City of Oak a neights
14168 Oak Park Blvd N.o Box 2007 e Oak Park Heights, MN 55082 ® (651) 439 -4439 Fax 439-0574
June 3, 2004
Mr. Ron Elsner
xcel Energy
414 Nicollet Mall
Minneapolis, MN 55401
RE: CUP Documents - Trailer Structures
Ron',
Enclosed are three copies of the CUP document necessary for the placement and operation of the trailers
you seek to be placed at the site. Please sign all three copies and return to my office. The City will then
execute the same and have the document recorded at the County. I will also mail you a completed
document for yo files.
F
r
nk Y
i, ,, is Joh
r
City Aid nistrator
Cc: V Mark Vierling, City Attorney
Julie Hultman
CITY OF OAK PARK BEI
INTER 1M USE PERMIT
FOR
XCEE ENERGY COMPANY
Date Issued: June 2004
i
Legal Description: Aden So King Plant
See "Exhibit A Regal description attached hereto
Owner: Xcel Energy Company
Address: 414 Nicollet Mall
Minneapolis, Minnesota
Present Zoning District: I- INDHSTRIAL
Permitted uses set forth in Ordinance 401 Section 40 1.12
1. INTERIM USE PERT FOR..:
The City of Oak Park Heights has received a request from Xcel Energy for an interim use permit to allow
for an administrative office trailer complex at the Alien S. Ding Generation Plant located on Highway 95
ff. ADDITIONAL RESTRICTIONS AND PROVISIONS.
The following additional restrictions and provisions being part of the
Interim. Use Permit issued herein affecting the following matters shall be:
1. The administrative office trailer complex shall be removed from the A.S. King Plant property on
or before July 1, 2009. The site shall be returned to a usable condition subject to review and
approval of the Building Official once the trailers have been removed.
2. The site plan shall be revised to include at least 32 parking spaces, subject to review and approval
of City staff. Parking shall be allowed on a gravel surface.
3. The freestanding lighting shall be designed so as to be no more than a total of 25 feet. All
building wall packs shah be full cut off Mures.
4. The applicant shall provide plans for trash handling.
5. All grading and drainage plans and utility connections shall be subject
to review and approval of the City Engineer.
6. No Design Guidelines review shall be required for this structure.
7. The puns and hydrant locations shad be subject to review and approval
of the City Building Official and Fire Marshal. The temporary structure shall not require an
automatic sprinkler system.
S. The plans shall be subject to review and approval of the Department of Natural Resources and any
other regulatory agency, as applicable.
9. All City permits re quire d for fill shall be obtained as per City ordinances prior to building permit
issuance.
IN WITLESS WHEREOF, the parties have set forth their hands and seals.
CITY OF OAK PARK BEIGHTS
Date: By
David Beaudet, Mayor
Date: By
Eric Johnson
City Administrator
cel Energy Company
Date: By
Its
Exhibit A
A.S. King Plant legal. description
A. S. King Plant — 1103 King Plant Road
Washington County GEO Code. 02- 029 --20- 23-0004
Legal Description: En tire Gov't Lots 2 & 3 , S ectian 2 ` , 29,. R20 as included in
SP Torrence RT of Title #44483
City
14168 Oak Park Blvd N.* Box 2007 9 Oak Park Heights, MN 55082 (651) 439 -4439 Fax 439 -0574
May 27, 2004
TO: Mr. Darrell Knutson, Plant Manager A Xcel Energy
FROM. Eric Johnson, City .administrator
RE: Fill permit 1 Placement of Trailers
As you know the City Council approved Xcel Conditional Use Permit for the temporary placement of
administrative trailers. The timing for the issuance of such actual permits will be approximately 7 days as
these must come from the City Attorney's office. In the interim, you may proceed with filling of the area
adjacent to the entrance station and as shown on the submitted piano
You had indicated that there is to be some excavation prior to placing fill upon this site. Please ensure that
this fill is placed in an appropriate area, i.e. not in a wetland, drainage swale or other sensitive area. Please
submit a drawing where such fill is to be placed so the City has the fill site documented.
The area to be filled for these structures was discussed and was included in the CUP document and
authorizing resolution as approved by the Council. Please note that Xcel may place the trailers on this site
before both Xcel and the City have executed the CUP document as approved by the City Council, but you
would be required to correct any inconsisten. ' with the CUP that may arise.
