Notary
Public, within and for said County personally appeared
and , to me personally known,
being each by me duly sworn did say that they are respectively the
and of
the corporation named in the foregoing instrument; and that the
seal affixed to said instrument is the corporate seal of said
corporation, and that said instrument was signed and sealed on
behalf of said municipal corporation by authority of its Board of
Directors and said and
acknowledged said instrument to be the free act and deed of said
municipal corporation.
Notary Public
THIS INSTRUMENT WAS DRAFTED BY:
Mark J. Vierling
Eckberg, Lammers, Briggs, Wolff
& Vierling, P.L.L.P.
1835 Northwestern Avenue
Stillwater, MN 55082
(612) 439-2878
oph\devagree\valleyII\March 3, 1998
14
S 411
LAW OFFICES OF
Eckberg, Lammers, Eriggs, Wolff & Vierling, P.L.L.P.
1835 Northwestern Avenue
Lyle J. Eckberg Stillwater. Minnesota 55082
David K. Snyder
James F. Lammers (612) 439-2878 Urosh Piletich*
Robert G. Briggs** FAX (612) 439-2923
Mark J. Vierling* Paul A. Wolff
Gregory G. Gaiter* (1944-1096)
Thomas J. Weidner,rCOVER SHEET - FACSIMILE TRANSMISSIOFQuali.ied Neutral Arbitrator&Mediator
Susan D. Olson *Qualified Neutral Arbitrator
*Certified Real Estate Specialist
DATE: March 4 , 1998
Please deliver the following page (s) to :
FAX NO: 439-0574
NAME: Tom Melena, Oak Park Heights City Administrator
FROM: Mark J. Vierling / Sandy
TOTAL NUMBER OF PAGES 19 , INCLUDING COVER SHEET.
The pages comprising this facsimile transmission contain
confidential information from Eckberg, Lammers, Briggs , Wolff &
Vierling. This information is intended solely for
individual or entity named as the recipient hereof . If you are n:
the intended recipient, be aware that any disclosure, copying ,
distribution, or use of the contents of this transmission is
prohibited. If you have received this transmission in error,
please notify us by telephone immediately so we may arrange to
retrieve this transmission at no cost to you . Violation of this
confidentiality notice could constitute a basis for a claim for
damages against the violation. If you received this communication
in error, please immediately notify us by telephone at (612) 439-
2878 .
IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL US
BACK AS SOON AS POSSIBLE AT (612) 439-2878
COMMENTS:
Re: Jack Krongard (dictated but not read)
* * * * * * * * * * *
HARD COPY WILL FOLLOW BY MAIL
411
MESSAGE CONF I RMAT I ON
03/04/98 09:08
ID=ECKBERG LAW
DATE SIR—TIME DISTANT STATION ID MODE PAGES RESULT
03/04 05'37" 4390574 CALLING 19 OK 0000
03/04/98 09:01 ECKBERG LAW 4 4390574
N0.316 P01
LAW OFFICES OF
Eckberg. Lammers. Briggs. Wolf & Vierling. P.L.L.P.
1835 Northwestern Avenue
Lyle J. EoLkierg Stillwater. Minnesota 55082
James E. �-•+peers Dacid K. Snyder
(012) 439-2878l)roa6 Pi�eiio�r►
Robert G. Briggs**
Marl J. Vierling* PAA (612) 438-2823 Past A. Wolff
Gregory G. GaIJer. (18444988)
nomasJ. Weidner* COVER SHEET FACSIMILE TRANSM=S,SI(24, .dNeer.)Arbileate.&1►I.Ji.lor
Sass° D. Olson
Ncatr.l Arbil/war
+.M;[i.d R..1 Est.th,Sp..;.liw
DATE: March 4 , 1998
Please deliver the following pages) to ;
FAX NO:
NAME: Tom Melena, Oak Park Heights City Administrator
FROM: Mark J. Vierling / Sandy
TOTAL NUMBER OF PAGES 19 , INCLUDING COVER SHEET.
The pages comprising this facsimile transmission cota_t:
confidential information from Eckberg, Lammers , Brig...7 , Wc: :
Vierling. This information is intended solea y i ,
individual or entity named as the recipient hereo ,
the intended recipient , be aware that any disc:L. iti
Il,
03/04/98 09:01 ECKBERG LAW * 43905?4 NO.316 DO1
• 11111
LAW OFFICES OF
Eckberg. Lammers. Briggs, Wolff & Vierling. P.L.L.P.
01835 Northwestern Avenue
Lyle J. EoLLer8 Stillwater. Minnesota 55082 Da.id K. S.yder
Janes F. L4m.�ers (6.12) 439-2878
�roa� Piletiodw
Robert G. Briggs**
FAX(612) 439-2923 Pool A. Wolff
Mark J. Vierling* (19+6-18410)
Gregory G. Geller.
Thomas J. Weidner* COVER SHEET - FACSIMILE TRAYSM=SSNear.)Arbiir.arisM.1.ter
Sosae D. Olson •Q. f cd N,.a.l Arbitrator
*C.nifi.d
DATE: Marc 4. 1998
Please deliver the following page (s) to :
• FAX NO: 439-0574
NAME: Tom Melena. Oak Park Heights City Administrator
FROM: Mark J. Vierling / Sandy
TOTAL NUMBER OF PAGES 19 , INCLUDING COVER SHEET.
The pages comprising this facsimile transmission cC.!::ait:
confidential information from Eckberg, Lammers, Briggs, bd:•:: : :
Vierling. This information is intended solely t . ...:,
individual or entity named as the recipient hereo: . : : : . .. ...the intended recipient, be aware that any disc.L s::ie,
distribution, or use of the contents of this transmiss .._
prohibited. If you have received this transmission in err:;..,
please notify us by telephone immediately so we may
retrieve this transmission at no cost to you . Violation
confidentiality notice could constitute a basis for a clai:t:
damages against the violation. If you received this communication
in error, please immediately notify us by telephone at (612) 439-
2878.
IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL US
BACK AS SOON AS POSSIBLE AT (612) 439-2878
COMMENTS:
Re: Jack Krongard (dictated but not read)
* * * * * * * * * * *
HARD COPY WILL FOLLOW BY MAIL
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 D02
• •
LAW OFFICES OF
Eokberg. Lammers , Brigs, Wolff & Vierling, P.L.L.P.
1835 Northwestern Avenue
Siillwater. Minnesota 55082L le J. Eckberg
Dovid K. Snyder
Janes F. Lammers (612) 439-2879 Uree6 Pi)etie6
Robert G. Briggs*' PAX(612) 439-2923 PaO1 A. Wolff
Marc J. Vierline (19bt99�
Gregory G. Geller* Direct Dial No. , (612) 351-2116 3-
*Qealifiad Nediral Ar6;,r�iar(/4.199Medieter
Tkom `-r
ea J. W ei4gers
SaSen D. Olson March 4, 1998 �•-I;e.a 1 .e.e)A.6trraor
iCieri�ied Reel Glass$yeo;elisi
Mr. Thomas Melena
City Administrator
City of Oak Park Heights
14168 - 57th Street North
P.O. Box 2007
Oak Park Heights, Minnesota 55082
Re: Krongard Construction Company - Valley View Addition
and Valley View Estates II
Dear Tom:
As per my conversation with you, I am providing you with
a checklist of issues that need to be resolved dealing with Mr.
Krongard. To my knowledge, those issues are as follows :
1. Public Works. The Public Works Department has
received a number of complaints from property owners in the
development as it affects the billing for water services.
Certainly check with Roger on the issue, but it is my understanding
that members of the homeowners association feel that they are being
billed for water services, particularly as it affects outdoor,
automatic sprinkling systems that are on other properties. This is
largely an issue between the developer and the individual property
owners, but, of course, it is the City staff chat is receiving the
complaints.
2. Engineering Issues . There is a drainage structure
located upon the property that needed to be raised or altered as a
result of the developer regrading in the area to address storm
water drainage problems. The developer' s position is that the
drainage structure was originally in place before he got there and
he does not feel he should have to be responsible for the
reconstruction or raising of that structure . Engineering' s
position is that the nature of the regrading that took place out
03/04/98 09:01 ECKBERG LAW -4 4390574 NO.316 D03
•
Mr. Thomas Melena
March 4, 1998
Page 2
there by the developer is what necessitated the adjustment which is
required to be made to the drainage structure and they feel it is
his responsibility to make the adjustment. The drainage structure,
I understand, will cost approximately $2, 500.00 to make the
appropriate adjustment . Copy of the original Development Agreement
(unsigned) is provided. You will note that on Page 5, Subparagraph
K. , developer is required to dedicate and survey all drainage,
storm water, and holding ponds as required by the City and is also
responsible for storm sewer cleaning and holding pond dredging,
etc. You will also note that on Page 1 under Plan A Improvements,
Subparagaph A. , the developer is responsible for site grading
subject to the approval of the City Engineer. My understanding is
that the position of the engineers is that the particular problems
in place on the property are primarily the result of the grading
done by the developer and, hence, the dispute that exists.
3 . Easements. There are two sets of easements required
of Mr. Krongard. One was an access easement to get into Valley
View Park that has already been secured. The other remaining set
of easements that we were to obtain from him dealt with
bikeway/pathway easements 20 feet in length going along Osgood
Avenue. Mr. Krongard was to provide the legal descriptions and the
easements as he is still under ownership of the lots that are
immediately impacted on the property.
I am enclosing a copy of a letter that I sent to Mr.
Krongard dated January 12 following up on a conversation that I had
with him again in September of 1997 following up on these very
easements.
Mr. Krongard has consistently told me that he was
having Mr. Randy Kurth, the surveyor, prepare these easements and
that they would be provided to me. Of course, it has been several
months and we have yet to see same.
Judy advises me that she has received a bill from
Mr. Kurth for the surveying services, which I do not object to the
City picking up as I assume it is relatively small and the
easements are for our benefit; however, we have not seen the legal
descriptions nor have we been provided with the easements by Mt .
Krongard. Given the length of time that has transpired, we would,
of course, have to re-check the status of title to make sure that
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 PO4
• 411
Mr. Thomas Melena
March 4 , 1998
Page 3
Mr. Krongard is still in position to be able to convey these
easements. My sense is that these easements have been caught up in
the dispute between Mr. Krongard and engineering as it affects the
drainage structure and are being held hostage at this point in
time.
4. Finance. Judy has advised me previously that she
either has some bills owing from Mr. Krongard on this or ocher
projects and/or may have funds which need to be returned tor.:!:'.
This, of course, needs to be wrapped up at the same time as the
other issues are concluded.
Within the City' s file you should be able to find signed
copies of the two Development Agreements, one for Valley View
Addition, the second for Valley View Estates, and also the planning
reports that deal with this matter. Engineering reports should
also be in the file, although you may wish to check with Joe
Anderlik directly with regard to the disputed drainage structure.
If I can be of further assistance in this matter, please feel free
to contact me directly.
Yours very truly,
Mark J. Vierling
MJV/sdb
Enclosure
cc: Scott Richards (via fax)
Joe Anderlik (via fax)
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 D05
•
LAW OFFICES OF
Eckber8. Lamers, Briggs. Wolff & Vierling. P.L.L.P.
