HomeMy WebLinkAbout2002-06-28 NAC Planning ReportPLANNING REPORT
TO: Kimberly Kamper
FROM: Mike Darrow 1 Scott Richards
DATE: June 28, 2002
FILE NO: 798.02 -02.14
BACKGROUND
5775 WAYZATA BOULEVARD, SUITE 555
PHONE 6 1 2- 595 -9636
NORTHWEST ASSOCIATED CONSULTAN 7S
COMMUNITY PLANNING - DESIGN - MARKET RESEARCH
RE: Oak Park Heights - W.A.T.E PUD Concept and General Plan of
Development Amendment, Site Plan Review.
W.A.T.E. Enterprises, Inc. has submitted an application to amend the W.A.T.E PUD
Concept and General Plan of Development and for a site plan review.. The property is
located on the west side of Memorial Avenue North and is zoned B -3, Highway
Business and Warehousing District. The total site is .79 acres in size. This
development is part of a larger development area that includes 8.63 acres north of this
proposed development. This area was annexed into the City in 1998.
Currently W.A.T.E. Enterprises, Inc. owns five buildings and H.S.I owns one building in
the W.A.T.E. Addition of the Kern Center. W.A.T.E. Enterprises has an option to build
two more buildings on Lot 4, which would make a total of eight buildings, including
H.S.I.'s building. The applicant is submitting plans to build only the 9,600 square foot
building on the east half of the lot legally described as Lot 4, Block 2, Kern Center 2nd
Addition. Of the total space, 3,140 square feet will be used as office space and 6,460
square feet will be used as warehouse.
The Planning Commission and City Council reviewed and approved the plan for the
W.A.T.E development to the north on May 22, 2000. The applicant has submitted an
application for a PUD Concept Plan and General Plan, which will be tied into the overall
project for the Kern Center.
FAX 6 1 2- 5959837
ST. LOUIS PARK. MINNESOTA 5 5 4 1 6
E -MAIL NAC @ WINTERNET,COM
Attached for reference:
Exhibit A:
Exhibit B
Exhibit C:
Exhibit D:
Exhibit E:
Exhibit F:
Exhibit G:
Exhibit H:
Exhibit L
ISSUES ANALYSIS
Certificate of Survey
Site Plan, Grading Plan, and Landscaping Plan
Circulation Plan
Landscape Plan
Tree Inventory
Site Electrical Plan
Elevation Plans
Sign Plan
Dumpster Enclosure Plan
Comprehensive Plan. The Comprehensive Plan designates this area as highway
business /warehouse. The proposal is consistent with the land use designation.
Zoning. The property is zoned B -3, Highway Business and Warehousing District. The
existing lots meet the lot performance standards of the B -3 District in terms of width and
area requirements. Setbacks required on the perimeter of the site are met and interior
setbacks are based on the height of structures per Section 401.06 B.15. A PUD overlay
to the B -3 District is proposed to address more than one principle building on a lot, joint
access and common space configuration. An Amended Concept and General Plan of
Development is required to approve this development and incorporate it into the existing
W.A.T . E. project.
Subdivision. This lot has been previously platted as Lot 4, Block 2, Kern Center 2nd
Addition.
Impervious Surface. Section 401.300.G of the Zoning Ordinance states that Tots within
the B-3 District must provide a total of 20 percent of the net buildable area of the parcel
as green space. The applicant has identified 112,368 square feet in total buildable area
on Lot 4. Development of the east building will result in 39,284 square feet of
impervious surface and 73,084 square feet of lot remaining as grass and woods. With
this development proposal, 65% of the site will remain as green space.
Access /Circulation. According to the staff recommendations from the General Plan
review of the first addition, the applicant must provide access for public safety and
delivery vehicles on the proposed site. The applicant must review the site plan with the
Fire Chief to determine if the site plan must be revised to allow a turn around area
between the H.S.I building and the proposed building.
2
Off-Street Parking and Loading. Off-street parking and loading is regulated under
Section 401.15F. This requires, among other items, that the entire perimeter of the lot
include concrete curb barriers that shall setback 10 feet to any lot line.
The applicant is proposing 3,140 square feet to be used as office space and 6,460
square feet will be used as warehouse. In determining parking, the following
calculations are used:
Office Parking Requirements- Total of 3,140 * 90% = 2,826 1 200= 15 4- 3= 18 total
spaces needed.
Warehouse Requirements -Total of 6,460 * 90 %= 5,814/1,500 = 4 spaces.
The site plan is required to have a minimum number of 22 parking stalls, with one of
them being disability accessible. The plan indicates a total number of 46 stalls of which
four are disability accessible. The applicant meets the required amount needed as well
as the required amount of handicapped parking stalls.