S.
Cc: Weekly Notes
Scott Richards
Jay Johnson
Julie Hultman
Jim Butler
Mark Vierling
Eric A. Johnson
From: Ja Johnson
Sent: Monda April 26,2004 12:25 PM
To: Eric A. Johnson Jim Butler; Mark Vierlin ( E-mail) ; Scott Richards (E-mail)
Cc: Julie Hultman
Subject: Fillin of pond at Xcel Plant and other sites.
Fillin of land is considered land reclamation under 308 (see below). Fillin of 25 y ards
per acre is considered land reclamation and re a conditional use
0
25 cubic y ards over one acre is less than 1/4 inch of dirt.
308.08 Land Reclamation and Gr
Within this Ordinance, land reclamation is the reclaimin of land b
depositin or movin materials so as to alter the g rade. Land reclarrialon
shall be permitted onl b Conditional Use Permit in all districts.
Depositin a total of more than twent (25) cubic y ards of material
per acre, either b haulin in fill or re the area, shall constitute land
reclamation. Land reclamation in all flood plains shall be in accordance
with the Flood Plain Ordinance. The permit shall 'Include, as a condition
thereof, a finished g rade plan which shall not adversel affect adjacent
land, shall re the t of material permitted, pro ra in for rodent
control, plan for fire control, and g eneral maintenance of the site, controls
for vehicular in and e draina and control of materials
disbursed from wind and/or haulin of material to and from the site.
Other than 308 1 do not find in our codes where a g radin g permit is re It mi be re
under the Buildin Codes.
For most of our projects g radin g to this extent is included in with the overall project (PUD or CUP)
and a separate CUP for fillin is not written.
Xcel Fillin of the old chemical ponds is estimated to re 3500 y ards of fill and will re a
CUP under 308.
Stillwater Auto Parts Site. The have hauled in more than 25 y ards of dirt and have been
spreadin that dirt on the site west of the Oak North site. There are not Permits for this
work. Mr. Nolde has just hauled it in and spread it.
Does an know of other places in our ordinances or the current buildin codes that re a
permit for fillin or excavatin
Ja E. Johnson, P.E.
Public Works Director
Cit of Oak Park Hei
651-439-4439
:T HWEST ASSOCIATED CONSULTANTS,
Facsirnile: 952.15,915,9337
April 22, 2004
Mr. Ronald Elsner
xcel Energy
512 Nicollet frail
Minneapolis, furl 55402
FEE: oak Park Heights — Development Application for an Interim Use Permit
For an office Trailer complex at the xcel Energy Allen S. Ding Plant
FILE N0: 793.02 — 04.05
Gear Mr. Elsner:
Thank you for meeting with city staff and Mayor Beaudet yesterday regarding your
plans for the office trailer complex at the xcel Energy Allen S. King Plant in oak Park
Heights. There were two items that we requested that should be submitted to move this
project forward:
I . Mailing labels for property within 500 feet of the plant site, These should be
submitted as soon as possible to allow for public notice.
A count of the total number of designated parking stalls currently at the plant. If
areas are not designated or on gravel, please indicate the overall size of these
parking lots.
As you are aware, this application will be considered by the Planning Commission at its
meeting on Thursday, May 13, 2004 at 7:00 Pivl at city Hall. Please contact me with
any questions you may have.
Sincerely,
NORTHWE&T ASSOCIATED CONSULTANTS, INC.
J.
Sr m S
8'coti D. Richards, IcP
Senior Planner
PC: Eric Johnson
Julie Hultman
Darrell Knutson, xcel
Jude Huffman
From: Julie Hultman
ent: Friday, April 16, 2004 10:13 AM
.�: Butler Jim (E- mail); Carmichael Brad (E- mail); Holst Judy (E- mail); Johnson - Eric A. (E- mail);
Johnson Jay (E- mail); Postler Dennis (E- mail); Richards Scott (E- mail); Swanson Lindy (E-
mail); Vierling Mark (E- mail); Widin Kathy (E -mail)
Subject: Wednesday - April 21 st Site Review Meeting - 10 a. m.
Hi Everyone -
Please remember to mark your calendars for site review meeting next Wednesday (4-21) for 10 a.m. We have
applications from DDD LLC - Bldg. #2 and from xcel Energy (King Plant).
Have a great weekend!
