HomeMy WebLinkAboutDevelopment Application & NarrativeMRR-14-2006 11:4� OR/%' PARK HEIGHTS CIT-r
HEIGHTS # DEVELOPMENT Ae"LICATION
r-rry OF OAK PARK
P. 04/
14168 Oak Park Boulevard Base Fee: L �°', �
P.O. Box 2007 � � ,� � �
Oak Park Hei MN 55082 Escrow Amount'. L 0QQ � U .� 5
( 651) 439-4439 Fax'. ( 651) 439-0574 u 0 q sqt;
Street Location of Property 6-OL1.2 C&IZAUip 6 ff IJ J
Le Description of Propert
Owner: Name
Address: 11e)_3 Ai
W
zi
.g el
State: All P
C ity )ZAA1 �1 '
Business)
Telephone: (Home). �'�,�`� � � �°
( Other) Fax )
Applicant: Name
Address:
4.
Led, State: Zip:
p:
C • Y ,: o
( Business) ee
Telephone%. (Pome)zl�e-2 gZ
( Fay, ) 1 ( Other )
T of Re
- Zonin g Distdct Amendment
Conditional Use Permit
Varlanceff, in le Famil Residential
Varilance: Other Residential /Corn Mercial/IndustriaI
Subdivision
Subdivision', Minor
Comprehensive Plan Amendment
Description of Re
I
If a re for plannin action on the sub site or an part thereof has been
previously approvedly please describe it below:
I f
4 k A�
7j+ t 10�
.Owner/Applicant Initials
MR 1 5XIM
Home Occupation
Site Plan Review
ICU D: Amendment
PUD- Concept Plan
PUD: General PIgn
--Street Vacation
Cit Financial Assistance
MRR --14 --2006 11:4:3 OR K PARK HE I GHTS C I TY P. 05/13
Development Application, Page 2
General Conditions
Application Review'
acknowled es that before this request can be considered and /or approved, all
The undersigned acknowledg � .
required
information and fees, including any deposits, must be paid to the City. An incomplete
application will be returned to the applicant, The application approval process commences and an app lication is consid complete when all requ information and fees are submitted
appropriately to the City.
Professions! fee Flesponsibltity
It is the understanding of the undersigned that all City incurred professional fees and expenses
associated with the processing of this request(s) will be promptly paid upon receipt. If payment
is not received from the applicant, the property owner acknowledges and agrees to be
responsible for the unpaid fee balance either by direct payment or a special assessment
against the property.
A pplicants will be billed on a monthly basis for planning, Engineering, legal and Community
Develo rent fees as they are accrued. It is understood that Interest will be charged on the
�
i
account at the maximum rate allowed by the Fair Credit Act if t becomes thirty (30) days past
due. Failure to pay administrative and processing fees in a timely manner may result in denial
of the application. All fees must be paid at the time of application and shall be paid prior to the
issuance of a building permit.
The undersigned applicant further acknowledges and consents that all unpaid fees owing the
City of Oak Park Heights small be treaded as unpaid utility fees and may be certified for
collection as with delinquent utility billings and may be assessed against the subject real
properly if unpaid by October 31 of each year.
rope d re s .� � .�� � - � � z Orio
—It
Construction Activities at the A. S. Fling Moeiter Landfill - 2006
The final p hase of construction, Phase 6, Ce115, and the capping of the current
operating area of the facility, Phase 6, Cell 3, will be occurring during the summer
months of 2005.
Xcel Energy, A. S. King plant, is proposing a minor modification to the existing
permitted construction of these areas as identified in the Minnesota Pollution
Control Agency (MPCA) permit number SW-54. The modification will develop
the site in a less intrusive way. The footprint of the proposed construction area
will be shifted further to the west than currently permitted, reducing the impact on
the closest neighbors. The long term, post - closure access road will be changed
to reduce traffic nearest these neighbors and eliminate the need for a long terra
site driveway access from Beech Road. To allow this modification to meet the
needs of the A. S. King plant capacity requirements, both the base elevation and
the final elevation of the phase will be raised. The upper elevation increase will
dampen the currently permitted valley that was originally proposed, making the
ground surface more useable for long -term end -use options.
The MPCA has reviewed this Minor Modification request and has approved these
changes.
The immediate and most impacted neighbors have been contacted. They have
reviewed the changes and find them acceptable.
This ro osed modification will utilize the existing cul-de-sac at the west end of
p p
58 street in oak Park Heights as the post-closure access point which will allow
Xcel Ener gy to access the monitoring station for monthly inspections and
leachate management in the event of equipment failure. The 58 th street access
point will not be used during the remaining operating life of the site. The existing
Beech Rd haul road will continue to be the access point for both this construction
event and remaining fill /operating activities of the facility. The operating life
expectancy for this facility is anticipated to be the end of 2009 or early 2010.
p Y