1835 Northwestern Avenue
Lyle J. Eolr6erg Stillwater. Minnesota 55082
David K. Snyder
James F. Lammers (612) 439-2878 Uroylt Piletick,
Ro6erl G. Briggs.. FAX (612) 439-2923 Parl A. Wolff
Mark J. Vierlingo
Gregory G. Geller• Direct Dial No. : (612) 3S1-2118 (1944-1098)
Ybemas J. Weiaaer+r. +�Qea)i(roa Nertral Arbitrate,&Mediate.
Janus 12 , 1998 •Qvalified Neetra)A.liirsior
' Suaam D. Olson January .Ger.Ced Re•I Ertale Speeieliel
Mr. Jack Krongard
Krongard Construction Company
14791 - 60th Street North
Stillwater, Minnesota 55082
Re : Valley View Addition/Valley View Estates II
Dear Jack:
I talked to you last September with regard tc
bike/walkway easement along Osgood Avenue affecting these cwo
subdivisions. At that time, you advised me that you would have Mr.
Kurth prepare the necessary descriptions so that the 20 foot wide
easement could be conveyed to the City. The same would obviously
not have any impact on the developability of the affected
properties .
I have not heard anything from Randy or you since that
time. We need to get these matters cleared up and I would •
appreciate if you could get those descriptions in here as soon as
possible. If you have any questions or if there are concerns with
regard to this matter, please contact me directly.
Yours very truly, •
Mark J. Vierling
MJV/sdb
Enclosure
cc: Judy Hoist
03/04/96 09:01 ECKBERG LAW a 4390574 NO.316 P06
S 4
CITY OF OAK PARK HEIGHTS
WASHINGTON COUNTY, MINNESOTA
DEVELOPER' S AGREEMENT
THIS AGREEMENT, made and entered into this day of
, 1995, by and between the City of Oak Park
Heights, a municipal corporation under the laws of the State of
Minnesota (the "City" ) , and St . Croix Land Company, Inc. (the
"Developer") .
WITNESSETH; That:
WHEREAS, the Developer has made application to the City
Council for approval of a plat of land within the corporate limits
of the City described as follows :
• See Attached Exhibit A.
(the "Subdivision") ; and,
WHEREAS, the City Council has on , 1995, granted
preliminary approval to the Subdivision, on the condition that the
Developer enter into this Agreement stipulating the conditions for
the installation of street, water, sewer and other public
improvements as well as the development of on-site improvements
hereinafter described, all in accordance with the terms and
conditions hereinafter set forth.
NOW, THEREFORE, in consideration of the premises and of the
mutual promises and conditions hereinafter contained, it is hereby
agreed as follows :
Designation of Improvements : Improvements to be installed at
Developer' s expense by the Developer as hereinafter provided are
hereinafter referred to as "Plan A Improvements" . Improvements to
be installed by the City and paid for by Developer are hereinafter
referred to as "Plan B Improvements" .
1 . PLAN A IMPROVEMENTS: The Developer will construct at
Developer' s expense the following improvements under Plan
A according to the following terms and conditions:
A. The Developer shall do all site grading, common
greenway and open spaces, storm water storage
ponds, surface drainage ways and all private
driveways including sodding of boulevards, all in
accordance with the approved grading, drainage and
site plan. A grading plan with maximum two (2)
foot contours, house pad elevations, drainage
provisions, erosion control provisions and cross
sections, as necessary, shall be submitted to and
approved by the City prior to commencement of any
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 P07
•
site grading. Any changes to the grading plan
during construction shall be submitted to the City
for approval . Individual building sites including
private driveways are to be customed graded to
preserve the maximum number of trees on each site.
Unless waived by the Building Inspector, each
building site must have an individual grading plan
separately approved by the Building Inspector of
the City of Oak Park Heights prior to a building
permit being issued.
B. The Developer shall control soil erosion ensuring:
1. All development shall conform to the natural
limitations presented by the topography and
soil of the subdivision in order to create the
beet potential for preventing soil erosion.
The Developer shall submit an erosion control
plan, detailing all erosion control measures
to be implemented during construction, said
plan shall be approved by the City prior to
the commencement of site grading or
construction.
2 . Erosion and siltation control measures shall
be coordinated with the different stages of
development . Appropriate control measures as
required by the City Engineer shall be
installed prior to development and as may be
necessary to control erosion.
3 . Land shall be developed in increments of
workable size such that adequate erosion and
siltation controls can be provided as
construction progresses. The smallest
practical area of land shall be exposed at any
one period of time.
4 . Where the topsoil is removed, sufficient
arable soil shall be set aside for respreading
over the developed area. The topsoil shall be
restored to a depth of at least four (4)
inches and shall be of a quality at least
equal to the soil quality prior to
development .
5. On all residential properties, the Developer
or his designee shall provide finished grading
with a topcoat of black dirt and sod in the
front and side yards. The back or rear yards
of all residential properties shall be sodded
or seeded at the developer' s option. No
certificate of occupancy or final inspection
approval shall be granted by the Building
03/04/98 09:01 ECKSERG LAW 4 4390574 NO.316 D0B
• I
Inspections Department of the City of Oak Park
Heights until compliance of this provision has
been met with this requirement.
C. The Developer shall place iron monuments at all lot
and block corners and at all other angle points on
boundary lines. Iron monuments shall be placed
after all street and lawn grading has been
completed in order to preserve the lot markers for
future property owners .
D. The Developer shall be responsible for maintaining
the location of and protecting curb stops, water
services and sewer services . Any service or curb
stop damaged shall be repaired or replaced as
specified by the City. The Developer shall make
all necessary adjustments to the curb stops to
bring them flush with the topsoil (after grading)
or driveway surface.
E. The Developer shall be required to provide
landscaping and screening as determined by the City
and as required by the ordinances of the City. In
all instances one boulevard tree should be planted
by Developer per dwelling unit . In no instance
shall the Developer plant more than 50 percent of
the same type of tree. A detailed landscape plan
shall be submitted to and require the approval by
the City prior to commencement of final platting
and landscaping construction.
F. The Developer shall install all street name signs
at all intersections and provide other traffic
control signs within the subdivision as determined
to be necessary by the City. Temporary street name
signs shall be installed by the Developer prior to
issuance of the first building permit . The
temporary sign shall be constructed of durable
materials to be approved by the Building Official.
G. The Developer shall remove all diseased trees
before building permits will be issued as to any
individual lot. As it affects the removal of dead
trees and vegetation on any individual lot, the
same shall be addressed within the individual
grading plan to be submitted to the Building
Inspector of the City of Oak Park Heights at each
time that a building permit is sought with regard
to the construction of a single family residence as
to any individual lot. The Building Inspector
shall determine in conjunction with the City
Forester, the need to remove dead vegetation upon
3
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 5109
any individual lot as part of the custom grading to
be implemented on each lot relating to the
construction of any residential dwelling thereon.
H. The Developer shall be responsible for street
maintenance, including curbs, boulevards, sod and
street sweeping until the project is complete . All
streets shall be maintained free of debris and soil
until the subdivision is completed. Warning signs
shall be placed when hazards develop in streets to
prevent the public from traveling on same and
directing attention to detours. If and when the
street becomes impassible, such streets shall be
barricaded and closed. In the event residences are
occupied prior to completing streets, the Developer
shall maintain a smooth driving surface and
adequate drainage on all temporary streets. The
Developer shall be responsible for the removal of
snow from all gravel streets. The repair of any
damage done to the streets or public utilities
shall be the financial responsibility of the
Developer.
I. The Developer shall furnish street lights in
accordance with the City' s residential street
lighting policy.
General Requirements:
1 . Residential street lighting shall be owned,
installed, operated and maintained by the
electric utility company (NSP) . City and
utility company shall enter into a contractual
agreement on the rate and maintenance of the
street lighting system.
2 . It shall be the responsibility of the
Developer to:
a. Reimburse the City for the first two (2)
years of operating cost of the street
lighting system.
b. Pay the electric utility company any cost
incurred in the installation of the
street lighting units not covered in the
electric utility company rate for this
service. This payment shall be required
to be guaranteed as part of the Plan A
security.
c. The two year payment schedule (policy)
4
03/04/98 09:01 ECKBERG LAW -> 4390574 N0.316 P10
411
shall be put into effect upon
installation of each lighting unit .
d. All these costs shall be guaranteed by
part of the Plan A security.
J. The Developer shall, in all new subdivisions,
dedicate a reasonable portion of each proposed
subdivision as the City Council reasonably
determines to the public for public uses as parks,
playgrounds, public open space, trails, or other
conditions as required by the City. Developer
shall dedicate pedestrian/bike trail easement areas
to the City of Oak Park Heights as specified on the
plat and approved by the Oak Park Heights Park
Commission this dedication is credited against the
total park dedication requirement.
The Developer for the balance of the plat for of
Valley View Estates II shall pay to the City of Oak
Park Heights the sum of $12, 580. 00 on execution of
this Agreement.
K. The Developer shall dedicate and survey all
drainage storm water and hold ponds as required by
the City. The Developer shall be responsible for
storm sewer cleaning and holding pond dredging, as •
required, by the City prior to completion of the
development.
L. The Developer shall be required to depict possible
future bus routes and surrounding land uses
including parks and all scheduled improvements on
all display materials and brochures given to
prospective buyers.
M, The Developer shall be responsible for securing all
necessary approvals and permits from all
appropriate federal, state, regional and local
jurisdictions prior to the commencement of site
' grading or construction and prior to the City
awarding construction contracts for public
utilities.
N. Drainage and utility easements . 10 foot drainage
and utility easements shall be provided along all
lot lines .
0. Wetland Designation. All areas classified as
wetlands shall be displayed upon the plat and those
so specified by the City Engineer be dedicated to
' the public for that purpose.
5
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 P11
411
2 . DESCRIPTION OF IMPROVEMENT ESTIMATED COST
1 . Boulevard and swale sod $ 5, 700 . 00
2 . ; Boulevard trees 5, 600 . 00
3 . Street signs 850 , 00
4 . Street lights 2, 880 . 00
5 . . Erosion Control 3, 600.00
6 . Pond Protection & Restoration 1, 000 . 00
7. . Utility protection and repair 6, 680 . 00
6 . Street protection and repair 8, 790 . 00
TOTAL ESTIMATED CONSTRUCTION COST
OF PLAN A IMPROVEMENTS: $ 35, 100. 00
• ESTIMATED ENGINEERING, LEGAL AND
ADMINISTRATIVE (20%) : $ 7, 000.00
TOTAL ESTIMATED CONSTRUCTION COST
OF PLAN A IMPROVEMENTS: $ 42, 100 . 00
SECURITY REQUIREMENT (25%) $ 10, 500 . 00
TOTAL PLAN A ESCROW $ 52, 600 .00
3 , CONSTRUCTION OF PLANA IMPROVEMENTS.
A. Construction. The construction, installation,
materials and equipment shall be in accordance with
the plans and specifications approved by the City.
B. Inspection. All of the work shall be under and
subject to the inspection and approval of the City
and, where appropriate, any other governmental
agency having jurisdiction.
C. Easements. The Developer shall dedicate to the
City, prior to approval of the final plat, at no
cost to the City, all permanent or temporary
easements necessary for the construction and
installation of the Plan A and Plan B Improvements
as determined by the City. All such easements
required by the City shall be in writing, and in
recordable form, containing such terms and
conditions as the City shall determine.
