Loading...
HomeMy WebLinkAbout2018-09-28 Stantec Plan & Drainage Design Review Stantec Consulting Services Inc. 2335 Highway 36 West Stantec St.Paul MN 55113 September 28,2018 File:193800151 Attention: Mr.Eric Johnson,City Administrator City of Oak Park Heights 14168 Oak Park Blvd.N.,P.O.Box 2007 Oak Park Heights,MN 55082-2007 Reference: Ridgecrest—Plan and Drainage Design Review Dear Eric, We have reviewed the plans and drainage calculations submitted 9-25-2018 regarding the proposed Ridgecrest Development.All previous comments and recommendations have been addressed. The general comments have been acknowledged by the developers engineer. The only outstanding issue is the final determination from MnDOT regarding the crossing of the frontage road with the sewer and water connections. General Comments 1. The City reserves the right to inspect the construction of the project. The City or its designee shall be present for water and sanitary sewer service connections to the City's systems. 2. The Owner will need to comply with all requirements of the NPDES Construction Stormwater Permit and the Brown's Creek Watershed District. The City reserves the right to require additional erosion control measures as determined/necessary during the construction of the project. 3. A permit may be needed from MnDOT for work in 60th Street North. 4. Parking,lighting,landscaping and building to be reviewed by others. 5. The Owner shall be responsible for obtaining all required permits. 6. Utility construction and improvements in the right-of-way need to conform to the City's Standard Detail Plates. If you have any questions or require further information,please do not hesitate to contact me. Regards, Stantec Consulting Services Inc. Lee M.Mann,PE City Engineer Phone:651-604-4850 Lee.m an n©stantec.corn Design with community in mind September 28. 2018 Mr. Eric Johnson, City Administrator Page 2 of 2 Reference: Ridgecrest - Plan and Drainage Design Review c. Andy Kegley, Public Works Director Julie Hultman, Building Official Scott Richards, City Planner Mark Vierling, City Attorney Lisa Danielson, City Arborist Design with community in mind Julie Hultman From: Mann, Lee <Lee.Mann@stantec.com> Sent: Monday, October 1, 2018 8:29 AM To: Eric Johnson Cc: Andrew Kegley; Scott Richards (Scott@PlanningCo.com);Julie Hultman; Lisa Danielson; Mark Vierling (MVierling@eckberglammers.com); 'Kevin Sandstrom'; Shari Ahrens Subject: Ridgecrest Plan Review Attachments: johnson_mann_Ridgecrest_09-28-2018_review.pdf Hi Eric, Attached is our review letter for the latest submittal for the Ridgecrest development. We have no further comments, except we are waiting on resolution from MnDOT regarding the crossing of the frontage road with the sewer and water connections. Let me know if you have any questions. Lee M. Mann, PE MN,WI, CA Principal Direct: 651 604-4850 Mobile: 651 775-5956 Lee.Mann@stantec.com Stantec 2335 Highway 36 West St. Paul MN 55113-3819 US CIO Stantec The content of this email is the confidential property of Stantec and should not be copied,modified,retransmitted,or used for any purpose except with Stantec's written authorization.If you are not the intended recipient,please delete all copies and notify us immediately. 1