Julie Hultman
t,
C 112'rY OF OAK PARK HEIGHTS DEVE LOPMENT A
i
14168 oak Park Boulevard
P.O. Box 2007 Base Fee:
Oak Park Heights, MN 55082' Escrow Amount:
(651)- 489 -4489 Fax: (85 489 - 0574
/ <p lVe
Street Location of Proper 15
S'
ti o n of Prop
L egal Description
Owne Name c` ELI �.
Address: t rCo e
+ o ` tate: f ' Zip
I e
C i t y: r
ity. j -
T'ele hone: (Home (Business)
(Fax) (Other)
Appl i cant: /h ��J r 5 1 f L• p
Name `e LF [ /
A ddress: - � �Ile Z_/
• a I N L2L{ r f Stat A tV
1 Z ip:
Cit - --- - - - - -- p '6 Telephone: (Home) (Business) . �
(Fax (Other)
T of Request(s) 1
5
Zoning District Amendment Home Occupation
conditional Use Permit eview
Variance: single Family Residential 6> PU D: A went
Variance: Other residential /commercial /Industrial PUD: concept Plan
Subdivision - � 'U D: General Plan
Subdivis' or street Vacation
m rehensive Flan Am ndment city Financial Assistance
Description of Request(s)a
I f a p
request for anninglzoning action on the subject site or any part thereof has been
q
previously approved, please describe it below:
Owner /Applicant Initials
A- XcelEnergy
March 17, 2004
'E'ric Johnson
City Administrator
Oak lark Heights, MN 55330
FEE: King Plant Rehabilitation project
Admin Trailer Complex Temporary Use Permit Application
Clear Mr. Johnson;
Attached is the initial Submittal for a temporary Use Permit for installation of the Office Trailer
Complex to be used during execution of the ling Plant rehabilitation project at the Xcel
Energy Allen S. King Plant.
The plan is to arrange the 9 trailer modules as shown on the Plan drawing and to locate the
trailers as shown on the Utilities Plan drawings. The trailer will be connected to existing plant
water, electricity and Sewer system as indicated on the Utility Flan drawing.
Thank you for your assistance in moving this application through your processes as Soon as
possible.
F ly,
ner
Project Manager
Attachments
ryY7_C:CJ
:
- -
;�. �-:: : --� -- -- �� > T- ::: i•� `�^ I
�J .. ;::aL•,: �?ar�t �.. u _.._iL:� � � �L'.liE luTa�N � ._.._..... �� _.....- .......- _.._._w.- _ -.-._ ..____�. .w
N ORTHERN STATES POWER CO.,
�Sk
;1
A. S. K PETTY CASH
414 NICCLLET MALL
r MINNEAPOLIS, MN 55401 7wi Q
DATE
PAY r�
TO THE
i
OF3PER 0
' ® o L LA R S
® Norwest Bank Minnesota, N.A:
` Norwest Center t'
NORWES BANKS
j� Sixth and Marquette
ANAW vow
Minneapolis, MN 55479
FO
❑� ❑35�� � ®91 ❑❑❑❑191' 0355 ❑3 13711
�rf
.�... � nn � � za • '" ��' -[ {:� : ]77�= ir'.�r- .a.- c�� ^:st.^ -,:.� d: %**r. - -"" �Y •�`W`___ � , , ,...,; • --,r
l,�a� .i�, .�.rr= :� . �_�_.�mm_._.,•- �;�rrrrr�:� �:�:ir:csn� _ _ �' t�c�'*,:xrm;~ t�:' � C?________..�f.'....._. � ._._._ ; ?I...___.�___�:��' �'^�' _ .. .— .— ---� � r- fr �.�_ n. �:r W —m _ �'
- - ^' . _. 1 r i �; r. ,perry -r,' ^ f77T•; �� �C �� '�. �,_.� � xr �` [t.e �"�? �� L___.__
www.xcelenergy.com
Xcel En
Michael S. Miser
Senior Specialty Engineer
1103 King Plant Rd.
Bayport, Minnesota 550
Phone: 651.
Fax: 651.731.7337
mich a e I ,s,miser @ xcelenergy.co m
www.xcelenergy.com
Y< R,
XcelEner
Darrell G. Knutson
ProjectMenager
1103 Ki ng PI ant Road
Bayport, Minnesota 55003
Phone: 651.731.5751 Pager: 612.510.2374
Fax: 651,731.7305
darrell .g,knutson @xcelenergy,com
Michael J. Peterson, P.E.