6
03/04/98 09:01 ECKBERG LAW 4 4390574 N0.316 D12
110
D. faithful Performance of Construction Contracts.
The Developer will fully and faithfully comply with
all terms and conditions of any and all contracts
entered into by the Developer for the installation
and construction of all Plan A Improvements and
hereby guarantees the workmanship and materials for
a period of one year following the City' s final
acceptance of the Plan A Improvements.
Concurrently with the execution hereof by the
Developer, the Developer will furnish to, and at
all times hereinafter maintain with the City, a
cash deposit, certified check, or an Irrevocable
Letter of Credit, based on one hundred and twenty-
five percent (125%) of the total estimated cost of
Plan A Improvements as indicated in Section 2 . An
Irrevocable Letter of Credit shall be for the
exclusive use and benefit of the City of Oak Park
Heights and shall state thereon that the same is
issued to guarantee and assure performance by the
Developer of all the terms and conditions of chis
Development Agreement and construction of all
required improvements in accordance with the
ordinances and specifications of the City. The
City reserves the right to draw, in whole or in
part, on any portion of the Irrevocable Letter of
Credit for the purpose of guaranteeing the terms
and conditions of this Agreement . The Irrevocable
Letter of Credit shall be renewed or replaced by
not later than thirty (30) days prior to its
expiration.
E. Reduction of Escrow Guarantee . The Developer may
request reduction of the Letter of Credit or cash
deposit based on prepayment or the value of the
completed improvements at the time of the requested
reduction. The amount of reduction will be
determined by the City and such recommendation will
be submitted to the City Council for action.
Following any payment for a Plan A improvement
which is within the Engineer' s estimate, the City
may consider and allow a reduction of the Letter of
Credit up to the rate of $1. 25 for every dollar
that has been paid out of the escrow/Letter of
Credit provided that the project is on schedule,
the Developer is not in default under the terms of
the Development Agreement and/or no extraordinary
expenses beyond the engineering estimate have been
incurred during the course of the project.
4 . PLAN B IMPROVEMENTS. The following improvements will be
installed by the City at the Developer' s expense
according to the following terms and conditions :
7
03/04/98 09 01 ECKBERG LAW 4 4390574 N0.316 D1i
0 •
1. DESCRIPTION OF IMPROVEMENT
ESTIMATED COST
A. Sanitary sewer
$ 23 , 950 . 00
B. Water main
21, 010 .00
C. House Services
26,730 . 00
61, 850 . 00
D. Storm sewer
E. Base preparation
59, 290 .00
F. Curb and gutter 18, 860 . 00
G. Surfacing streets
47, 500 .00
TOTAL ESTIMATED CONSTRUCTION COST $259, 190 . 00
OF PLAN B IMPROVEMENTS :
ESTIMATED ENGINEERING, LEGAL AND $ 50, 810.00
ADMINISTRATIVE (20%) :
TOTAL ESTIMATED CONSTRUCTION COST $310, 000 . 00
OF PLAN B IMPROVEMENTS :
SECURITY REQUIREMENT (25%)
$ 77,500 .00
TOTAL PLAN 8 ESCROW
$387,500 .00
2 . That prior to the City
ordering the installation
and awarding the contracts as it relates to the
PlanB improvementsdwith the City of Oak Park
the costs therefor, 1
Developer shalldeposit
Heigh , st e PlaneT hB
improvementststhe plus a 25% secucority of requth '
related thereto fortotal a total estimated of $387, 500.00• ens e
City shall pay from said deposit all exp
related to the construction
htheconstruction of same
improvements providing
as follows:
Construction. After the preparation of
preliminary plans lans and estimates by the City,
the City Council shall take bids on the
projects and thereafter award the contract
pursuant to law for the installation of the
Plan B improvements under the City' s
supervision.
B. Escrow. No work shall be commenced under this
8
• i
03/04/98 09:01 ECKBERG LAW -> 4390574 NO.316 P14
410 III
Agreement until the Developer shall have filed
with the City a cash deposit, certified check
or Letter of Credit (in a form to be approved
by the City Attorney) in the amount equal to
the total estimated cost of the Plan B
improvements plus a security requirement of
25% in the total amount of $387, 500. 00. The
City shall have the right to apply against the
Letter of Credit all bills incurred by the
City with regard to the Plan B improvements,
however, the City shall provide the Developer
the opportunity to pay for said improvements
as bills are incurred, in cash, rather than
applying payments as against the Letter of
Credit provided to the City, if a Letter of
Credit is used in lieu of a cash escrow by the
Developer. In such case, the Developer shall
have 10 business days from the time of
submission of the bill by the City to the
Developer to pay to the City such amount in
cash so that the City can use the payment to
pay the amount due in lieu of drawing down on
the Letter of Credit or other escrow on file
with the City of Oak Park Heights.
C. The Developer shall be provided with a copy of
the plans and specifications as prepared by
the office of the City Engineer for the Plan B
improvements and shall be allowed the
opportunity to comment on same prior to final
release of the bid specifications by the
office of the City Engineer for purposes of
receiving bid on the improvements. The
Developer shall also be notified of the bid
opening date and provided the opportunity to
comment on the bids received prior to the
award of the bid on the Plan B improvements.
The Developer may recommend rejection of al
bids and the rebidding of the project or any
portion thereof; however, such recommendation
is not binding on the City of Oak Park Heights
and the City may award the contract based upon
the bids received if it, in its absolute
discretion, determines that the bids so
received are reasonable.
The Developer shall also be provided the
opportunity to request that the City Engineer
consider including certain contractors that
the Developer might suggest to be added to the
proposed bidder' s list . Final determination
of the proposed bidder' s list shall rest in
9
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 P15
•
the discretion of the City Engineer.
D. All such improvements as constructed shall
become the property of the City of Oak Park
Heights. The Developer shall dedicate to the
City prior to approval of the final plat at no
cost to the City all permanent and temporary
easements necessary for the construction of
such improvements as determined by the City.
E. Contracts. All such construction contracts as
awarded by the City of Oak Park Heights to
construct the Plan B improvements shall
provide for a guarantee of the workmanship and
materials for a period of one year following
the completion of construction of the Plan B
improvements. All such contracts shall also
conform to the ordinances and specifications
of the City in the construction of all Plan B
improvements .
F. Reduction of Cash Deposit/Le ter of Credit.
The City shall be allowed to draw upon the
cash deposit/Letter of Credit/escrow for the
payment of any and all construction contracts
awarded as it relates to the Plan B
improvements, or any portion or increment
thereof, upon certification by the City
Engineer of completion of construction of the
Plan B improvements, or any portion or
increment thereof . Upon final completion of
the Plan B improvements and certification of
same by the City Engineer, any remaining funds
on hand, provided as security to secure the
construction of the Plan B improvements, shall
be refunded to the Developer.
G. Change Orders . No change order increasing the
contract expense shall be authorized by the
City without first notifying Developer of the
change .
H. gatimates. The above estimates are
engineering projections only. Developer shall
be responsible for all actual expenses
incurred in the securing and installing of all
Plan B improvements.
I . Connection Charges . All connection charges
and fees shall be paid by Developer on a per
lot basis at the time that building permits
are obtained for each dwelling or principal
10
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 P16
structure to be constructed. The City
Engineer shall compute the connection fee as
prescribed by ordinance/resolution as to this
development and advise the City Administrator
as to the appropriate fee to be collected. As
it affects this "Development" , the engineer
has calculated the total sanitary, water works
and storm sewer connection charges to be in
the amount of $1,485 .44 per townhome unit.
$2, 785. 73 per single family unit and $2, 151.35
per twin home unit .
5 . CASH ESCROW ACCOUNT. The Developer shall provide a
cash escrow account to the City of Oak Park Heights
in the amount of $ to reimburse the
City of Oak Park Heights for previous expenses
relating to this development. Developer shall also
be responsible for future engineering, legal and
administrative costs incurred by the City in the
process of supervising the implementation of this
development agreement relating to the public
improvements and other provisions effecting the
subject property. The Developer will be billed
periodically by the City for such expenses and pay
• same within 10 days of presentation. Any disputes
over billings presented to the Developer shall be
resolved by the City Council who shall act as the
final authority to determine the reasonableness of
such charges .
6. GENERAL:
A. Binding Effect . The terms and provisions
hereof shall be binding upon and inure to the
benefit of the heirs, representatives,
successors and assigns of the parties hereto
and shall be binding upon all future owners of
all or any part of the Subdivision and shall
be deemed covenants running with the land.
References herein to Developer, if there be
more than one, shall mean each and all of
them. The Agreement, at the option of the
City, shall be placed on record so as to give
notice hereof to subsequent purchasers and
encumbrances of all or any part of the
Subdivision and all recording fees, if any,
shall be paid by the Developer.
B. Final Plat Approval. The City agrees to give
final approval to the plat of the Subdivision
upon execution and delivery of this Agreement
and of all required documents and security,
11
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 P17
S •
subject to compliance with the Ordinances of
the City and terms and provisions hereof,
permits may be issued by the City.
C. Incorporation of Reference. All plans,
special provisions, proposals, specifications
and contracts for the improvements furnished
and let pursuant to this Agreement shall be
and hereby are made a part of this Agreement
by reference as fully as if set out herein in
full. City Planner File No. 798 .02 - 94 . 05 and
Engineering File No. 55120 are hereby
incorporated herein by reference.
D. The City of Oak Park Heights shall file the
Developer' s Agreement or a permit issued
pursuant thereto in the office of the County
Recorder. Providing that the Developer is not
in default under the terms of the Development
Agreement, the City shall provide appropriate
releases to the financial aspects of same and
documentation to individual buyers of lots.
E. As to any and all administrative, legal or
engineering costs which the Developer is
expected to pay to the City of Oak Park
Heights, which costs are to be offset against
the cash escrows or Letters of Credit which
the Developer has filed and provided to the
City of Oak Park Heights, the Developer shall
be given the opportunity to review and comment
on such costs prior to the application by the
City of Oak Park Heights to the escrow for the
payment of same. Notwithstanding the above,
the City of Oak Park Heights shall be the
final authority in determining the fairness
and reasonableness of all such costs incurred;
and the decision by the City Council for the
City of Oak Park Heights on any such dispute
shall be binding.
F. Establishment of Construction Schedules. The
City Engineer shall establish construction
schedules for Plan A and Plan B improvements
and shall consult with Developer prior to
establishing same.
G. Zoning. All future use and development shall
comply with the applicable provisions of the
relevant zoning ordinance of the City of Oak
Park Heights relating thereto.
12
03/04/98 09:01 ECKBERG LAW 4 4390574 NO.316 P18
H. Signage . Should Developer or his heirs and/or
assigns desire any signage affecting this
development it must be submitted by detail
sign plan to the City of Oak Park Heights and
approved prior to being implemented on the
site.
I . Street Grades. The grades of all streets
shall not exceed 8a and the minimum grade
shall not be less than .5% .
IN WITNESS WHEREOF, the City and Developer have caused this
Agreement to be duly executed on the date and year first above
written.
In the presence of: CITY OF OAK PARK HEIGHTS
By
Barbara H. O'Neal
Mayor
Michael J. Robertson
Administrator
In the presence of: ST. CROIX LAND COMPANY, INC.
