Loading...
HomeMy WebLinkAbout2004-08-06 WCA Decision NoticeOctober 1, 2004 Dear Mr. Johnson: Sincerely, Dale E. Homuth Regional Hydrologist Minnesota Department of Natural Resources DNR Waters, 1200 Warner Road, St. Paul, MN 55106 Telephone: (651) 772-7910 Fax: (651) 772-7977 Mr. Eric Johnson City Administrator, City of Oak Park Heights 14168 Oak Park Blvd. Box 20007 Stillwater, MN 55082 c: Jim Bodensteiner, Xcel Enegry Molly Shodeen, Area Hydrologist RE: Xcel Energy King Plant Tower Height Variance, Certification of Local Decision The Department of Natural Resources has reviewed the information we received on September 15 and 16, 2004, and relative to the new cooling towers height variance. The new cooling towers are needed to meet regulatory discharge standards. The new towers will be pulled back to meet the bluffline setback and will be approximately 60' tall. Four new cells of these dimensions were constructed in 2000. The existing 10 cells will be demolished and replaced with 18 new cells. The King Plant is also constructing stormwater retention and treatment facilities to help mitigate the impervious surface coverage at the facility, as part of their overall emission reduction project. After careful consideration of the issues, the Department of Natural Resources hereby certifies the variance as complying with the intent of the National Wild and Scenic Rivers Act, the Federal and State Lower St. Croix River Acts, the Master Plan adopted thereunder, and Minnesota Rules, Parts 6105.0351 to 6105.0550. We greatly appreciate your cooperation in complying with the intent and administration of the Wild and Scenic Rivers Act. If you have any questions, please contact Molly Shodeen (651-772-7915) for assistance. DNR Information: 651-296-6157 • 1-888-646-6367 • TTY: 651-296-5484 • 1-800-657-3929 An Equal Opportunity Employer irlt Printed on Recycled Paper Containing a t 4 , minimum ()1 20, post_consunier vyr„,ste