O Y a e a a o a a a o a a a a a a a e 9 a a a a a a a n Q a a Q a a 0 u
Civil Design Engineer II
901 Marquette Avenue, Suite 2900
Min neapoAs, MN 55402
612.215.1403
ax. 612-766.0360
Michael .j. Peterson @ue -rorp. com
mobile. 720.480.2925
www, ue -Corp, coal
UTILITY
+,y N
s
r
NORTHWIC""'ST ASSOCIATED CONSULTANTSy INC-
r rf'r `v sou levy rd, suites
St, :. Pet
- r � �-'
.596.96 i. 1 �
� � �����r����� �•. `� p �
r •-
r
March 25, 2004 {
fA t
U L,. ,r
Mr. Ronald Elsner ..- ...._.,.
xce i Energy
512 Nicollet Mall
Minneapolis, MN 55402
REC oak. Park Heights — Development Application for an Interim Use Permit
For an office Trailer complex at the xcel Energy Allen S. ling Plant
FILE No: 798.02 — 04.05
Dear Mr. Elsner:
The City of oak Park heights is in receipt of your application submitted March 1 8, 2004
seekin g consideration by the city for your project. With this letter, we are notifying you
that pp
our application will be deemed complete with receipt of the following items by April
y
1 4, 2004.
A gi htin plan if any additional parking lot or exterior building fights are added
g
with this project,
2. A arkin plan for this and the ' entire Allen S-, Ding Plant to determine
parking p
conformance with parking standards.
3. Elevations and /or p ictures of the proposed building exterior. All four facades
must be represented. -
A letter from the cit y of Bayport acknowledging acceptance for connection of
utilities.
5. Five copies of all plans, including those already submitted, shall be provided to
p
the city at full size.
As rt of the review p rocess for this application, a site plan review will be held on April
p
21 2004 at 1030 AM at city Hall. We encourage you and/or your representatives to
attend this meeting.
If
the additional information is submitted as required, this application will be considered
b y g the Planning Commission of the city of oak • Park Heights at its meeting on
Thursday, May 13, 2004 at 7:00 PM at City Hall.
XcelEnergy
5Ai
April 13, 2004
Mr. Eric Johnson
City Administrator
Oak Park Heights, MN 55330
RE: city of Oak Park Heights — Development Application for an interim use permit for an
office trailer complex at the Xcel Energy Allen S. King Plant
Gear Mr. Johnson:
Attached p lease find the documents requested in the letter from Mr. Scott Richards, dated
March 25, 2004. Specifically,
1. Five (5) full -size copies of Metro Emissions Reduction Project drawings.
a. construction Trailers and Parking
b. construction Administration Trailers Plan
These drawings show all where the trailers will be located, and the water, sewer, and
electrical conceptual routes.
2. The location of lights for the parking lot and exterior building lights are shown on the
plan drawing and also, product information sheets for the light fixtures are attached.
3. The parking plan for the trailer complex.
4. Photos of the trailers. one photo shows a single trailer module and the other photo
shows an example of how the complex will look. (The example includes 17 trailers,
our plan includes only 9 trailers)
5. E-mail from the city of Bayport indicating that the connection of the trailers to the
sewer system is acceptable.
0. The original March 17 letter which submitted the Development Application. The
attached drawings supersede the previously submitted General Plan drawing.
We trust that these documents satisfactorily complete our application and look forward to
meetin g with you on April 21 at 10:00 AM at City Hail. we hope that our plan meets with
y our approval so that we can begin installation of the trailers on or before June 1, 2004.
Should y ou require further clarification, please do not hesitate to contact me at (703) 370 -
1296.
Thank you for your assistance.
Sincerely,
Russell Girtz
Engineering Manager
King Rehabilitation Project
Xce-lEnergy SAI
April 13, 2004
Mr. Eric Johnson
City Administrator
Oak Park Heights, MN 55330
RE: City of Oak Park Heights — Development Application for an interim use permit for an
office trailer complex at the Xcel Energy Allen S. King Plant
Dear Mr. Johnson:
Attached please find the documents requested in the letter from Mr. Scott Richards, dated
March 25, 2004. Specifically,
1. Five (5) full -size copies of Metro Emissions Reduction Project drawings.
a. Construction Trailers and Parking
b. Construction Administration Trailers Plan
These drawings show all where the trailers will be located, and the water, sewer, and
electrical conceptual routes.
