Loading...
HomeMy WebLinkAboutDevelopment Application & NarrativeMRR-14-2006 11:4� OR/%' PARK HEIGHTS CIT-r HEIGHTS # DEVELOPMENT Ae"LICATION r-rry OF OAK PARK P. 04/ 14168 Oak Park Boulevard Base Fee: L �°', � P.O. Box 2007 � � ,� � � Oak Park Hei MN 55082 Escrow Amount'. L 0QQ � U .� 5 ( 651) 439-4439 Fax'. ( 651) 439-0574 u 0 q sqt; Street Location of Property 6-OL1.2 C&IZAUip 6 ff IJ J Le Description of Propert Owner: Name Address: 11e)_3 Ai W zi .g el State: All P C ity )ZAA1 �1 ' Business) Telephone: (Home). �'�,�`� � � �° ( Other) Fax ) Applicant: Name Address: 4. Led, State: Zip: p: C • Y ,: o ( Business) ee Telephone%. (Pome)zl�e-2 gZ ( Fay, ) 1 ( Other ) T of Re - Zonin g Distdct Amendment Conditional Use Permit Varlanceff, in le Famil Residential Varilance: Other Residential /Corn Mercial/IndustriaI Subdivision Subdivision', Minor Comprehensive Plan Amendment Description of Re I If a re for plannin action on the sub site or an part thereof has been previously approvedly please describe it below: I f 4 k A� 7j+ t 10� .Owner/Applicant Initials MR 1 5XIM Home Occupation Site Plan Review ICU D: Amendment PUD- Concept Plan PUD: General PIgn --Street Vacation Cit Financial Assistance MRR --14 --2006 11:4:3 OR K PARK HE I GHTS C I TY P. 05/13 Development Application, Page 2 General Conditions Application Review' acknowled es that before this request can be considered and /or approved, all The undersigned acknowledg � . required information and fees, including any deposits, must be paid to the City. An incomplete application will be returned to the applicant, The application approval process commences and an app lication is consid complete when all requ information and fees are submitted appropriately to the City. Professions! fee Flesponsibltity It is the understanding of the undersigned that all City incurred professional fees and expenses associated with the processing of this request(s) will be promptly paid upon receipt. If payment is not received from the applicant, the property owner acknowledges and agrees to be responsible for the unpaid fee balance either by direct payment or a special assessment against the property. A pplicants will be billed on a monthly basis for planning, Engineering, legal and Community Develo rent fees as they are accrued. It is understood that Interest will be charged on the � i account at the maximum rate allowed by the Fair Credit Act if t becomes thirty (30) days past due. Failure to pay administrative and processing fees in a timely manner may result in denial of the application. All fees must be paid at the time of application and shall be paid prior to the issuance of a building permit. The undersigned applicant further acknowledges and consents that all unpaid fees owing the City of Oak Park Heights small be treaded as unpaid utility fees and may be certified for collection as with delinquent utility billings and may be assessed against the subject real properly if unpaid by October 31 of each year. rope d re s .� � .�� � - � � z Orio —It Construction Activities at the A. S. Fling Moeiter Landfill - 2006 The final p hase of construction, Phase 6, Ce115, and the capping of the current operating area of the facility, Phase 6, Cell 3, will be occurring during the summer months of 2005. Xcel Energy, A. S. King plant, is proposing a minor modification to the existing permitted construction of these areas as identified in the Minnesota Pollution Control Agency (MPCA) permit number SW-54. The modification will develop the site in a less intrusive way. The footprint of the proposed construction area will be shifted further to the west than currently permitted, reducing the impact on the closest neighbors. The long term, post - closure access road will be changed to reduce traffic nearest these neighbors and eliminate the need for a long terra site driveway access from Beech Road. To allow this modification to meet the needs of the A. S. King plant capacity requirements, both the base elevation and the final elevation of the phase will be raised. The upper elevation increase will dampen the currently permitted valley that was originally proposed, making the ground surface more useable for long -term end -use options. The MPCA has reviewed this Minor Modification request and has approved these changes. The immediate and most impacted neighbors have been contacted. They have reviewed the changes and find them acceptable. This ro osed modification will utilize the existing cul-de-sac at the west end of p p 58 street in oak Park Heights as the post-closure access point which will allow Xcel Ener gy to access the monitoring station for monthly inspections and leachate management in the event of equipment failure. The 58 th street access point will not be used during the remaining operating life of the site. The existing Beech Rd haul road will continue to be the access point for both this construction event and remaining fill /operating activities of the facility. The operating life expectancy for this facility is anticipated to be the end of 2009 or early 2010. p Y