By
Its
By
Its
STATE OF MINNESOTA )
ss.
COUNTY OF WASHINGTON)
On this day of , 1995, before me a Notary
Public, within and for said County personally appeared Barbara H.
O'Neal and'Michael J. Robertson, to me personally known, being each
by me duly sworn did say that they are respectively the Mayor and
the Administrator of the City of Oak Park Heights, the municipal
corporation named in the foregoing instrument; and that the seal
13
03/04/98 09:01 ECKBERG LAIC -> 4390574 NO.316 P19
S I
affixed to said instrument is the corporate seal of said
corporation, and that said instrument was signed and sealed on
behalf of said municipal corporation by authority of ' its City
Council and said Mayor and Administrator acknowledged said
instrument to be the free act and deed of said municipal
corporation.
Notary Public
STATE OF MINNESOTA )
. Bs.
COUNTY OF WASHINGTON)
On this day of , 1995, before me a Notary
Public, within and for said County personally appeared
and , to me personally known,
being each by me duly sworn did say that they are respectively the
and of
the corporation named in the foregoing instrument; and that the
seal affixed to said instrument is the corporate seal of said
corporation, and that said instrument was signed and sealed on
behalf of said municipal corporation by authority of its Board of
Directors and said and
acknowledged said instrument to be the free act and deed of said
municipal corporation.
Notary Public
THIS INSTRUMENT WAS DRAFTED BY:
Mark J. Vierling
Eckberg, Lammers, Briggs, Wolff
& Vierling, P.L.L.P.
1835 Northwestern Avenue
Stillwater, MN 55082
(612) 439-2878
oph\devagree\valleyII\March 3, 1998
14
CITY OF
# ' � OAK PARK HEIGHTS
• 14168 N. 57th Street•Box 2007.Oak Park Heights,MN 55082 •Phone: (612) 439-4439•FAX 439-0574
February 26, 1998
Krongard Construction
14791 North 60th Street
Oak Park Heights,Minnesota 55082
Dear Mr. Krongard:
My name is Tom Melena and I have been hired as the new City Administrator for the City of Oak
Park Heights. As part of my orientation,I have been updated on the status of your Valley View
" Estates Development. It is my understanding that there are some issues that still need to be
resolved between Krongard-Construction and:the City.
► One issue involves preparing the easement descriptions for the property along Osgood •
Avenue Our City Attorney.Mark Vierling spoke with you on September 11, 1997 and was
=: assured that this was being done. This has not been taken care of yet.
► The second issue that will need to be addressed is the drainage concerns at yalley'View `'•
• Estates. You were invited to a_City Council Workshop in January 1998 to discuss this,
however,you were not ableto attend and this issue also remains unresolved.
Until these items are able to be resolved to the satisfaction to the City,no new building permits or
Certificates of Occupancy can be issued to your company. I am confident that we will be able to
resolve these issues in a timely manner and be able to proceed with your development in the City.
If you have any questions,please do not hesitate to contact me.
Very truly yours,
•
Thomas M. Melena _
City:Administrator' .
Tree City U.S.A.
f 4 •
CITY OF •
`a{ OAK PARK HEIGHTS
14168 N. 57th Street•Box 2007 •Oak Park Heights,MN 55082 •Phone: (612) 439-4439 •FAX 439-0574
December 2, 1997
Jack Krongard
Krongard Construction
14791 60th Street North, Suite 2
Oak Park Heights, MN 55082
Dear Mr. Krongard:
The City Engineer has reviewed Valley View Estates regarding the
complaints received by the homeowners association. Enclosed is
the letter with the conclusions by our engineer. The City
Council would like to schedule a workshop with you in January to
discuss these issues . Please contact me and let me know whether
January l3 or January 27 would be better for you to meet with the
Council. If you have any questions, please do not hesitate to
call me._.
Very truly yours,
udy Holst .
Interim. City Administrator
Enclosure
cc: Doug Bergmann
•
Tree City U.S.A.
? 14
•
Bonestroo • Sonestroo,Rosene,Anderlik and Associates,Inc.is an A -ve Action/Equal Coportunity Employer
Principals:Otto G.Bonestroo,PE.•Joseph C.Anderlik, arvin L.Sorvala.?E •
Richard E.Turner,P.E.• Glenn R.Cook.PE.• Robert G.Schunicht.PE.• Jerry A.El ourdon,P.E.•
RoseneRobert W.Rosene,P.E.and Susan M.Eberlin.C.P.A.,Senior Consultants
` . Associate Principals'Howard A.Sanford.PE.• Keith A.Gordon.PE.•Robert R.?`efferle.P.E.•
vn Anderlik & Richard W.Foster.PE.• 03vid O.Loskota,PE.•Robert C.Rusiek A.I.A.• Mark A.Hanson,P.E.•
Michael T.Rautmann,PE.• Ted K.Field.P.E.• Kenneth P.Anderson.PS.•Mark R.Roi`s.PE.•
AssociatesSidney P Williamson.P.E..L.S.• Robert F Kotsmith
Offices:St.Paul,Rochester,Willmar and St.Cloud,MN•Milwaukee,WI
Engineers & Architects
November 7, 1997
Ms.Judy Hoist D Q (! 1.
City of Oak Park Heights (. .: l a
14168 5h Street North J 1 0 1997 1 i `l,,'
Oak Park Heights,MN 55082 I t..J
Re: Valley View Estates OAK PARKCTNElCHTS
Our File No.55120
Dear Ms.Hoist:
We have inspected the Valley View Estates area as it relates to a petition the City received relative to
some repair or corrective work requested by the Homeowners Association. A copy of that petition is
enclosed for reference.
• It is recommended that an inlet grate be installed on the manhole shown in Picture 1 and a small berm be
graded around the manhole to channel the water to be intercepted. The structures shown on Pictures 2
and 3 do not need to be modified.
The beehives shown in Pictures 7A and 7B should be raised approximately one foot and fill placed •
. around them.
Mr.Krongard has agreed to replace the rock and gravel spillways with either larger rocks or concrete.
It is recommended that holes be drilled in the two high-capacity catch basins and steel bars installed to
• reduce the opening size and finally it is suggested that approximately 10 cubic yards of rock rip rap be
installed at the east end of the emergency overflow into the park for erosion control.
It should be noted the concrete in Pictures 16 through 18 has been removed.
The inspection was performed with a contractor in the area and they felt that the approximate cost of the
improvements would be between $2,000.00 and $2,500.00. However, with the lateness of the season it
would probably be best to wait until spring so that the areas can be cleaned up,restored and resodded. It •
will also be necessary to determine a source of funding if the City is to proceed with the work.
We are also returning the pictures which we borrowed for your records and file. If you should have any
questions on this matter,please do not hesitate to call me or Brian Scott.'
Very truly yours,
BONESTROO,ROSENE,ANDERLIK&ASSOCIATES,INC.
0 OfrizObtia
- oseph C.Anderlik
•
2335 West Highway 36 • St. Paul, MN 55113 • 612-636-4600 ■ Fax: 612-636-1311
*closure
COUNCIL MEETING DATE: November 25, 1997
AGENDA ITEM
CITY OF OAK PARK HEIGHTS
REQUEST FOR COUNCIL ACTION
Request Submitted: November 21, 1997
Requested By: Judy Holst, Interim Administrator
ITEM/ACTION DESCRIPTION: Valley View Estates repair or corrective
work requested by the Homeowners Association.
BACKGROUND: The City received a petition from the Board of
Directors of Valley View Garden Homes Assoc. For repair or
corrective works at Valley View Estates . The area has been
inspected by City Engineer with several recommendations . See
attached.
ACTION REQUESTED: Recommend the work be performed in the spring
per engineer' s recommendation. Schedule workshop with Jack
Krongard to determine source of funding. Send copy of Engineer' s
letter and Council invitation to Jack Krongard to attend
workshop.
FINANCIAL IMPLICATIONS: Depending on outcome of workshop, this
could cost the City $2 , 000 to $2 , 500 .
ADMINISTRATIVE COMMENTS: The costs could be expended from the
Capital Revolving Fund.
REVIEWED BY:
�uWQiI
riaar
a q4 Director
ty ministrator
Police Chief Building Inspector
•
Bonestroo,Rosene,Anderlik and Associates,Inc.is antive Action/Equal Opportunity Employer
Bonestroo Principals:Otto G.Bonestroo,P.E.• Joseph C.Anderlik, . .• Marvin L.Sorvala,P.E.•
Richard E.Turner,RE.•Glenn R.Cook,RE.• Robert G.Schunicht,P.E.• Jerry A.Bourdon,RE.
•
RoseneRobert W.Rosene,P.E.and Susan M.Eberlin,C.P.A.,Senior Consultants
Associate Principals:Howard A.Sanford,P.E.• Keith A.Gordon,P.E.• Robert R.Pfefferle,P.E.•
Anderlik , Richard W.Foster,P.E.• David O.Loskota,P.E.• Robert C.Russek,A.I.A.• Mark A.Hanson,P.E.•
Michael T.Rautmann,P.E.•Ted K.Field,P.E.• Kenneth P.Anderson,RE.• Mark R.Rolfs,P.E.•
Associates Sidney R Williamson,P.E.,L.S.• Robert F.Kotsmith
Offices:St.Paul,Rochester,Willmar and St.Cloud,MN•Milwaukee,WI
Engineers &Architects
November 7, 1997 �
Ms.Judy Hoist � LI Lb U} UM
L
City of Oak Park Heights
14168 5th Street North NOV I 0 1997 .�
Oak Park Heights,MN 55082
Re: Valley View EstatesCITY OF
•
OAK PARK HEIGHTS
Our File No. 55120
Dear Ms.Hoist:
We have inspected the Valley View Estates area as it relates to a petition the City received relative to
some repair or corrective work requested by the Homeowners Association. A copy of that petition is
enclosed for reference.
It is recommended that an inlet grate be installed on the manhole shown in Picture 1 and a small berm be
graded around the manhole to channel the water to be intercepted. The structures shown on Pictures 2
and 3 do not need to be modified.
The beehives shown in Pictures 7A and 7B should be raised approximately one foot and fill placed
around them.
Mr.Krongard has agreed to replace the rock and gravel spillways with either larger rocks or concrete.
It is recommended that holes be drilled in the two high-capacity catch basins and steel bars installed to
reduce the opening size and fmally it is suggested that approximately 10 cubic yards of rock rip rap be
installed at the east end of the emergency overflow into the park for erosion control.
It should be noted the concrete in Pictures 16 through 18 has been removed.
The inspection was performed with a contractor in the area and they felt that the approximate cost of the
improvements would be between $2,000.00 and $2,500.00. However, with the lateness of the season it
would probably be best to wait until spring so that the areas can be cleaned up,restored and resodded. It
•
will also be necessary to determine a source of funding if the City is to proceed with the work.
We are also returning the pictures which we borrowed for your records.and file. If you should have any
questions on this matter,please do not hesitate to call me or Brian Scott.
