HomeMy WebLinkAbout2018-09-28 Stantec Ltr Re Plan & Drainage Design Review Stantec Consulting Services Inc.
2335 Highway 36 West
Stantec St. Paul MN 55113
September 28, 2018
File: 193800151
Attention: Mr. Eric Johnson, City Administrator
City of Oak Park Heights
14168 Oak Park Blvd. N., P.O. Box 2007
Oak Park Heights, MN 55082-2007
Reference: Holiday Inn Express—Plan and Drainage Design Review
Dear Eric,
We have reviewed the updated plans and drainage calculations submitted 9-21-2018 regarding the
proposed Holiday Inn Express. Following is our remaining comment:
Sheet C300, Stormwater Drainage Review
1. Indicate/show on the plan that the EOF for the pond, if/when utilized, will direct stormwater to the
roadway ditch and not the Stillwater Motors parking lot.
General Comments
1. The City reserves the right to inspect the construction of the project. The City or its designee shall
be present for water and sanitary sewer service connections to the City's systems.
2. The Owner will need to comply with all requirements of the NPDES Construction Stormwater
Permit and the Brown's Creek Watershed District. Provide the City with the final approval and
conditions from Brown's Creek. The City reserves the right to require additional erosion control
measures as determined/necessary during the construction of the project.
3. Parking, lighting, landscaping and building to be reviewed by others.
4. The Owner shall be responsible for obtaining all required permits.
5. Utility construction and improvements in the right-of-way need to conform to the City's Standard
Detail Plates. The City's details will be provided.
If you have any questions or require further information, please do not hesitate to contact me.
Regards,
Stantec Consulting Services Inc.
Lee M. Mann, PE
City Engineer
Phone: 651-604-4850
Lee.mann@stantec.com
Design with community in mind
September 28, 2018
Mr. Eric Johnson, City Administrator
City of Oak Park Heights
14168 Oak Park Blvd. N., P.O. Box 2007
Oak Park Heights, MN 55082-2007
Page 2 of 2
Reference: Holiday Inn Express- Plan and Drainage Design Review
c. Andy Kegley, Public Works Director
Julie Hultman, Building Official
Scott Richards, City Planner
Mark Vierling, City Attorney
Lisa Danielson, City Arborist
Design with community in mind
Julie Hultman
From: Mann, Lee <Lee.Mann@stantec.com>
Sent: Friday, September 28, 2018 2:31 PM
To: Eric Johnson
Cc: Andrew Kegley; Scott Richards (Scott@PlanningCo.com);Julie Hultman; Lisa Danielson;
'Kevin Sandstrom'; Mark Vierling (MVierling@eckberglammers.com); Eric Kaul
Subject: Madison Hospitality - Holiday Inn Express
Attachments: johnson_mann_HolidaylnnExpress_09-28-2018_review.pdf
Hi Eric,
Attached is our review of the Holiday Inn project plans submitted 9-21-2018. There is one remaining clarification
needed. Let me know if you have any questions.
Lee M. Mann, PE MN,WI, CA
Principal
Direct:651 604-4850
Mobile: 651 775-5956
Lee.Mann@stantec.com
Stantec
2335 Highway 36 West
St. Paul MN 55113-3819 US
Stantec
The content of this email is the confidential property of Stantec and should not be copied,modified,retransmitted,or used for any purpose except with Stantec's written authorization.If you are not the
intended recipient.please delete all copies and notify us immediately.
1