According to City Code 401 .300 J, any structure erected or altered for a use which
requires the receipt or distribution of materials or merchandise by trucks or similar
vehicles shall provide off - street loading spaces. The applicant is proposing three
loading berths on the west side of each building. According to City Code, all loading
areas shall be screened from surrounding areas by means of vegetative plantings,
berming, and/or a screening fence and must meet City Code standards.
The site plan indicates curb and gutter in the parking areas. The rear of the lot will not
be curbed at this time pending development of the second building on Lot 4.
Landscaping Plan. A landscape plan has been provided for the site. Consistent with
City Code, trees must be replaced based on the caliper inches lost, either in plantings or
a cash equivalent. No trees would need to be removed on the lot with the development
as proposed. The landscape plan must be approved by the City Arborist.
Signage. A signage plan has been submitted that indicates one double face monument
sign. The total square footage of the proposed sign is 40 square feet. Zoning
Ordinance Section 401. 300 N, limits the number of freestanding signs to one per
principal use and requires a comprehensive signage plan for the entire project. No wall
signage is proposed. The proposed sign is consistent with the Zoning Ordinance and
the signage used in the development to the north.
Trash. According to City Code 401.300 K, trash receptacles must be located within a
structure and be consistent with the design of the principal building. The details of the
trash enclosures are attached and indicate that the enclosures will be constructed of
materials that are similar to the proposed building and will be painted to match.
3
Lighting. According to City Code 401.300 1, any lighting used to illuminate off - street
parking shall be hooded and so arranged as to reflect light away from adjoining
property, abutting residential uses and public right-of-way. The plan reflects the use of
shoebox style fixtures for lights on poles and for wall pack units for building lighting.
The applicant's lighting plan must be revised as to not illuminate light onto public right -
of -ways. The photometric plan indicates that light will exceed the Zoning Ordinance of
.4 foot candles at the property line. The light plans will need to be revised to comply
with the Ordinance requirements.
Grading, Drainage Plans. A general grading and drainage plan has been submitted
and is subject to the approval of the City Engineer. Additionally, the City Engineer will
review the plan and make recommendations regarding the drainage and stormwater
requirements for the site. Watershed District approval of the plan is also required.
Utilities. A utility plan has been submitted for the review and approval of the City
Engineer.
Design Guidelines. Building plans have been submitted for the new building. The
buildings propose a combination of concrete tip up panels and glass in an earth tone
color. Awnings are shown over the main entrances on the building and a painted stripe
is proposed on the structure. The combination of all materials are consistent with the
Design Standards. The building will be identical to the existing W.A.T.E. development.
Development Agreement Amendment. An amended development agreement may be
required between the City and developer subject to review and approval of the City
Attorney. Cross easements will be required for the joint access driveways in the
development subject to the approval of the City Attorney.
CONCLUSION AND RECOMMENDATION
Our office recommends approval of the amended Concept General Plan of
Development W.A.T.E. Enterprises Inc., subject to the following conditions:
1. The applicant shall redesign the site plan to allow for a turn - around area between
the H.S.I building and the proposed building if required by the Fire Chief and
subject to approval of the City Engineer.
2. The landscape plan is subject to the review and approval of the City Arborist.
3. Curb and gutter will not be required at this time around the parking and driveway
areas west of the proposed building, but will be required at the time a second
building is approved.
4. The lighting and photometric plans shall be revised to be consistent with the
Zoning Ordinance lighting standards.
4
5. The grading, utility, and drainage plans shall be subject to the review and
approval of the City Engineer and the applicable Watershed District.
6. A development agreement between the City and applicant shall be subject to
review and approval of the City Attorney. Cross easements shall be required for
the joint access driveway subject to the approval of the City Attorney.
7. Any additional comments from the Planning Commission, City Council, and City
Staff.
pc: Kris Danielson
5
CRRTIFICATE
of SURVFIY
SURVEY FOR:
WILL ZINTL
5670 MEMORIAL AVENUE NORTH
STILLWATER, MN 55082
Map No. 02- 151A
52 �.
,06? 7 4= LOT 4
MINIMUM EXPOSED
BASEMENT FLOOR
5 E ELEV. = 928.7 FEET
ti
4. 4,
3
Folz, Freeman, 1, .Dupay & Associates, Inc.
LAND SURVEYING • LAND PLANNING
5620 MEMORIAL AVENUE NORTH • STILLWATER, MINNESOTA 55082
(651) 439 -8833 • Fax (651) 430 -9331
LEGAL DESCRIPTION°
Lot 4, Block 2, KERN CENTER 2ND ADDITION according
to the plat on file and of record in the office of the County Recorder,
Washington County, Minnesota.
j
00
!