2. The location of lights for the parking lot and exterior building lights are shown on the
plan drawing and also, product information sheets for the light fixtures are attached.
3. The parking plan for the trailer complex.
4. Photos of the trailers. One photo shows a single trailer module and the other photo
shows an example of how the complex will look. (The example includes 17 trailers,
our plan includes only 9 trailers)
5. E -mail from the city of Bayport indicating that the connection of the trailers to the
sewer system is acceptable.
6. The original March 17 letter which submitted the Development Application. The
attached drawings supercede the previously submitted General Plan drawing.
We trust that these documents satisfactorily complete our application and look forward to
meeting with you on April 21 at 10:00 AM at City Hall. We hope that our plan meets with
your approval so that we can begin installation of the trailers on or before June 1, 2004.
Should you require further clarification, please do not hesitate to contact me at (763) 370-
12J6.
Thank you for your assistance.
Sincerely,
Russell Girtz
Engineering Manager
King Rehabilitation Project
...........
-,y
•5 �
t. S
F ✓fi
'yam " �1y' - � -- ti,'`�.r,:•.Y; s; ��.�,.:Yw;� ' "..
s.• , ...fie;^ {t
7 ryC. racy
r '•�L'�- , " ` lj� ^ `SC.�,'•�h y nZcr . \ jam;` te n, �.F
earn• at 3
-'v
S.
4�
•
r
J
L
sc r.�•.... �a.
...... ....
. . .........
K in, ".' .
s i.
.. . . ......
.. . . ...... ......
. .................... .
Girtz, Russell
From: Mike McGuire [mmcguire a@ci.bayport.mn.us]
Sent: Friday, April 09, 2004 11:33 AM
To: Knutson, Darrell G; Mike McGuire
Cc: Elsner, Ronald W; Girtz, Russell; Miser, Michael S
Subject: RE: Bayport Sewer Connection
Darrell, your proposal to increase flow for four additional bathrooms
into the Bayport sewer is acceptable . Mike McGuire
- ---- Original Message
Knutson, Darrell G Lm lto�rll
Sent: Thursday, April 08, 2004 12:35 PM
To: Mike McGuire
Cc: Elsner, Ronald W; Girtz, Russell; Miser, Michael S; Knutson, Darrell
G
Subject: Bayport Sewer Connection
Dear Mike,
Thank you for your time on the phone today. This is a follow up to our
conversation. Xcel Energy, King plant, in re-- powering the facility,
will be installing a temporary administration /engineering building. The
structure will be located between the existing guard house and the
existing substation. The structure will be comprised of portable,
interlocking, construction -type trailer, office space units. This
enclosure will house four (4) additional restrooms. No structural
changes will physically occur with regard to the Bayport sanitary sewer system. The
administration building sewer outlet connection will connect to the existing lift station at King,
which outflows into the Bayport sanitary system. This building unit will remain on site through the
entire M ERP project, approximately 2007, year end.
We need to document your being notified and our receiving consent for this additional usage in
our documentation preparation for the building permit, through oak Park Heights, MN. The
permit process and inspections will be administered through oak Park Heights, the site's LGU.
After discussing this with your staff, if you find this acceptable, would you please respond
indicating your position. If there are any questions or concerns, please contact me.
Sincerely,
Darrell G. Knutson
651 -731 -5751 off ice
612.510 -2374 pager
Capabi ity Green, Luton
o Zero upward light
'Dark Sky' compliance
• Easy access to lamp and control gear
Simple maintenance
Choice of mounting systems
Design flexibility
1P655
Fully weather sealed
CE
Somerset is a cutoff luminaire for areas requiring a moderate forward throw of light
coupled with a more demanding sideways distribution. With the control of light pollution
in mind, Somerset has a 'flat glass, cut -off' housing that ensures all upward light from
the luminaire is eliminated.
Moreover, the prismatic lens ensures complete lamp obscuration and optimum visual
comfort. Designed for simple maintenance, Somerset also has quick release fasteners
and a fully hinged door to allow ease of access.
