Loading...
HomeMy WebLinkAbout2004-06-14 OPH Ltr to CA Forwarding Document for RecordingCITY Or OAK PARK HEIGHTS 14168 Oak Park Boulevard No • P.O. Box 2007 • Oak Park Heights, MN 55082-2007 • Phone: 651/439-4439 • Fax 651/439-0574 June 14, 2004 Mr. Mark Vierling Eckberg, Lammers, Briggs, Wolff & Vierling. 1835 Northwestern Ave. Stillwater, MN 55082 Re: Xcel Energy — A. S. King Plant Interim Use Permit — Temporary Placement of Administrative Office Trailer Complex Dear Mr. Vierling: Enclosed herewith for filing with the Washington County Recorder's Office, please find: - A copy of the Interim Use Permit, including referenced Exhibit A. No e A Certi EJ:jah s, tic Johnso City A Enclosur. s for ation has been attached. Tree City U.S.A. STATE OF MINNESOTA ) COUNTY OF WASHINGTON ) ss. CITY OF OAK PARK HEIGHTS ) NOTICE OF CERTIFICATION I, the undersigned, being duly qualified and acting as City Adm.ithst -ator for the City of Oak Park Heights, Minnesota DO HEREBY CERTIFY that I have compared the attached document: Interim Use Permit For XeeI Energy Ca AP S. King Plant Allowing Temporary Placement of Administrative Office Trailer Complex with the original thereof on file at the offices of the City of Oak Park Heights, and that the same is a full, true and complete copy except referenced attachments, which can be viewed at the city offices, of said document within the files of the City of Oak Park Heights. WITNESS my hand and the seal of the City of Oak Park Heights, this 14th day of June, 2004. ric Johnso City A ■ ator Owner: Address: CITY OF OAK PARK HEIGHTS INTERIM USE PERMIT FOR XCEL ENERGY COMPANY Date Issued : June 2004 Legal Description: Alien S. King Plant See "Exhibit A" Legal description attached hereto Xcel Energy Company 414 Nicollet Mall Minneapolis, Minnesota Present Zoning District: I- INDUSTRIAL Permitted uses set forth in Ordinance 401 Section 40 1.12 I. INTERIM USE PERMIT FOR: The City of Oak Park Heights has received a request from Xcel Energy for an interim use permit to allow for an administrative office trailer complex at the Allen S. King Generation Plant located on Highway 95 II. ADDITIONAL RESTRICTIONS AND PROVISIONS. The following additional restrictions and provisions being part of the Interim Use Permit issued herein affecting the following matters shall be: 1. The administrative office trailer complex shall be removed from the A.S. King Plant property on or before July 1, 2009. The site shall be returned to a usable condition subject to review and approval of the Building Official once the trailers have been removed. 2. The site plan shall be revised to include at least 32 parking spaces, subject to review and approval of City staff. Parking shall be allowed on a gravel surface. 3. The freestanding lighting shall be designed so as to be no more than a total of 25 feet. All building wall packs shall be full cut off fixtures. 4. The applicant shall provide plans for trash handling. 5. All grading and drainage plans and utility connections shall be subject to review and approval of the City Engineer. 6. No Design Guidelines review shall be required for this structure. 7. The plans and hydrant locations shall be subject to review and approval of the City Building Official and Fire Marshal. The temporary structure shall not require an automatic sprinkler system. 8. The plans shall be subject to review and approval of the Department of Natural Resources and any other regulatory agency, as applicable. 9. All City permits required for fill shall be obtained as per City ordinances prior to building permit issuance. Date: IN WITNES 1 OF, s e partie CITY OF K4i IGHTS Its c Ic6 locc( By David Beaudet, Mayor Date: By Eric Johnson City Administrator Xcel Energy Company 68 Itsta 26,4 I Date: set forth their hands and seals. By Exhibit A A.S. King Plant legal description A.S. King Plant —1103 King Plant Road Washington County GEO Code: 02- 029 -20 -23 -0004 Legal Description: Entire Gov't Lots 2 & 3, Section 2, T29,. P 20 as included in � NSP Torrence RT of Title #44483