!
!
/
/
r �
n- 11/
r / . III
^�
I l
�6 n t — • z LOT 5
1 I
A a ) �9 i //
r` p{asn 9o5em r 1 //
h, / I . Q d ! / / III '70 ----.) f • f ec 68 Feet _2 ? Fe e t '` !
N. /& /I/
o \O‘ �o t/ J Q tS
1 //1 t let F 2►. N NN t ,� P
! ! �� LOT 6
\
KERN CINTFR
2 \D ADDITI0N
DA ' L. DUPAY
TIMOTHY J. FREEMAN
NOTES
0 DENOTES 1/2 INCH IRON PIPE MONUMENT
FOUND MARKED WITH A PLASTIC CAP
INSCRIBED "FREEMAN RLS 16989 ", UNLESS
SHOWN OTHERWISE.
DENOTES 1/2 INCH IRON PIPE MONUMENT
FOUND MARKED WITH A PLASTIC CAP
INSCRIBED "RLS 9232" (B. FOLZ),
UNLESS SHOWN OTHERWISE.
ELEVATIONS ARE HGVD MEAN SEA-LEVEL, 1929 ADJ.
ORIENTATION OF THIS BEARING SYSTEM IS BASED
ON THE RECORDED PLAT OF KERN CENTER 2ND ADDITION
SCALE:
1 Inch = 100 Feet
!
.
- - - -. Pn
oin
to r I l . !� : — utitlitY
!
1 R 2'R
I HEREBY CERTIFY THAT THIS SURVEY, PLAN OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT l AM
A DULY LIC NSED LAND SURVEYOR UNDER THE LAWS OF THE STATE
TA LICENSE NO. 17252 D E:
SOTA LICENSE NO. 16989
NOTE: OFFICIAL COPIES OF THIS MAP ARE CRIMP SEALED
0 2002 ----- Folz, Freeman, Dupay & Associates, Inc. --- All Rights Reserved
cd
E)
up tb
•
ci)
►V
7r�'�°'''�� r g
z 0
T"
0
U7
0
0
[ ❑
N
0
• !it,:;:: a w • � a y h:
Ca , IV
� z w
X 440
Ili {�[{['r ;.
mwO: Ai
fts633,
0
z
Z c) 0
H
-c c) Qt
0
0
-11< fil ..W c
Q M HO
Q
08
Z 6
•
H
o , ,
0
E1 §
1
O � w w (5 .. G
z ou 1
D''
H ,
W '''
�-
a
0 8 L3
e, a
CD
4
r2t Z u
-, �
c
N
C I 0
U
3
228.23
� v
4-i P
Li.
1
ELECTRICAL SYMBOLS
4 e
1
ti ((11'((' C i l h
i;
8 1r q' '5
L-2,: $ 1
\ 4' —0',
ELECTRICAL SYMBOL NOTES
"'"'";Zi CgicaCc7+
Tclioamum, cuyAmumgcgo ce4
Ci
L AP T T-TIftPE7 " b, 7
TH' SrettIES 0/01 015111. t■CMCM
POWER DISTRIBUTION
120/208 VXT ,Cr
VCX_TrArip. (k., Nit 6
f:11
MOTOR AND EQUIPMENT
traton oce.tcnov . i:Ecrtn uhr sal
C:Ire17CO ea Ma, S.)
LIOMFE STARMR
OMINAIION s-rmin,staiwecr
s
e FV24.11.4 STAUCN
vR ..F8.
°I II
01 11
,5 I 1
( P-I g 11
K 4 1
pHIMPoili
ggnggyggini
4 4
ISM x r.CHntaLis.OE3I8..
o�bb
{ 1EE
1 III
1 1 1 18
1 i 11 1
II, E
,15
�€, a
LIGHTING FI.URES
=CC
Me= 1 ZA 7.101riegir
-0 0 9? ar.rAc. Fnovkc
0 RECt1.13 rraunc
PRP
uennrycv P.14
=NUL Hal3 POLE RICTURC
W.. oar. Pcu
' b 6 L bad n
�
l 3 I E p 1 � { 11 i
] Fill E � 1 1 I I
1 f E i !
r! I I
E3 iil 7 4 1 y 1 y yyyyyy � 8 r w ili
annnitaidlnIllii
4"b' oftc -c 4f 9g [4a v .i it .i ffi ri
LIGHTING FIXTURE SCHEDULE
SN.WaH
)Id Vd � ` N jM
d S13WOiOI-Id
J �71i11 133k5
dB
1 ;133 HS
MFGRCAT
OR EQUAL
',777.7 ,
ill
MSS ndAia SdiN,
ISN31
31V110Y9, (0
•
}� Eh 0 I 0
5N0l51113:1
:A .0. :AG M.0
ONIJ.NDOIN
1,114
alOci
1
FIXTURE
TYPE
.1,46-1fri
xou
ay. .19N.
.1 VNI1,111
X09 ROHG
RIGN.
4
.
OID
7 o, '9D
\Y.bV&• \fiDi\.�:;x Erp E•.a:r. o.iq
SITE PHOTOMETRICS PLAN
SCALE:1
nn,
a ni'1 OE
)Id Vd � ` N jM
d S13WOiOI-Id
J �71i11 133k5
dB
1 ;133 HS
',777.7 ,
ill
•
}� Eh 0 I 0
5N0l51113:1
:A .0. :AG M.0
OID
7 o, '9D
\Y.bV&• \fiDi\.�:;x Erp E•.a:r. o.iq
SITE PHOTOMETRICS PLAN
SCALE:1
ELECTRICAL SYMBOLS
z.
r- 3g1 p i;
g Is "d
P
i iii ), 6 !ill
C' IT(( e ®o'
,
s
Far.4741:7:46:7,
POWER DISTRIBUTION
lOOPOO PARC [TOP OF PM. 0 P
oom 2,480 PArc , OF PM, IF,
TRAPPSPC..,
MOTOR AND EQUIPIVIENT
•O• No. OEMS ra
,.....a ow. Rrans To soq
IMTOR STARYPR
a OOSOPIA $1plaPpit.OoptifCT Optrai
mgDP STAMM S.TCH
'03
d1
gi
bi
i fl
N d i z 1
gg
a
1.0,,
'g Vs"
11
11
11
1 E ggg
1� n
, g�g�rr
E°3a.
t ` yyyy
3 f
° S
:41.,..--
1' b
€
1
E
Pg
8
4 b
1
1
I,q
EI
E k
8.:
o
LIGHTING FIXTURES
e %Leg gr.
WONTED
nn.tom
■,, F.V.z
- opy
r ggegrAlr 11. NUM.! CF
• F.LRot.CF OATITA, ?MX
D ig s KCA.
ooixam MAD
iEj. "fi s •E7nn
E
1 1 E °l i E E 1 1
i Z L C
q j . o E
el E aV 8 t , . t om„ s Y
.11ti ki !I I Ii
jll
I j j
e g Qi r
g J
ll it li
LIGHTING FIXTURE SCHEDULE
REMARKS
MFGR CAT #
OR EQUAL
,13SIHAID
ISNT1
RIVIVarn.,70.4
GSY19
a7a13cll
WI - NM
1YJ.B1.4
, MGLi (LI
Bfint
M001 () ]
. 310c1
.1�A
OCI
BciAd
3Bnixu
, X0E1 20.
Ofari yvNis
.1V,1114111
XOG
avai a-FAsus
3:A.
m
0 C s.g9)
41 C359£
J 3
1E1 MI 2
!13[J 1 .0A Q .r. !
sNOIS!A U
SS3NISf ! LJ
NNW
I
6
!rp 1
g
V e a
Mad 1'd71Zi127DT3 WIG
, 3F1.11. 133NS
05'
:AR OM. 13 ' 1,1 . V i
�u %L1 2 ZGC2 '3] L., 7,1d
1v �z.w x�oprl �: o poi � E. i:tit h:a•rh Er.op
ELECTRI GAL NOTES:
Aye 8d `
Apunrjr1 a .awD .
an3g 7e - d$
• an1 1 1I - da-
882•d 1/00/200•d 268 -i
• (YAM yin PIN y- tv
p as • avcp aim
• _$,
�• * a
zu a3q J p
pta ?:�p�s
piejnI► lepuef ale xQq. , i*od a 9A
WOO-54 t )pers apt1 e9 NOLB pans - H1gs
. apnpua dwe1 as auoX q `D'. '
Xgpugx stn - zb
L1? o3 do
(icaoriitzeNFI):r AS
°r Cat uaq .11.rlaax# c .- Oil
t 1 ssa1) apeadaae) ologd d�
' p 1 .1a vs:
pue am cY. pa ;sii in .0
- s,alc: p, epuExs ot.