Features and Benefits Lamp Types (included)
A Classic low profile styling 190W - 400W
Blends in with surrounding architecture metal halide (various)
o Precise light control ° 160W - 400W
Maximum efficiency & low glare high pressure sodium
I P iR i t l l) 3 o
1 P65 5
Approvals
is
A Designed to EN60598 -2 -3
M .
OV
_
IS
M A L
R
�"i� g i ovi
' ' �, �, &_ - 'N
- Q -
P,
m
4
�' I
E",
M."... ........
M . ,
V
Ell
_S J:
M
K_
M.-SWRE; ROY
-I .. ..... ..
T'.
-W Lm z
%
1 rm Z ,_
KO
% P
. .. .......
im
I ..... .....
...........
..... ........
INJ lz
14;
. .. ..........
... .. ...... .
(1)
E
0
Light Distribution
Spec
The luminaire shall consist of a rectangular fabricated steel, seam welded body
which shall incorporate a removable gear tray secured in position by a single
retaining wing nut and be suitable for a wide choice of high intensity discharge
lamps. The hinged aluminium die -cast doorframe shall be held in place by two
rotary fasteners. The optical assembly shall consist of a specular hydro - formed
aluminium reflector complete with a road -side positioned lampholder, and be
secured to the doorframe enabling easy access to the geartray. A moulded
prismatic borosilicate refractor shall be gasket sealed to the doorframe ensuring an
IP rating of 655. The luminaire shall be designed to EN60598 -2 -3 with a range of
bracketry and columns to suit. Additional options and accessories are also available.
Photometric data is available on the
Holophane cd-rom or at www.holophane,eu,com
Weight
Thermal Data
Optional
photoce I
Lamp Type Weight (kg) Minimum Operating Maximum Ambient
Temperature (C) Temperature CC)
100W High Pressure Sodium 18.0 -3D 65
150W High Pressure Sodium 19.0 -30 50
250W High Pressure Sodium 20.0 -30 45
400W High Pressure Sodium 21.0 -30 35
100W Metal Halide 18.0 -20 65
150W Metal Halide 19.0 -20 50
250W Metal Halide 20.0 -20 45
400W Metal Halide 21.0 -20 35
The maximum ambient temperatures stated are for exterior use only.
For interior use deduct 10 *C from the temperature stated as per EN60598 -2 -3
a
Dimensions (r
windage
Code
Somerset 0.12m
Bracket Details
Dimensions 0-rim)
725 Maximum
680 Minimum'
Single & Twin Head
(Plan View)
7 3 Q
SOM1 .WB
Wall Mount Bracket
*Overall size variable dependent upon spigot size.
All bracket combinations are supplied complete with suitable fixing kits.
4 off Holes 0 10
amenity
il Lk,
(c)
0
v,
CD
1 1
Wallpack is a highly effective solution where vandalism, crime or dark, shadowy areas
have presented a problem. A rugged, wall- mounted luminaire with a reputation for
reliability and durability, Wallpack provides economical illumination for medium -sized
areas at mounting heights of 5 metres and above.
The prismatic optic provides uniform surface brightness whilst directing the maximum
quantity of fight downwards, forwards and sideways. This makes it possible to use wider
spacings than is possible with conventional luminaires, and also achieves a high
uniform horizontal illuminance.
Features and Benefits
• Rugged construction
Durability
& Prismatic P erformance
r
efficiency l glare
Maximum e c e c& low a e
•ve ;` or 'Cf:1 Wire uard option
g P
Increased vandal resistance
Larro Types pes (included
• 250W metal halide (various)
• 100W 00 25DW
high pressure sodium
• 250W mercury
• 5001>EI tungsten halogen
n halo
9 9
I P Rating
IP65 7 4\
Approvals
Designed to EN60598 -2 -3
• CE
• 07
NEMKO
Chungwa, Ho':ytowi, 5cot':and
amenity
0
ccfl
C
Specification
The luminaire shall consist of a two piece die -cast aluminium body, housing
integral control gear to suit a wide choice of high intensity discharge lamps.
The optical assembly shall consist of a precisely contoured aluminium reflector
and a moulded borosilicate prismatic glass refractor sealed in position with a
high temperature sealant. The luminaire shall have a detachable halfhinged
door secured to the back casting by two captive stainless steel screws located
on the bottom face exerting uniform pressure on the gasket, ensuring 1P65 is
maintained. The luminaire is suitable for pole or wall mount and shall be
approved to EN60598-2-3 with a wide choice of options and accessories.
