HomeMy WebLinkAbout2004-06-14 OPH Ltr to CA Forwarding Document for RecordingCITY Or
OAK PARK HEIGHTS
14168 Oak Park Boulevard No • P.O. Box 2007 • Oak Park Heights, MN 55082-2007 • Phone: 651/439-4439 • Fax 651/439-0574
June 14, 2004
Mr. Mark Vierling
Eckberg, Lammers, Briggs, Wolff & Vierling.
1835 Northwestern Ave.
Stillwater, MN 55082
Re: Xcel Energy — A. S. King Plant
Interim Use Permit — Temporary Placement of Administrative Office Trailer
Complex
Dear Mr. Vierling:
Enclosed herewith for filing with the Washington County Recorder's Office, please find:
- A copy of the Interim Use Permit, including referenced Exhibit A.
No e A Certi
EJ:jah
s,
tic Johnso
City A
Enclosur. s
for
ation has been attached.
Tree City U.S.A.
STATE OF MINNESOTA )
COUNTY OF WASHINGTON ) ss.
CITY OF OAK PARK HEIGHTS )
NOTICE OF CERTIFICATION
I, the undersigned, being duly qualified and acting as City Adm.ithst -ator for the City of Oak
Park Heights, Minnesota DO HEREBY CERTIFY that I have compared the attached document:
Interim Use Permit
For
XeeI Energy Ca AP S. King Plant
Allowing Temporary Placement of Administrative Office Trailer Complex
with the original thereof on file at the offices of the City of Oak Park Heights, and that the same is a
full, true and complete copy except referenced attachments, which can be viewed at the city offices,
of said document within the files of the City of Oak Park Heights.
WITNESS my hand and the seal of the City of Oak Park Heights, this 14th day of June,
2004.
ric Johnso
City A ■ ator
Owner:
Address:
CITY OF OAK PARK HEIGHTS
INTERIM USE PERMIT
FOR
XCEL ENERGY COMPANY
Date Issued : June 2004
Legal Description: Alien S. King Plant
See "Exhibit A" Legal description attached hereto
Xcel Energy Company
414 Nicollet Mall
Minneapolis, Minnesota
Present Zoning District: I- INDUSTRIAL
Permitted uses set forth in Ordinance 401 Section 40 1.12
I. INTERIM USE PERMIT FOR:
The City of Oak Park Heights has received a request from Xcel Energy for an interim use permit to allow
for an administrative office trailer complex at the Allen S. King Generation Plant located on Highway 95
II. ADDITIONAL RESTRICTIONS AND PROVISIONS.
The following additional restrictions and provisions being part of the
Interim Use Permit issued herein affecting the following matters shall be:
1. The administrative office trailer complex shall be removed from the A.S. King Plant property on
or before July 1, 2009. The site shall be returned to a usable condition subject to review and
approval of the Building Official once the trailers have been removed.
2. The site plan shall be revised to include at least 32 parking spaces, subject to review and approval
of City staff. Parking shall be allowed on a gravel surface.
3. The freestanding lighting shall be designed so as to be no more than a total of 25 feet. All
building wall packs shall be full cut off fixtures.
4. The applicant shall provide plans for trash handling.
5. All grading and drainage plans and utility connections shall be subject
to review and approval of the City Engineer.
6. No Design Guidelines review shall be required for this structure.
7. The plans and hydrant locations shall be subject to review and approval
of the City Building Official and Fire Marshal. The temporary structure shall not require an
automatic sprinkler system.
8. The plans shall be subject to review and approval of the Department of Natural Resources and any
other regulatory agency, as applicable.
9. All City permits required for fill shall be obtained as per City ordinances prior to building permit
issuance.
Date:
IN WITNES 1 OF, s e partie
CITY OF K4i IGHTS
Its
c
Ic6 locc(
By
David Beaudet, Mayor
Date: By
Eric Johnson
City Administrator
Xcel Energy Company
68 Itsta 26,4
I Date:
set forth their hands and seals.
By
Exhibit A
A.S. King Plant legal description
A.S. King Plant —1103 King Plant Road
Washington County GEO Code: 02- 029 -20 -23 -0004
Legal Description: Entire Gov't Lots 2 & 3, Section 2, T29,. P 20 as included in
�
NSP Torrence RT of Title #44483