HomeMy WebLinkAbout2019-04-16 PVB Test Report - Irrigation Pressure Vacuum Breaker Assembly (PVB) & Spill Resistant Pressure Vacuum Breaker
Test Report
re......._
itali. PiriS 1-,(147f
yi,.1,1: arm r4, ,,,,: i , 1 c\FIqVDT541,
h, . -
Poriii, , I rr 7e,, Jor).t
i n ,f J-,i1
, 0 0 ,,
PVB -------------> Shutoff#2 Gate Check Valve Air Inlet Valve SRPVB -Tightness of
Valve Check Valve
Leaking( )
Initial Test Leaking ( ) Closed Tight SA Failed to Open ( ) Failed to Open ( )
Pressure Drop Across
Closed Tight 0 Check Valve#1 psid Opened at psid psid
r
Any Repairs/parts
Used I )Of' c2, '12 Air Inlet Valve
Leaking ( )
Final Test Leaking ( ) Closed Tight( ) Opened at_psid Failed to Open ( )
Pressure Drop Across ( )
Closed Tight( ) Check Valve#1 psid Opened at psid
Certification
I herebycertify the foregoing data to be correct and that the device Assembly Final Test Performance
tested is functioning wi •'n the limits of the standards
Pass .121
Signature: :' _gr. //,..._ 0
/ FailEll
Date: — -- P
Royce Roberts Certification #PM063607
Gary Pegues Cerification #PM064908
Sabre Plumbing Heating and A/C
15535 Medina Road, Plymouth, MN 55447
763-473-2267
Plumbing Bond License: PM645349