Li'ghw Distribution
Photometric data is available on the
Holophane cd -rom or at www.holophane.eu,com
Weights .s & l hernia.: Data
a,J
Lamp Type Weight Minimum Operating Maximum Ambient
(kg) Temperature CC) Temperature* CC)
100W High Pressure Sodium 12.5 -30 50
1501 High Pressure Sodium 13.5 -30 50
2501 High Pressure Sodium 14.5 -30 35
250W Mercury 13.5 -18 25
250W Metal Halide 14.5 -20 35
500W Tungsten Halogen 11.5 nia 30
* The maximum ambient temperatures stated are for exterior use only.
For interior use deduct 10 °C from the temperature stated as per FN60598 -2 -3.
Dimensions ' n 1 ro
255
197
0
432
I� Xcel Energy
March 17, 2004
Eric Johnson
City Administrator
Oak Park Heights, MN 55330
RE: King Plant Rehabilitation Project
Admin Trailer Complex Temporary Use Permit Application
Dear Mr. Johnson:
Attached is the initial submittal for a temporary Use Permit for installation of the Office Trailer
Complex to be used during execution of the King Plant Rehabilitation Project at the xcel
Energy Alien S. King Plant.
The plan is to arrange the 9 trailer modules as shown on the Plan drawing and to locate the
trailers as shown on the Utilities Plan drawings. The trailer will be connected to existing plant
water, electricity and sewer system as indicated on the Utility Plan drawing.
Thank you for your assistance in mowing this application through your processes as soon as
possible.
on Elsner
Project Manager
Attachments
•r
CITY OF OAK PARK HEIGHTS + DEVELOPMENT APPLICATION
14168 Oak Park Boulevard
P.O. Box 2007
Oak Park Heights, MN 55082
439 -4439 Fax: (651) 439 -0574
Street Location of Property / 4w4 _ 9- ak /� �rk /-417A f �N
Legal Description of Property ;Mee, /%4/4
Owner: Name e
Address: "/I
City: rni dies
r!' 14 ■*
m rehensive Plan Am�ndmen
Description of Request(s):
Owner/Applicant Initials
/4,
Base Fee:
Escrow Amount:
e-7-4 c 7 ik /547-ey C9
State: Mil Zip: S
Telephone: (Home) (business)
(Fax) (Other)
Applicant:
Address: � 1nb/e FJ
City: new (i.s State: 1✓ Zip: -2---
Telephone: (Home) (Business) 6/oz - 3,50 /„2_
(Other)
(Fax)
Type of Request(s)
Zoning District Amendment
.Conditional Use Permit
Variance: Single Family Residential
Variance: Other Residential /Commercial /Industria
Subdivision
Subdivisi
Home Occupation
eview
rent
PUD Concept Plan
i~PUD: General Plan
Street Vacation
City '`Financial Assistance
PUCE: A
If a request for planning /zoning action on the subject site or any part thereof has been
previously approved, please describe it below:
Development Application, Page 2
Application Review
The undersigned acknowledges that before this request can be considered and/or approved, all
required information and fees, including any deposits, must be paid to the City. An incomplete
application will be returned to the applicant. The application approval proces:cdmrriences and
an application is considered complete when all required informtiori and fees are submitted
appropriately to the City.
Professional Fee Responsibility
It is the understanding of the undersigned that all City incurred professional fees and expenses
associated with the processing of this request(s) will be promptly paid upon receipt. If payment
is not received from the applicant, the property owner acknowledges and agrees to be
responsible for the unpaid fee balance either by direct payment or a special assessment
against the property.
Applicants will be billed on a monthly basis for Planning, Engineering, Legal and Community
Development fees as they are accrued. Failure to pay administrative and processing fees in a
timely manner may result in denial of the application. All fees must be paid at the time of
application and shall be paid prior to the issuance of a building permit
The undersigned applicant further acknowledges and consents that all unpaid fees owing the
City of Oak Park Heights shall be treated as unpaid utility fees and may be cerlified for
collection as with delingLient utility billind's and may be assessed against the subject real
property if unpaid by October 31 Pt • of each year.
Property Address
General Conditions
pplicant Signature
ck114 f/Oe-e R‘-
,
• r
Date:
Date: