HomeMy WebLinkAbout2005-04-12 Fully Executed Interim Use Permit Amendment - Trailer Complex ExpansionRECEIVED
APR 1 05
RECD BY:
City of Oak Park Heights
14168 Oak Park Blvd. N 4) Box 2007 • Oak Park Heights, MN 55082 • Phone (651) 439-4439 • Fax (651) 439-0574
April 12 2005
TO:
Please affix your signature to this
conditions (1, 2, and 3) and that
Once you have signed above, p
Mr. Ronald Elsner
Xcel Energy
512 Nicollet Mall
Minneapolis, MN 55402
Thank You.
lsner, Xcel Energy
FROM: Eric Johnson, City Adminis
RE: Expansion of Temp.Office Trailer Complex —
Dear Mr. Elsner:
The following conditions are applicable to your recent trailer expansion:
nterim Use Permit Amendment
1. All conditions, elements and timetables are similarly applied to the April 2005 expansion as
are documented in your initial Interim Use Permit — issued June 2004, copy attached hereto as
"Exhibit A".
2. A total of 45 parking spaces shall be provided and specifically demarcated directly east of the
trailer complex as depicted in application.
3. The potable well installed directly adjacent (south) of the trailer structure, shall be abandoned
by means of proper capping techniques by July 1, 2009. Xcel Energy shall provide the City
with a copy of the well permit issued by the Minnesota Department of Health andior
Minnesota Department of Natural Resources for this well within 30 days of the date of this
letter.
el Energy's acknowledgement and acceptance of these
with the term as stated.
d keep one copy for yourself
Attn: Mark J. Vierling
1835 Northwestern Avenue
Stillwater, Minnesota 55082
(651) 439-2878
If
E yJ 1 b 1t'
�
Return to: .
ECKBERG, LA.N MFRS, BRIGGS, WOLFF
VIERLING, P.L.L.P.
11
1
1
11
NOTICE OF CERTIFICATION
3451902
1
11
1
1
1 1
11
3451702
1
Office of the
County Recorder
Washington County, MN
Certified tiled andlor recorded on:
2004107102 1 :13 :00 PM
Cindy Kooemenn
County Recorder
STATE OF MINNESOTA )
COUNTY OF WASHINGTON ) ss.
CITY OF OAK PARK HEIGHTS )
1, the undersigned, being duly qualified and acting as City Administatot for the City of Oak
Park Heights, Minnesota DO HEREBY CERTIFY that I have compared the attached document:
2004.
NOTICE OF CERTIFICATION
Interco Use Permit
Pot
Xcel Energy Co. --w A. S. King Plant
Allowing Temporary Placement of Administrative Office Trailer Complex
with the original thereof on file at the offices of the City of Oak Park Heights, and that the same is a
full, true and complete copy except referenced attachments, which can be viewed at the city offices,
of said document within the files of the City of Oak Park Heights.
WITNESS my hand and the seal of the City of Oak Park Heights, this 14th day of June,
Owner:
Address:
CITY of OAK PARK RIGA'S
INTERIM USE PERMIT
FOR
XCEL ENERGY COMPANY
Date Issued : June 2004
Legal Description: Allen S. King Plant
See "Exhibit A" Legal description attached hereto
Xcel Energy Company
414 Nicollet Mall
Minneapolis, Minnesota
Present Zoning District: I -IND ' S TRIAL
Permitted uses set forth in Ordinance 401 Section 401.12
I, INTERIM TJSE PERMIT FOR:
The City of Oak Park Heights has received a request from Xcel Energy for an interim use permit to allow
for an administrative office trailer complex at the Allen S. King Generation Plant located on highway 95
II. ADDITIONAL RESTRICTIONS AND PROVISIONS.
The following additional restrictions and provisions being part of the
ianterixn. Use Permit issued herein affecting the following matters shhalI be:
1. The administrative office trailer complex shall be removed from the A.S. King Plant property on
or before July 1, 2009. The site shall be returned to a usable condition subject to review and
approval of the Building Official once the trailers have been removed.
2. The site plan shall be revised to include at least 32 parking spaces, subject to review and approval
of City staff. Parking shall be allowed on a gravel surface.
3. The freestanding lighting shall be designed so as to be no more than a total of 25 feet. All
building wall packs shall be full cut off fixtures.
4. The applicant shall provide plans for trash handling,
5. All grading and drainage plans and utility connections shall be subject
to review and approval of the City Engineer.
6. No Design Guidelines review shall be required for this structure.
7. The plans and hydrant locations shall be subject to review and approval
of the City Building Official and Fire Marshal. The temporary structure shall not refire ah
automatic sprinkler system,
8. The plans shall be subject to review and approval of the Department of Natural Resources and any
other regulatory agency, as applicable.
9. All City permits required for fill shall be obtained as per City ordinances prior to building permit
issuance.
Date:
1 Date:
Date:
IN WITNES ► 1 t - 't 6 parti
CI
'I" OF �� . 4IGHTS
4 ,
David Beaudet, Mayor
Eric Johnson
City Administrator
Xcel Energy Company
68 1 / 4 LitE 2c.\41z.
Its :. C
set forth their hands and seals.
s 1
By
s4;84 as 11.14- 42, °lc TAY T e: 0 • - - 2, 3 - (3( m_)4
ega' IT)escrii rtlre L •i51:6
'1. 0-retire of' Tit
1 fit 44 • 4
Exhibit „A,.
AS lad 1.-2gid idesitr
EFaiit
,4,47!„47,,
Section as i.ncoadeci
e #11 44. 8 3