Very truly yours,
BONESTROO,ROSENE,ANDERLIK&ASSOCIATES,INC.
n
•
oseph C.Anderlik
2335 West Highway 36 • St. Paul, MN 55113 • 612-636-4600 • Fax: 612-6361311
!II
PETITION
TO
CITY OF OAK PARK HEIGHTS
A MINNESOTA INCORPORATED MUNICIPALITY
LOCATED IN WASHINGTON COUNTY, MINNESOTA
We, the Board of Directors of Valley View Garden Homes
Association, do hereby respectfully petition the City of Oak Park
Heights to repair, correct or require any other responsible party
to repair or correct the following:
1 . The seasonal surface water drains on the South side of
the Subdivision of Valley View Garden Homes should be
raised, opened and open covers put on them. Refer to
Pictures No. 1 through 3 .
2 . Because of the inadequacy of the drains behind the
homes, after heavy rains the water running along the South
side of the Subdivision pulls up sod and makes ruts in the
soil behind several of the homes . Refer to Pictures No. 4
through 7B.
3 . On the North side of 57th Street North in front of a
condominium the over flow parking lot drains to the Street
through rocks . This rock bed should be concrete. During a
rain the water runs from a pile of concrete, dirt and rubble
on an adjacent lot through this parking lot and down the
rock drainage bed carrying dirt and rocks into the street .
Refer to Pictures No. 8 through 10 .
4 . There are two vacant lots that are on Osgood Avenue by
58th and 57th Street . These lots are full of tall weeds and
are extremely unsightly and unsafe . We live in a new
subdivision and would like the entrance to the subdivision
to look neat and clean. These lots should be cut and
cleaned up. Is it true that vacant lots in the City of Oak
Park Heights are to be mowed a minimum of once every month?
These two lots have not been mowed this year except for the
area surrounding the builder' s and Realtors ' signs . Refer
to Pictures No. 11 through 15 .
5 . Across the street from 14 63 and 1465 57th Street North
there is a large pile of concrete and dirt that is very
unsightly, unsafe and will cause a severe erosion problem if
left over the winter. We would like this removed
immediately before a child gets injured because of the
temptation to play on it . Refer to Pictures No. 16 through
18
111 %
All of the above items have been 'brought to the attention of the
City of Oak Park Heights numerous times and nothing has been done
to correct them. The following homeowners are numbers of Valley
View Garden Homes Association and are represented by the Board of
Directors :
Joyce Bjork 14823 57 Street North
Ralph and Ulla Reeve 14825 57 Street North
011ie and Rita Sassor 14833 57 Street North
Don and Eileen Peterson 14835 57 Street North
Carol Eastwood 14843 57 Street North
Eunice Peterson 14845 57 Street North
Phyllis Glampe 14853 57 Street North
James and Jean Robinson 14855 57 Street North
Walter and Gladys Goetschel 14863 57 Street North
Howard and Jean Madsen 14865 57 Street North
John and Merit Potting 14873 57 Street North
Mary Jones 14875 57 Street North
Mark and Laura Sullivan 14883 57 Street North
Dennis Belkey and
Katie Castelluccio 14885 57 Street North
Gil and Evelyn Regnier 14893 57 Street North
John and Lillian Jewell 14895 57 Street North
Eva Gentner 14903 57 . Street North
Douglas and Connie Bergmann 14913 57 Street North
John and Janice McLean 14915 57 Street North '
Charles and Florence Claus 14925 57 Street North
Judith Hanner 14933 57 Street North
Clyde and Margaret Thiets 14935 57 Street North
Homer and Esther Nethery 14943 57 Street North
Greg and Debbie Lindow 14945 57 Street North
We as homeowners are very proud to live in Oak Park Heights . The
City' s numerous parks, annual picnic and tree planting program
are a few examples that separate us from the rest . Therefore it
bothers us when we see contractors come in and make a handsome
profit in our city but do not take responsibility for maintaining
the aesthetics of the neighborhood during and after development .
This behavior detracts from the image of Oak Park Heights and we
as a community have to insist on accountability.
PETITIONED this 14th day of October, 1997 .
VALLEY VIEW GARDEN HOMES ASSOCIATION
,,//( "
•ou•� r Bergmann, i esident
Y X r N
411
•
Valley View Garden Homes Association
Board of Directors
President - Douglas Bergmann
Vice President - Howard Madsen
Secretary/Treasurer - Clyde Thiets
Director - Lillian Jewell
Director - Mary Jones
JAN-21-98 WED 08 :47 AM KRONGARD 430 3921 P. 02
II
11 .
Kurth S'urveying, Inn
4002 Jefferson St NE
Columbig Heights, Minnesota 55421
Phone (612) 788-9769 Fax (612) 7r-
P0174V
1 /3d-9e
May 31, 1997 ea-
Mr. Jack KrongardCallijC- e1.4444;21
pla,(1._
do Kraagard Construction ,r 4.6
14791 60th St. No. Suite 2
Stillwater,Minnesota 55082 1/0_,0 / F
/1—t'll, 12(4f/P1
Services rendered thru May 31, 1997-Valley View Additions (Formerly Town } '.a--:--
/, Ckefr;,,,re),Zei
el
1997 Q o )Ca® �'a4,,,...,: '�
f,7' /_ja_ /A e I
May al:n��i4 -
08 Stake house - Lots(& 7 lock 1 Ward with owner
09 Drawing on CIC plat(VVSo.) (1"Supp)
12 Drawing on CIC plat (VVSo.)(1"Supe) S 333.0
14 Drawing on CIC-First 5 ••lemental 60.0
NVSo,
16 Computations on • 7 Block 1 VV3rd , 180.0
19 Restake house Lots . : 60.0
.lock 1 VV3rd 27.5f
20 Stake east plat line- WE --- 8 i I/ C;4 K 0 Ply 208.01
20 Rough stake house- Lacs 10 `1 j- -
30 Stake building corners with concrete contractor^�,����-^_•
200,0(
30 Stake house Lou 3 &4, Block 1 roughstake house
FS 6 dt 7 75.0(
Lots 1 &2, Block 1 205.00
CURRENT NEW CHARGES 205.00
S 1,553.50
STATEMENT
Current new charges
Previous billing
Payment received•Thank you S 1,553.50
Finance charges 4 425.00
) ,423,00
Total due as of May 31. 1997 + 0.00
S 1553.50
.S0
Payment due upon receipt, carrying charge of 1.5% per month after 30 days.
JAN-21-98 WED 08 :47 AM KRONGARD 430 3921 P. 01
411/ •
.,--- iiihiliPok
KRONGARD CONSTRUCTION COMPANY
1111161
14791 60TH STREET NORTH, SUITE 2
STILLWATER, MINNESOTA 55082
PHONE: (612) 430-2314 - FAX: (612) 430-3921
JULY 21 , 1997
CITY OF OAK PARK HEIGHTS
14168 - N 57TH ST.
OAK PARK HEIGHTS , MN. 55082
INVOICE
STAKE EAST PLAT LINE VALLEY VIEW EAST-SEE ATTACHED.
TOTAL DUE $200 . 00
l
e.t.,,, ,__ 61-6LIC °°.41L'
6)a—v"'
Bonestroo,Rosene,Anderlik and Associates,Inc.is a irmative Action/Equal Opportunity Employer
BonestrooOtto G.Bonestroo,P.E. Howard A.Sanford,P.E. hael C.Lynch,P.E. Brian K.Gage,P.E.
Robert W.Rosene,P.E.* Keith A.Gordon.,P.E. James R.Maland,P.E. F.Todd Foster,P.R.
Rosene Joseph C.Anderlik,P.E. Robert R.Pfefferle,P.E. Jerry D.Pertzsch,P.E. Keith R.Yapp,P.E.
■ Marvin L.Sorvala,P.E. Richard W.Foster,P.E. Scott J.Arganek,P.E. Douglas J.Benoit,P.E.
Richard E.Turner,
D.Gustafso
Anderlik & Glenn R.Cook,P.E.P.E. Robert OC.Russek,A.I.A. Mark R.Rolf5,.Loskota,P.E. Kenneth P.Anderson,P.E. Cecwo Olivier,P.E.n,P.E.
Associates Thomas E.Noyes,P.E. Jerry A.Bourdon,P.E. Mark A.Seip,P.E. Kent J.Wagner,P.E.
Robert G.Schunicht,P.E. Mark A.Hanson,P.E. Gary W.Morten,P.E. Paul G.Heuer,P.E.
Susan M.Eberlin,C.P.A.* Michael T.Rautmann,P,E. Paul J.Gannon,A.I.A. John P.Gorder,P.E.
Engineers &Architects *Senior Consultant Ted K.Field,P.E. Daniel J.Edgerton,P.E. Dan D.Boyum,P.E.
9 Thomas R.Anderson,A.I.A. A.Rick Schmidt,P.E. Jeffrey.1.Ehleringer,P.E.
James R.Rosenmerkel,P.E. Dale A.Grove,P.E. Joseph R.Rhein,P.E.
Donald C.Burgardt,P.E. Philip J.Caswell,P.E. Lee M.Mann,P.E.
Thomas A.Syfko,P.E. Mark D.Wallis,P.E. Charles A.Erickson
Frederic J.Stenborg,P.E. Miles B.Jensen,P.E. Leo M.Pawelsky
Ismael Martinez,P.E. L.Phillip Gravel,P.E. Harlan M.Olson
Michael P.Rau,P.E. Karen L.Wlemeri,P.E. Agnes M.Ring
April 17, 1996 Thomas W.Peterson,P.E. Gary D.Kristofitz,P.E, James F.Engelhardt
Mr. Mike Robertson
City of Oak Park Heights
14168 North 57th Street
Oak Park Heights, MN 55082
Re: Valley View Estates, Phase 2
Utility and Street Improvements
Our File No. 55120
Dear Mike:
Enclosed are two (2) copies of the March 18, 1996, television inspection report from Valley View
Estates Phase 2 of the sanitary sewers installed by Volk Construction.
Their report indicates six areas between manholes 70 and 72 in the existing main line that require
roots to be cut out.Also, there is debris that should be removed from the line between manholes 69
and 70. These are all existing conditions that Volk is not responsible for. There is sand and gravel
in some of the new lines and Volk has been contacted to do that cleaning.
The rest of the lines are in good working order.
Please let me know if you have any questions or require further information regarding this project.
Very truly yours,
BONESTROO, ROSENE, ANDERLIK&ASSOCIATES, INC.
(20/-7,./ daild-y(
Carol J. Caron
CJC:gs
2335 West Highway 36 • St. Paul, MN 55113 • 612-636-4600
i r
FAX TRANSMISSION
St. Paul • Milwaukee Date: 4/- 17- q40 J j
Bonestroo
Rosene 2335 West Highway 36 Our File No.: 55 i a
so
viiAnderlik& St. Paul, MN 55113 From: Ca ro/ ea,rc r) I
Associates 612-636-4600 Pages To Follow:
Engineers & Architects Fax 612-636-1311 Original Will Follow In Mail: Yes No ,
To: tie &be r b of Fax Number:
Organization: ( i CIF OPH
Subject: rfaltr , ' `ett, tes - 1 r. 2
Remarks:
The *cle.frls ;69 report f,.. it f-h%S pi'oj"eCt nd; Cad's to area
Jr' the e XT tin 9 ma;0 Line :het-ween man holes 70 and 7Z
where root-5 airte y yreat/ya.C7q c t it and re hri r t In Plow.
hr5a.
