Loading...
HomeMy WebLinkAbout2005-04-04 OPH Ltr to Applicant Re Bldg #33 fire suppressionCit of Oak Park Hei 14168 Oak Park Blvd. N 9 Box 2007. Oak Park Hei MN 55082 9 Phone (651) 439-4439 * Fax (651) 439-0574 April 0, 2005 NIr. Mark Fritsch, Plant Mana A. S. King Plant Xcel Ener 1103 Kin Plant Road Ba MN 55082 Dear Mark, This purpose of this letter is to memorialize our conversation of Frida April 1", 5 2005 relative to the disposition of the 4,000+1- s foot buildin (Project ID # 33) to be constructed with the MERP. As y ou know Cit code does re that this buildin have an operatin fire suppression s ( sprinklers ) , but at this time and for an interim period onl the Cit will allow the construction and use of the buildin as cold stora only for non-hazardous materials wp� without the immediate installation of such suppression s However, this condition is not suitable for an lon -teen use includin such cold stora Accordin one, of the followin shall be COMPLETED b December 31, 2008: 1. used upon whatever buildin protection codes exist in the Cit on Jul 1 st, I 2008,, the entire structure shall be brou to code compfiance, including the installation of an appropriate fire suppression sprinkler s 2. The structure ( includin g footin shall be removed and the propert brou back to a suitable pre-construction condition. Prior to 711108, should the facilit be determined b the Cit to be utilized for operations/actions other than for such cold stora Xcel Ener shall brin the facilit into code compliance as outlined in itern I above or shall remove the structure. In a ffL the C ity strona1v advises Xcel Ener to install fire suppression mtems at this time , --Pyen thou zh- th buildin g is prop on for cold §!qr e and wflI not be an "inhabited" fac Lastly, should Xcel Energy fail to implement either of the two items; the City shall proceed to a special assessment (condemnation) against the property and shall remove such structure. Under this scenario, Xcel would be responsible for all admm" istrative, engineering, legal and other fees related to the removal and disposal of the structure. Accordingly, Xcel Energy shall specifically allow such Special Assessment and may not dispute such Special Assessment, Naturally, the City is in need of a letter from your office that agrees to the dates and processes as above and agrees to waive any disputes of Special Assessment. Upon the receipt of such letter, Xcel Energy may proceed with the ultimate placement of the structure (Project ID #3 3) subject to the terms of the Building Permit. Plq let . ow if you have any questions. erel Eric Jo n City .' �nistrator Cc: Mark vlerling, City Attorney Darre Knutson, Xcel Ron Elsner, X cel Russ Wirtz, Xcel Jim Butler, Building Official Brad Carmichael, Fire Inspector