HomeMy WebLinkAbout2018-08-16 Cross Connection Control Device Performance Test Reports - Interstate Testing Aug.20.2018 10:99 AM Interstate Testing 7637555365 #0250 P 9/18
Cross Connection Control Device Performance Test
interstate Testing
2140 141st Ave.NW.
Andover Mn.88304
Phone(783)7444149
CKNEN iNFORMATt L --�
rA•seet Aarre ® 89oe1 PL-8
SIMS ...:•..•• Bernie Cama Pere«+ Yarsp1ase Number
T 1 Yt:c A q'"-i 1- „...-3( i 4 1) `i ? < ^,2'k 7
FLY .IPY IIR,O4AIAl1i�M I. rp- i l•-1','i <.h
Street Address
•
a cf iZ PI'1( )4'0?A t< � n .
a,cw,rbty Lavaca?"a°1 •./ /1/ !/``�'�y
N+mn,Aocaaar, / Mcoet eery Number
LA)7Gk19) i ,?i—kL- /3a-7 'c
c:
rt 9
di-::::.7: ,. gPrat 3 ` PSID
❑Leaked5) ■e,a•.• d Did not open
Static " PSID Static F PSID
SINALIEST
❑Coed tight O Ceased tight Opened rat PSID
Static PSID Steric PSID
DETECTOR BYPASS ASSE IBLY INITIAL TEST�q_rAmit ,��roe x�,��.m RP IeRe(va4
ED
❑Mead tight DCioeadtightat PSID
❑Leaked CI Leaked ❑Did not open
Static PSID Static PSID
DETECTOR BYPASS ASSEMBLY FINAL TEST
D Closed tight 0 Closed NM Opened at PSID
Static PSID Static P91D
PRESSURE VACUUM BREAKER INITIAL TEST PRESSURE VACUUM BREAKER FINAL TEST
AILIDSKYdlista:r:,r; r.... iAklnktistbal
p51D s�light Opened at PSID tM PSID
d)kl Poi opm Static
Ste& PSID
COMMENTS ,..A/I -a Z-- 6C7----c.
I HEREBY CERTIFY THE TEST RESULTS ARE TRUE AND THE TEST WAS CONDUCTEQ BY ME PERSONALLY.
Tester Nemo(print) 1)6%A el / 1 11-e-i- Registration No.0 6,i-3.2 3 R rt1nto of Day
TesterSlgnatvre��> -�C Phone No.76,5 Date 811(/I
74"16/'`)