T mai n 1;ne crri c5 a. / f ly u,i.5 frm o /-he 195 r-e(Afive/io n
pro]eci a rea.rand 1 i- ,j erlt-ical Mai' e city hire c eorpvac/-
oo e 1 Hi /Orli rna. se5 Arlt offl ,)an;f0iy /'he as `Soon
05 fossihie . 17 ii Our Op;n;on 6-hat once /-hese roots are _
/kernoved Mey will alt ,row ,bac- ,since ct,11 rs ffiat ante
cx;itee 1n the area have been rui do wn , Thr chain 1;ne
behue r n manhcke,a & I ar'c/ 70 �5hov1c/ he bailee/ 1n der
D ie move debvii and ? day Cuf - 6(i t5 .
1 cneed n r o f 1n rrri fl d r7
Cel /lie ,�C.hocca �' you
11 a1 any fit. �t F,� a ,
Copy To: Signed: (l 7i o 61707V
Note To Addressee: If you did not receive all of the pages in good condition, please advise sender
at your earliest convenience. Thank You.
For Office Use Only
Fax then mail: Yes No Urgent fax immediately: Yes No
Call to confirm fax was received: Yes No Fax and return original to sender: Yes No
Make copies for: File Others
Fax copies to(more thanone):
Other:
SOLIDIFICATION, INC. • •
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 10
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
(612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: Easement
FROM: Existing MH 70
TO: Existing MH 69
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 5 FEET TYPE OF AREA: Residential
DEPTH: 15 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 245 FEET LINE CONDITION: Fair VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: Vitrified Clay
. AGE: Existing
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Neeloote1M.miatiM0p. 1971
10 Service Right wye ok
11 Service Right wye ok
22 Service Left wye ok
26 30 DIP approximately 3"
35 40 Camera under water
65 Circular hairline crack left - 6-11 o'clock
131 159 Camera under water -Debris in pipe 2"-3"
198 233 Debris in pipe approximately 2"-3"
245 lMniw/e,N10;Exist 2302
•
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH • WORK ORDER # 6462 D.O. •
PAGE 7
+:NNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
(612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: 57th Street North
FROM: Existing MH 72
TO: Existing MH 71
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 5 FEET TYPE OF AREA: Residential
DEPTH: 10 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 227 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: Vitrified Clay
AGE: Existing
MANHOLE FOOTAGE
VIDEO PHOTO
FROM TO REMARKS �_- FEET NUMBER
0 filik8~alimiscify
1260
9 Service Right tap ok
11 Service Right tap ok
30 Service Left Wye - Roots #9 rf:
45 Service Right Wye - Roots #1
58 Service Left tap ok
98 Service Right tap ok
100 Service Right tap ok
118 Service Left wye ok
130 Service Right Wye - Roots #4
183 Service Right tap ok
185 Service Right tap ok
186 Service Left tap ok
198 Service Left wye ok
•
Continued on next page
SOLIDIFICATION, INC. • •
7233 WINNETKA AVENUE NORTH
WORK ORDER X 6462 D.O.
MINNEAPOLIS, MINNESOTA 55428
(612) 535-1065 DATE 03/18/1996 PAGE 7
MANHOLE FOOTAGE
FROM TO
--- ���M�__��� REMARKS VIDEO PHOTO
216 Service Right uye ok V�~�_r� FEET NUMBER
227 ��j��•��. -'---- -------- -- _"
100416*
till'
. :i
i
f
i
4
i
3
5
4
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. • PAGE 8
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
(612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: 57th Street North
FROM: Existing MH 71
TO: Existing MH 70
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 5 FEET TYPE OF AREA: Residential
DEPTH: 10 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 210 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: Vitrified Clay
AGE: Existing
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 . t7l-Existing z 1460
42 Service Right tap ok
43 Service Right tap ok
,i
53 Camera under water If 1- "
63 Service Left wye - Roots # 9
73 Service Right wye with shrinkage crack 1540
108 Service Left tap ok
•
120 Service ? - Roots #9 --� ���..✓
121 Service Right tap ok
138 Service Left wye ok
149 Roots #4
182 Service Right tap ok
210 igl+f!'b70 f
OS va.ave:aecne.SCVSVI MR *.m am.I.'°aa M r• xm munne
_ ,. '—)16g' ; >,w ••m••nn•F.4 1s Ba1Bpo9ay 'N 1 3AY NLVZO - 'N '1S NILS 1 0
mew 7 3111aPaV O21dr11 1331115 'V.W,IUI
10 9Pr�rj“r.7 aua90y U OMI 3 d — S3IV1S3 M31A A3l1VA ?�.---
"w .1'•11.1"•'•'••'^°'3 OOJBaU°9 V10S3NNIW ISIHOI3H )INVd )IVO i'n
,
T.9E 11
€0 Nit ,0! ,n, .0.
7 1 I I:'. :.
, :i 1'a:1: :iit! ::i
s Li'sio S .. e. I LSm I . ..
1 --F. -'. I.. _. ..._ 1 .I...
.ri 9L'tL5 -
1
r r :�...... 111_ � .4iii.
{• � V
botLa.� ....... ... i .--i 1 -�-""
n I
--- R ,�r I'' . :1
1 y
M.! _ 4 __ S
I •`Yca1.•....1. 1 y,.r..: •.._.;- 1 ,.1 '•.• 1 i ...•......
.........
. : .. ..... ...... .
d,4.—__.ate-f' sT-. ��_$�7, 1 � 1 $- ..•... ... ... . ... .... «..f."... A;' a'7
id ;9,...,1.7 .
- --N-�A-V )1aVZ& -_I / n : • 1' ' - !! -
1a -_.:_ .:.�___. _a.. •_1... ...•
.
x ..15 � • :•n - ;.;;�: ::gig ::::_: ; ...
f, �$ m T. k 1 I. 1 I • • 95'959•
ft,a1 1
bl0�m _� ., ul - 6 E I a -400,1.8 ----•!! 1 ! ,�- .:,_ :29+z.. N
bd • 599 .1.. i....... s. 11
f 1! .act•- -1N nl 1 F q .....
... t 11 1 .. .
O f I ` [ ae {1 it
'.1 ' .--J'-1 —_:� •Ltt9C.f ..,.:.. I it
^ ... 1 ...
CO t _ L_J g¢ lif
j i 9vL99 •i s { .. .. - 6,1 11_ n I
tr) - ,-SIL -�s ..r ,^�!.e 8 ... '�
:1alV"L VI i ' { 11
�, _J m L I � m '59'099 1..'�r .. __ �_««...___1« � I i t 1 -: •
• i
i m --_. S1 a - ! 1Sy .
�� f.� i� � a n j :I►'099 1 '1::::.::::• :. • 11 11.
., 1: 111 Y- N
r-■i °,,m o w 1 • 1 0
_ - _1i 6 dd}PY • .11. • 1 Y ►
li
���`]1_mgg ■ _ Y..a 8F.1 :Y I „......____104....1 .1s°9's a
-- ,�_ Im}V'♦ I n 650 Ct { 6i F�.. 1` .. ..... ... No g1 � p� • 11 91 91 LY,
L __.
IA i b1e 1� 1 91,t119•.
- ” •f •-_ tt-
al m w
1.,,A. , ,b,..
, ., .. ..... V/ fff
* 3w
'III
---,a ---, �..... 1 I
At
I
I t`\ �, � ;�• and ••....{ .... . .a ...: .•: 1 ::
- - —
a
/"'
y <
74—
/
-z
V2: (
(*.•
- -
(.1( /7
•
[� v. " ' CITY OF
.7..,‘:
, OAK PARK HEIGHTS
' 14168 N. 57th Street•Box 2007.Oak Park Heights,MN 55082 •Phone: (612) 439-4439 •FAX 439-0574
_At%
December 2, 1997
Jack Krongard
Krongard Construction
14791 60th Street North, Suite 2
Oak Park Heights, MN 55082
Dear Mr. Krongard:
The City Engineer has reviewed Valley View Estates regarding the
complaints received by the homeowners association. Enclosed is
the letter with the conclusions by our engineer. The City
Council would like to schedule a workshop with you in January to
discuss these issues. Please contact me and let me know whether
January 13 or January 27 would be better for you to meet with the
Council. If you have any questions, please do not hesitate to
call me.
Very truly yours,
udy Holst
Interim: City Administrator `
Enclosure (itAf(-
°-li1/4:1?/11 1)6
cc: DougBergmann
Tree City U.S.A.
Bonestroo.Rosene.Anderlik and Associates,Inc.is an Affirmative Action/Equal Opportunity Employer
BonestrooPrincipals:Otto G.Bonestroo,P.E.•Joseph C.Anderlik,RE.•Marvin L.Sorvala.RE.•
Richard E.Turner,RE.• Glenn R.Cook,P.E.• Robert G.Schunicht,P.E.• Jerry A.Bourdon,P.E.•
Rosene�/ Robert W.Rosene,P.E.and Susan M.Eberlin,C.P.A.,Senior Consultants
Anderlik Associate Principals:Howard A.Sanford.PE.• Keith A.Gordon.P.E.•Robert R.Pfefferle.P.E.•
Nul Q
Richard W.Foster,PE.•'Ovid O.Loskota,RE.• Robert C.Russek,A.I.A.•Mark A.Hanson,P.E.•
Michael T.Rautmann,P.E.• Ted K.Field.P.E.• Kenneth P.Anderson.RE.•Mark R.Rolfs,P.E.•
Associates Sidney P Williamson,P.E.,L.S.• Robert F Kotsmith
Offices:St.Paul,Rochester,Willmar and St.Cloud,MN•Milwaukee,WI
Engineers &Architects
November 7, 1997 ,fit M
Ms.Judy Hoist DEE
V n
City of Oak Park Heights III
14168 5`h Street North i•�;�,,f i 0 1997 i I
Oak Park Heights,MN 55082
Re: Valley View Estates OAK PCITK OF
Our File No.55120
Dear Ms.Hoist:
We have inspected the Valley View Estates area as it relates to a petition the City received relative to
some repair or corrective work requested by the Homeowners Association. A copy of that petition is
enclosed for reference.
It is recommended that an inlet grate be installed on the manhole shown in Picture 1 and a small berm be
graded around the manhole to channel the water to be intercepted. The structures shown on Pictures 2
and 3 do not need to be modified.
The beehives shown in Pictures 7A and 7B should be raised approximately one foot and fill placed
around them.
Mr.Krongard has agreed to replace the rock and gravel spillways with either larger rocks or concrete.
It is recommended that holes be drilled in the two high-capacity catch basins and steel bars installed to
• • reduce the opening size and fmally it is suggested that approximately 10 cubic yards of rock rip rap be
• installed at the east end of the emergency overflow into the park for erosion control.
It should be noted the concrete in Pictures 16 through 18 has been removed.
The inspection was performed with a contractor in the area and they felt that the approximate cost of-the
improvements would be between $2,000.00 and $2,500.00. However, with the lateness of the season it
would probably be best to wait until spring so that the areas can be cleaned up,restored and resodded. It
will also be necessary to determine a source of funding if the City is to proceed with the work.
We are also returning the pictures which we borrowed for your records.and file. If you should have any
questions on this matter,please do not hesitate to call me or Brian Scott.
Very truly yours,
BONESTROO,ROSENE,ANDERLIK&ASSOCIATES,INC.