0)p.p t.P.rM cls'uu IVaed,iaj iad
.oz - •e
00.1u15 'MU $1 ;'ef eS 9
(aOWi
xcr ase
um: p w1) -etas mans
dii5 dwex pa). aj pu? ID u ?
a�u � pmetd gtr 'p pev�
&u ids t1 =pay. asind .rule io
1n6ow pasapua s T b5 a
- 1 uisno 1 erne#
u� iv OOI pU1 'Oussnti u�ntpat�
ul moot O+, do Wei turlpos
�x�ssaad g6tH pue 101.1 1
1 nub Wuie LseV4 •wnuitAnte tsea sl
: 2Jq 1ieM ' unOW apss mod' .1.01.
ppinwad ume wnuLuun1r papnpq
2002 929 219+
Et) 1Pnv1N t1
- ;11.1
•. soz• OZ t.
uthellyik 9
OLIO ),
died V98VdiGO ril
u4ski f1ae a <10d
aj grbs a-piD1.14wAs sA
monr4. p Je
1) uJwT,se - 111
4oPalfaii
zala -- HWS - i — J\1 —
el 0
� ]5 ut plau..Japaila3
Al 113 •:J!ppett n �a
iilrgcsnrpo Inepc ,va .ddtuel
Clad leito E da iseUteq FsawE
ea. s a as X41 pine se6r t_i
qovL pmuna 't�, a t� • �� g
arenbsA IQ 1V iti add.apino)d
'd E� imuoz ipq
.wnu!wn1e paZlpOun iAnadfs
•sxauasei
aru de .� L4 M paanaas
pomp po5u!H '641sr a4 paw)1s 5
Aurt!. 'sual sy016 paradU,x61. 1_ 4
%leap wet. loop tunujrunie veD
•aic 1.liuQuigpv - e
piE1 .0a1(te uanu!Wfie
papturo pure'sJau.too snlpu
45
4wit SLr!5na 1 uJ = un l 1Ser.) •
T
(95"-LEI) 012101 N1
(L 3) I V A N
OOi Vk
0 0
(IA2) �ry talV
ON1O1fVdS
rti aur:l
.[i.x
- 311)
mooto.dn 131
1
'Dyed pie . naa VIIRM
d sAtilAVEA4 tiact 'P1120 e)1,110
's ❑ safrs o rre iscouerxua Aseaa;e
&u pedJO. SioawalsnpfJ 4jO.
4/psi 0,terip rat 'a °. eauhropay
lthutx,
. •;a1
D!JloRl9 21.11W-1110,1d WO2:20 20- 90,Utr
{. cc:,�err rc�eE
L4 ?Wrod
iw'� -+ w •a'
1 �G•3�*1 - +�+�i '�fr+n Jo riai:.ra er+}rr :r
a.zn�aa�xi(a W °Lxau rsap
E�'� �wZaiu
v1053r'INIW N °tSagi
�P'Tn �;IRjzY F'as7;c?Pag �S�:p s tze r a�v7 �-�
ne 4 1Jopcn e pczwa -2 IT
AA
. . 1 ; iSr1437$97
1
� po
a. �
n.
n
t OS�Iff�lil�l��JH�aa.�N �E Jb+ vivre
S AN.
w f
I
Ca
W
` •
�; v .:,. ��,
y , -V _
z z
< < < 2
w w LU
H
z z
0
w uJ UJ
I H H
z
0
H
z
w
z
0
uJ
0
w
Ca
0
0
z
Et
W
H
z
31V3S 0
Zo1919
AT 'W
I
i
w
713o1RJHS 909
3011N91S Ot 31X3
N `sl- S131-1 xdbd xdo
d2JN33 SS3NSl78
x JVdNNWi
"-,J .c- \D
a (-)- 3,
C n
\ --1 c3(&
in
H :42, , i
d \) k 61-
0 i-- , 2
i
1
I
1
srichards4nacpianning.co. , 6/28/02 11 :00 AM -0500, WATE Ent erprises - Landscape Pia
To: srichards-nacplanning. com
From: "K. D . Widin" <kwidin @ni npcc . org>
Subject: WPc • Enterprises - Landscape Plan
Cc: VV►►�w 9
Bcc:
X Attachments:
Scott -
1 have reviewed the plans submitted for the WAIL Enterprises project on KeArket Center Lot 4,
Block 2 (dated 6/3/02) and have the following comments:
1. A tree inventory has been submitted for the site A building is planned eventually for the portion
of the property which contains trees; however, that is not part of this submittal. There is no tree
replacement required for this portion of the project.
2. The landscape plan is very simple but adequate for the type of project. The plant
species/ akk-kt ► s are hardy and should do well on the site.
Kathy e .�.
Municipal s o ..$
City of Oak Park Heights
Printed for "K.D. Widen' <kwidin mmmpcc.orgy 1