95441124.,) ac.44.1.;-%
oseph C.Anderlik
•
2335 West Highway 36 • St. Paul, MN 55113 • 612-636-4600 • Fax: 612-636-1311
•
Bonestroo,Rosene,Anderlik and Associates,Inc.is an Affirmative Action/Equal Opportunity Employer
BonestrooPrincipals:Otto G.Bonestroo,RE.•Joseph C.Anderlik,RE.•Marvin L.Sorvala,RE.•
Richard E.Turner,P.E.• Glenn R.Cook,P.E.•Robert G.Schunicht,P.E.• Jerry A.Bourdon,RE.•
RoseneRobert W.Rosene,P.E.and Susan M.Eberlin,C.P.A.,Senior Consultants
• Associate Principals:Howard A.Sanford,P.E.• Keith A.Gordon,PE.•Robert R.Pfefferle,PE.•
Anderlik &
Richard W.Foster,PE.• ['`avid O.Loskota,RE.•Robert C.Russek,A.I.A.•Mark A.Hanson,P.E.•
Michael T.Rautmann,P.E.• Ted K.Field.P.E.• Kenneth R Anderson,RE.• Mark R.Rolfs.RE.•
Associates Sidney P Williamson,RE.,L.S.• Robert F.Kotsmith
Offices:St.Paul,Rochester,Willmar and St.Cloud,MN•Milwaukee,WI
Engineers &Architects
November 7, 1997
Ms.Judy Hoist D Lb U 1'1 IS "Thn i
City of Oak Park Heights
14168 5th Street North t ;1L.1"'f
Oak Park Heights,MN 55082 ' �9�7
Re: Valley View Estates CITYOAK PARK OF
Our File No. 55120
Dear Ms.Hoist:
We have inspected the Valley View Estates area as it relates to a petition the City received relative to
some repair or corrective work requested by the Homeowners Association. A copy of that petition is
enclosed for reference.
It is recommended that an inlet grate be installed on the manhole shown in Picture 1 and a small berm be
graded around the manhole to channel the water to be intercepted. The structures shown on Pictures 2
and 3 do not need to be modified.
The beehives shown in Pictures 7A and 7B should be raised approximately one foot and fill placed
around them.
Mr.Krongard has agreed to replace the rock and gravel spillways with either larger rocks or concrete.
It is recommended that holes be drilled in the two high-capacity catch basins and steel bars installed to
•
reduce the opening size and finally it is suggested that approximately 10 cubic yards of rock rip rap be
installed at the east end of the emergency overflow into the park for erosion control.
It should be noted the concrete in Pictures 16 through 18 has been removed.
The inspection was performed with a contractor in the area and they felt that the approximate cost of the
improvements would be between $2,000.00 and $2,500.00. However, with the lateness of the season it
would probably be best to wait until spring so that the areas can be cleaned up, restored and resodded. It -
will also be necessary to determine a source of funding if the City is to proceed with the work.
We are also returning the pictures which we borrowed for your records and file. If you should have any
questions on this matter,please do not hesitate to call me or Brian Scott.
Very truly yours,
BONESTROO,ROSENE,ANDERLIK&ASSOCIATES,INC.
aced-a (2-
47447
oseph C.Anderlik ( G ''L
(/il`'"" '
X4/7/ 2
7
•
2335 West Highway 36 • St. Paul, MN 55113 • 612-636-4
Enclosure 12B
PETITION
TO
CITY OF OAK PARK HEIGHTS
A MINNESOTA INCORPORATED MUNICIPALITY
LOCATED IN WASHINGTON COUNTY, MINNESOTA
We, the Board of Directors of Valley View Garden Homes
Association, do hereby respectfully petition the City of Oak Park
Heights to repair, correct or require any other responsible party
to repair or correct the following:
1 . The seasonal surface water drains on the South side of
the Subdivision of Valley View Garden Homes should be
raised, opened and open covers put on them. Refer to
Pictures No. 1 through 3 .
2 . Because of the inadequacy of the drains behind the
homes, after heavy rains the water running along the South
side of the Subdivision pulls up sod and makes ruts in the
soil behind several of the homes . Refer to Pictures No. 4
through 7B.
3 . On the North side of 57th Street North in front of a
condominium the over flow parking lot drains to the dtreet
through rocks . This rock bed should be concrete. During a
rain the water runs from a pile of concrete, dirt and rubble
on an adjacent lot through this parking lot and down the
rock drainage bed carrying dirt and rocks into the street .
Refer to Pictures No. 8 through 10 .
4 . There are two vacant lots that are on Osgood Avenue by
58th and 57th Street . These lots are full of tall weeds and
are extremely unsightly and unsafe. We live in a new
subdivision and would like the entrance to the subdivision
to look neat and clean. These lots should be cut and
cleaned up. Is it true that vacant lots in the City of Oak
Park Heights are to be mowed a minimum of once every month?
These two lots have not been mowed this year except for the
area surrounding the builder' s and Realtors ' signs . Refer
to Pictures No. 11 through 15 .
5 . Across the street from 1463 and 142(65 57th Street North
there is a large pile of concrete and dirt that is very
unsightly, unsafe and will cause a severe erosion problem if
left over the winter. We would like this removed
immediately before a child gets injured because of the
temptation to play on it . Refer to Pictures No. 16 through
18
.
^ N
v •. '�
•
1 t
r. a
t
21 t
Pk
I
'‘, t.• .. -,! . • ,...,,,..'"..-
1K. r, - ; \ •yam s-� - :�
I
e� ••, ,•.
.., •+ ��1 r a�ay�
v , ti -
s.:,,,,...:47....•-;..,:
4;1 ....,—_,,t4
,�._7.0�
•
•
I r '/ �
r
•
4 - 1`C ,-
�. J
•
vv
I
I
I
I
I
I
4
,0,,
1
.. } .1
' 1'
r
I
• s) 9 •►
11
I
I
I
1
I l•.44.
t
I
in
v
I
I
I
4
1 It'
l'
•
I ' , '�f,
I
-f
1 i
•
, y f
l• 7
k . '\ + 1 \
,,.-. ,is
. til.. ' _ ,,,,
„. _
_.
P
IAC'• ' is .• i'' r•' 4, c
ai 4101/1� -_,Ter-!..,,,- ! �,.
� ` o.., ` tea
. - j -,,,R. .s.-t`'.:moi- .x, -.2
I
I
r1
•••
=1Ne
I ,—
•
I
R
I .— ,. ,.
. �
, ,,'. e t 7.!..4,O.\Iii. . ,,
I —\• .,.„-vi-
.. ,i „ ‘. tet., ,,,,, ,
I _
fi
11
•. �v , e
r rI � a
Ilf ::* r
,. .
. .
, , .:. . . .... .....,.. . 4.‘'
• ' ' '
1•1!
'\`•ei. /'
•
I '• , . .
` +.
v.
•4 - , .fir Y-,4 A
1 .
I .
1 _ 'j . •k
I
.
_.
I
pa
I
v
I
I
• t .
1 • s.,
1.
444
-i,V,,, . ',r4.7,‘ .t.A_ --.*t4IS e''' • ' .-:.-7 • , ....
•yam"
I
... 4. . , _ ,, ..
. •..i.
, .. ..,._ 6._.. \ :
.- . __ . .....t, - - . .
rof , ,',-. .6,$. . . .4., 4.- . . .
Al
'10
' , 4,)', + .• '
E` , " ' `} lE 'S`V,� � � > r
1 •.�� I s ,+ r ! . r�Y
ill' Y( -4n •:4,',/,, J t, ( ton' 'Ty . ,1p ! ! �`! � � t _
eirAI
' ' / ';'efe rki ), - 4k , ,1 l i $ ,ta '
f.
.tv
.411,
+S 4 5.4 I ,
• em- ,
�
I
4� `'
.1011A1
, y s�. •
I
I
I I.\
co
•...0 I-••
cIN
....,
, ..
I
. .-,4,.•
th .
't .
. • ,
I •
..".it ...,,.. .„..
.....
1 ,• t
t 1.1
. . . . .
I •
t•-, . ,i #
i:
I -,.. , ...
.: .
t .
I .
. .
. i _
•
.
.
S'
•,,, • ,i, 11,,, , ••
•
•,
I li . '.f.
1
- .
'-," .••'%
-8-,v,, .., •• , .
.
—
•
' f,... ,'-.,- •
' , ,••`•,. • ..1# , :
, . #
. ..., . .,.,„ , .
- I.
I , • •
- l• ' 'l'..•
• ' I
. .
., r .... .
.c.. . "ria)'•••/.... '
, .
,
ll i v .•
. • ,
'l • ,
• i . ,.• • ,
. .
k
,..),•- •
.. t
.. . „ ..
I •
•
r f
4 '. ..i• ,IP1 • ......
,tt 4 Ars 0 4 •
'' ', •t• i 4..-
. -
7,k 6 . • , s'''' • 1
, Ir's r•
.... _
I —:i'"--,• •1( '
t...:-..
,,, ) : .i ,
•
40 IS 1,11100
.. ,:. *, ,-* c .• ...•
"I4, °' •
it. , ,, . ,„,,t„,,,
ott 1
.,
,
.. ‘444 t f't
.
I . It.
. . ',
• ,
,f,
I ., •.
•
14
/ !,.d 1 '''tfI. r
,
•
. •- - t •0-• ,1 7.;• '
-- '
....
.., . . , .••
0..
•• ft 4 . -
r‘tit • ' . . 4 it ,
‘.. ..,,
- ..k.
I
, . '• •
. ,
. .
r 1
-ere s,
. _ .
I
. ,
,
, .•
.., •...• .2,-. •••,:„.,
Ifr, P ,
'•,.-- . . .
.„ 1,' ':'-. -
... . ( ( )
I t
f . , . .
„...:•,..
...,06. ,
. ,,
,
Att.4
`,,,, ,
if&
.4,
y 'iTi '
I IIN: 1
t —
Or ,:*.e* .
. II I-11 11 I I 1 1
I , ,
, . I.
I
117-.."..:
II r • -.,
. _
I r 42
.
.
• , .
I •
, F
I ; '
• _pm ,
li •
. .
t - •
•
• -I i •
. . . . 4
I .
f - ,
•,
„ . ., •
•
•
.. ..
1 ,.
V 'i i
—
p. •,`2 It .• .. .,,...v.,. .
r ,,.......- - .4 " ''!'4 • *. 'A' '
-, --.,,.A ,.. • fot d, Abi•- .,
I ' '4 01. ., . • , .-
?c ,, .4 if.•".ii . 4. .5
1 '".4: ' z . ry ' : ' ''••,. 7,'
0 .
' -• r t , l''''._4
, .- • ,
1 ' • ,
. . i:1 ••'; 3.•;•. ; : 1411 4t.• 1: .2.
111111/
11 . .
i .' -j • .
6 ,
. ' .ii ..•
...
. ...,. I
14. '
i ,:.. •
• 4
. . . .
4 .
.-=
= •
•..
,
•
,
, .
•
. ,
4.,
- .41, -A i i -`'=-
'
1 ; 1
14
1 ,
illit.-- 70mo ...'V
i
4
i0&j4 e'
.v.,iu., i.,.'1.''e..
i
,..,t
' ' * Ay, 4, .
if
1._
•-4,-, .
....
. 1
I
I
I I'...
r•I
.-4 e.•
cNi
•••..1
I
I . 0
-... ,
..4., 1
I 1
; .. .. .... ...
I ..
I
,
'N. .
* - .
I
. t,
, .
..... 1,6.
..--
. .
a 1
, 4
:( • 4*-7 ' '' "
I
, • .../..,,,. , ',tom . , . •
.. . .
,. . . ‘,..•
. ,.., . •,.,
111
• ' '1.-.'-.!!'• - . • '' • .-
.... ..1 - -......,.0••••
*-'7'1 '1 ' ' •7"
.• .
,.i.
. . .... .
. . ,,, . •• . • -
.1%
. '''_ • ;- - .- - - -
I
el,
, ' • • •-,..—.r....—
__
•
th
) ''''' ..'1/4/41/11#•.. " '.. Z.1. '-' .
'OP 4
' .
•
, --*"•1111111a3‘41tui-- '. ' t..•
. ';.------
I
. -,- . - . .4‘;,-..1**-• _...... ,
•• .
.... , t. .
I ..•
I
I
I •••-• e....
4
ce) I—i
vo .....
.....
I
111
Il
.
. =
... .
, .
}4.
,. 18
I
*, ...
/..; 1/...i, •, ,
I .,I _ II
. .
10
I .
,
/
t ,
' l'
I .' ,alikliircral . -
. .. •,, _
ri
, .
I .
.• ,
. ,•
, .
' . .
................ .
I
..,
•
, 4
I ,
, .
, ..
--•;--; !---, ' t f .
, !-.....-A -. •. ' t‘ ' _...:.
. .
I
. .
1.. ... 1
4
...
,
. •..
I ..
, ..
I4, +........ • •0°
I
I
I
I
I
I
I
..
v
I 1 Wow
?
'�w�
' ,� :,...,4.40
I i
.411151
' jr
)1.17
.
b /
•
•
k I.i .1.
1 . lley; :,
4•
0 t "It.Ilia
I = tI
I ;
4
1
I 44.•••
1..4 ••••••
CO
•41
S4.44'
414.I
-
'<fligil 411 ,
101,
1,\ \ 4 it ,.•A
444-- OA
44
, ...
. .
.1 .
• i ' , , 4,..., /.1,, ,,, ,,, #. , 0
la. ,. .
41 . . _
...
4' VIK'''' ..:1-,)•J•
. ..., .
I „, - ' -,: nelg:
k
•,' , / -
' t"
, • % -- 'V
e, ..."
..,_
. .
•..,..,
• tr . ___
. .
- -
, 441
. ..., .;
..„. ,
• I -
•.,,;010.,....... '4, •t,
r1/4
i•-'• '.1' '
..... . -
I ,
. . •
:.(0 • -..'" .• .
. 7,r •if . ,..., . _ j.
-,t,:.1.— ..4 •,. • ' - t•-e.40 . I '; 1' '
*42,..,,,''' .44 s'''I,.';-r-..4.'I.I:• .
.....,4 • .:
,
. 1° ,t. i' •,
••
-4, .
i
, r
..alrs-'-- ,."; • , .
.
.
.. .. . ' -
. i- -,-- a , •, "f•1''.
..!
..,-
•
(I
•
. i ., : ' •
t , . ,•
`1,
f - .4- . •
k
•
. 'i , ;',• V. .
. 0' 'V't I • '
"`' - '-'"•• '
•
V
I
,.. .
.."...
),,..
1. .Wir
NW
VI .
I.
. '41, 4 i •
• •
,o SOLIDIFICATION, INC.
---- 7233 Winnetka Avenue North/Minneapolis, Minnesota 55428/(612) 535-1065/ FAX (612) 535-1071
47
De eemb- , . , , Ap r;I L 11940
Mr. Sean Clark
Bonestroo, Rosene, Anderlik & Associates
2335 West Highway 36
St. Paul, Minnesota 55113
SUBJECT: TELEVISION INSPECTION REPORT WORK ORDER #5653
Dear Mr. Clark,
Enclosed are the field findings of our closed circuit television
inspection report as ordered by you for the City of Oak Park Heights.
Should you have any questions regarding this report, please feel
free to contact us.
" Also enclosed is the original invoice and a copy pertaining to this
1p inspection. Please forward the original invoice to the City of Oak
Park Heights with your approval for payment.
We look forward to serving your future needs.
Sin rel
Brent Johnson
Sales Manager
BJ/kb
enclosures
1,4
Specialists In Underpinning and Ground Water Control
Equal Opportunity Employer
CLOSED E CIRCUIT TELEVISION INSPECTION
FOR
111 BONESTROO, ROSENE, ANDERLIK & ASSOCIATES
IN
OAK PARK HEIGHTS, MINNESOTA
VALLEY VIEW ESTATES - PHASE 2
WORK ORDER NUMBER 6462
410
OAK PARK HEIGHTS MINNESOTA
April 4, 1996
Solidification, Inc.
7233 Winnetka Avenue North
Minneapolis, Minnesota 55428
(612) 535-1065
•
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 1
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
(612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: Upper 56th Street North
FROM: Dead End MH 6
TO: MH 5
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstrear
PIPE LENGTH: 13 FEET TYPE OF AREA: Residential
DEPTH: 12 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 182 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: PVC
AGE: New Construction
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #6 0
5 Service Right wye ok
97 Service Left wye ok
182 Manhole #5 160
• 111/0
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 2
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
• (612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates—Phase 2
ON: Upper 56th Street North
FROM: MH #5
TO: MH #2
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 13 FEET TYPE OF AREA: Residential
DEPTH: 12 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 100 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: PVC
AGE: New Construction
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #5 160
5 Service Right wye ok
100 Manhole #2 280
SOLIDIFICATION, INC.
•
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 3
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
(612) 535-1065
111/1
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: Osman Avenue North
FROM: Dead End MH 4
TO: MH 3
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 13 FEET TYPE OF AREA: Residential
DEPTH: 8 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 120 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: PVC
AGE: New Construction
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #4 - dead end 280
5 Service Left wye ok
1110 10 Service Right wye ok
15 Service Left wye ok
20 Service Right wye ok
85 Service Left wye ok
120 Manhole #3 400
• s
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 4
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
• (612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: Osman Ave North
FROM: MH 3
TO: MH 2
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 13 FEET TYPE OF AREA: Residential
DEPTH: 10 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 50 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: PVC
AGE: New Construction
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #3 400
8 Pipe changes to ductile iron pipe
8 16 Sand and Gravel Approximately .5"
26 Pipe changes to PVC
50 Manhole #2
•
•
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 5
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
111/1 (612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: Osman Avenue North
FROM: MH 2
TO: MH 1
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 13 FEET TYPE OF AREA: Residential
DEPTH: 15 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 175 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: PVC
AGE: New Construction
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #2 500
2 8 Sand and Gravel .5"-1"
1111
150 159 Sand and Gravel .5"-1"
175 Manhole #1 630
• •
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 6
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
111/0 (612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: 57th Street North
FROM: MH 1
TO: Existing MH 72
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 5 FEET TYPE OF AREA: Residential
DEPTH: 15 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 364 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: Vitrified Clay
AGE: Existing
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #1 630
1111130 50 Sand and Gravel approximately 1"-2"
58 Service Left wye ok
65 Service Right wye ok
93 Service Right wye ok
98 Service Right wye ok
130 134 Gravel approximately 1"-2"
137 Service Left wye ok
142 Service Left wye ok
170 176 Gravel approximately 1"-2"
178 Service Right wye ok
182 Service Right wye ok
191 Chip in pipe
206 240 Gravel approximately 2"-3"
1110 ----- Continued on next page
SOLIDIFICATION, INC. •
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 6
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
• (612) 535-1065
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
220 Service Left wye ok
237 Service Right wye ok
267 Service Right wye ok
270 Service Right wye ok
307 Service Left wye ok
310 Service Left wye ok
320 Service Right wye ok
364 Manhole #72 Existing 1260
•
•
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 7
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
• (612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: 57th Street North
FROM: Existing MH 72
TO: Existing MH 71
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 5 FEET TYPE OF AREA: Residential
DEPTH: 10 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 227 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: Vitrified Clay
AGE: Existing
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #72 Existing 1260
9 Service Right tap ok
11 Service Right tap ok
30 Service Left Wye - Roots #9
45 Service Right Wye - Roots #1
58 Service Left tap ok
98 Service Right tap ok
100 Service Right tap ok
118 Service Left wye ok
130 Service Right Wye - Roots #4
183 Service Right tap ok
185 Service Right tap ok
186 Service Left tap ok
198 Service Left wye ok
Continued on next page
•
• •
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 7
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
• (612) 535-1065
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
216 Service Right wye ok
227 Manhole #71 Existing
II,
•
SOLIDIFICATION, INC. 0 II,
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 8
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
(612) 535-1065
111/1
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: 57th Street North
FROM: Existing MH 71
TO: Existing MH 70
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 5 FEET TYPE OF AREA: Residential
DEPTH: 10 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 210 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: Vitrified Clay
AGE: Existing
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #71 Existing 1460
42 Service Right tap ok
. 43 Service Right tap ok
53 Camera under water
63 Service Left wye - Roots # 9
73 Service Right wye with shrinkage crack 1540
108 Service Left tap ok
120 Service ? - Roots #9
121 Service Right tap ok
138 Service Left wye ok
149 Roots #4
182 Service Right tap ok
210 Manhole#70 Existing
.
• .
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 9
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
• (612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates—Phase 2
ON: Ozark Avenue
FROM: Existing MH 16
TO: Existing MH 70
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 5 FEET TYPE OF AREA: Residential
DEPTH: 10 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 292 FEET LINE CONDITION: Good VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: Vitrified Clay
AGE: Existing
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #16 Existing 1800
• 149 Service Left wye ok
151 Service Left wye ok
226 Service Left wye ok
247 Service Left wye ok
292 Manhole #70 Existing
1110
SOLIDIFICATION, INC.
7233 WINNETKA AVENUE NORTH WORK ORDER # 6462 D.O. PAGE 10
MINNEAPOLIS, MINNESOTA 55428 DATE 03/18/1996
• (612) 535-1065
FOR: City of Oak Park Heights
AT: Valley View Estates-Phase 2
ON: Easement
FROM: Existing MH 70
TO: Existing MH 69
LINE DIAMETER: 8 Inch ROAD SURFACE: Asphalt CAMERA DIRECTION: Downstream
PIPE LENGTH: 5 FEET TYPE OF AREA: Residential
DEPTH: 15 FEET VIDEO TAPE TYPE: VHS
LINE LENGTH: 245 FEET LINE CONDITION: Fair VIDEO TAPE SPEED: EP
TYPE: Sanitary MANHOLE CONDITION: Good
PIPE MATERIAL: Vitrified Clay
AGE: Existing
MANHOLE FOOTAGE VIDEO PHOTO
FROM TO REMARKS FEET NUMBER
0 Manhole #70 Existing 1971
10 Service Right wye ok
•
11 Service Right wye ok
22 Service Left wye ok
26 30 DIP approximately 3"
35 40 Camera under water
65 Circular hairline crack left - 6-11 o'clock
131 159 Camera under water - Debris in pipe 2"-3"
198 233 Debris in pipe approximately 2"-3"
245 Manhole #70 Existing 2302