Loading...
HomeMy WebLinkAbout06-17-19 Parks Packet CITY OF OAK PARK HEIGHTS 4k PARKS COMMISSION MEETING AGENDA MONDAY, JUNE 17, 2019 6:00 PM.- Park Walkthrough Start at Cover Park 7:00 PM.- Parks Commission meeting City Hall L Call to Order IL Approval of Agenda III. Approve Parks Commission Minutes —May 20, 2019 (1) IV. Department/Commission Liaison Reports A. Arborist B. Public Works Director C. Other/ Commission Liaison Report V. Visitors/Public Comment This is an opportunity for the public to address the Commission with questions or concerns not on the agenda. Please limit comments to three minutes. A. Summer 2019 Monarch Butterfly Conservation Project—Presentation by Kimberly Faurot VI. Public Hearing None VII. Old Business A. Drinking Fountains (2) VIII. New Business None IX. Informational A. Next Meeting: Monday, July 15 at 6:00 p.m. at City Hall B. Upcoming Council Meeting: Tuesday, June 25 at 6:00 p.m. at City Hall X. Adjourn THIS PAGE INTENTIONALLY LEFT BLANK 1 CITY OF OAK PARK HEIGHTS PARKS COMMISSION MEETING MINUTES Monday, May 20, 2019 at City Hall I. Call to Order: Chair Weyer called the meeting to order at 7:00 p.m. Present: Vice Chair Chirhart, Commissioner Bye, Commissioner Peterson, and Commission Thoreson; City Administrator Johnson, Public Works Director Kegley, Arborist Danielson, and Commission Liaison Johnson. Absent: None. II. Approval of Agenda: Commissioner Peterson, seconded by Commission Bye, moved to approve the Agenda. Carried 5-0. III. Approve Parks Commission Minutes—April 15, 2019: Vice Chair Chirhart, seconded by Commissioner Thoreson, moved to approve the Minutes. Carried 5-0. IV. Department/Commission Liaison Reports: A. Arborist: Arborist Danielson reported that the City held the Ceremonial Tree Planting prior to that evening's meeting as part of the Tree City USA requirements. She said it was a Northern Pin Oak planted at Autumn Hills Park. She also reported that Minnesota Native Landscapes conducted the spring mows behind City Hall and at Valley View Park. B. Public Works Director: Public Works Director Kegley reported that the park shelters were opened and staffed. He said that staff was retrofitting fixtures with LED bulbs at the park shelters. C. Other/ Commission Liaison Reports: Commission Liaison Johnson reported that Xcel Energy released information on the closure date of 2028. She said it was not concluded how the City would proceed, but it was on their radar. She also reported that Party in the Park was coming up in the beginning of June. V. Visitor/Public Comment: None VI. Public Hearings: None VII. Old Business: A. Lookout Tower—Oak Park Crossing Park: The Parks Commission reviewed images provided in the meeting packet. Commissioner Peterson said he could not support moving forward with the project as it felt incomplete. Commissioner Bye felt the stairs would be a fitness draw and could be part of a series of fitness stations that may be added in the future. Vice Chair Chirhart thought the structure did not fit the purpose of a lookout because there were a limited number of people that could be at the top at a time, but may be useful if it were part of a group of fitness stations. Parks Commission Minutes May 20, 2019 Page 2 of 3 Commissioner Thoreson felt the structure was unique and would be a draw for people to visit the area, but he felt it was quite expensive and wanted to hear from the Commissioners what other ideas they had for that site with those funds. Chair Weyer reported that he showed the pictures to people, and everybody thought it was a neat idea. He also agreed it was a lot of money for what it was. He suggested sending the idea to the City Council for their feedback. Chair Weyer, seconded by Commission Thoreson, moved to send the idea to the City Council to get their opinion. Carried 4-1, Peterson opposed. Commissioner Peterson suggested the Parks Commission discuss a strategic plan or vision for Oak Park Crossing Park at a future meeting or worksession. B. Oak Park Crossing Park Stair Addition Project: Public Works Director Kegley reported that staff reviewed the idea of adding approximately ten steps in a sloped area by the Beach Road Bridge, and they thought it was a good idea. He said it would be approximately $2,000. Kegley said he reached out to Chuck Donkers at Xcel Energy and was awaiting feedback. The Parks Commission supported the idea. Commissioner Peterson, seconded by Vice Chair Chirhart, to move forward with the stairs at Oak Park Crossing Park. Carried 5-0. C. Drinking Fountain Installation: Public Works Director Kegley reported the City received one quote for drinking fountains from Miller Excavating in the amount of $19,970.20 for install at Swager Park and $29,906.45 at Oak Park Crossing Park. He said he spoke with Chuck Donkers at Xcel Energy who said it would not be an issue to install a drinking fountain at Oak Park Crossing Park, but the City would need to secure an easement for the water line from Phil's Tara Hideaway. Commissioner Bye, seconded by Commissioner Thoreson, moved to recommend the drinking fountains at Swager Park and Oak Park Crossing Park. Carried 5-0. City Administrator Johnson reported staff would bring it to the City Council. VIII. New Business: None IX. Informational: A. Park Walkthrough: Monday, June 17 at 6:00 p.m. beginning at Cover Park B. Regular Meeting: Monday, June 17 at 7:00 p.m. at City Hall C. Upcoming Council Meeting: Tuesday, May 28 at 6:00 p.m. at City Hall D. Party in the Park: Thursday, June 6 at Brekke Park Parks Commission Minutes May 20, 2019 Page 3 of 3 X. Adjourn: Commissioner Thoreson, seconded by Commissioner Bye, moved to adjourn the meeting. Carried 5-0. Respectfully submitted, Jennifer Pinski City Clerk THIS PAGE INTENTIONALLY LEFT BLANK 2 it City of Oak Park Heights 14168 Oak Park Blvd Me Oak Park Heights,MN 55082•Phone(651)439-4439+ Fax 439-0574 Memorandum To: Eric Johnson, Administrator Cc: Park Commission From: Andrew Kegley, Public Works Director Date: 06/12/2019 Re: Alternate Drinking Fountain Options As reported, the City Council requested staff research less expensive alternatives to install drinking fountains in Swager and Oak Park Crossing Parks. Regardless of options, water services will need to be installed at both parks if there is to be drinking fountains. A contractor will install a 1" copper pipe and curb stop valves to allow for winterization from the water main to the right of way at Swager Park and beyond the asphalt trail at Oak Park Crossing Park. Asphalt and site restoration is included in the quote to install water services. City staff would complete the project by installing plastic potable water pipe from the copper stubs to the drinking fountain locations. Since the drinking fountains need to be winterized, there is no need to bury the water pipe to the standard 7.5 -S feet depth, therefore staff can trench the pipe just below grade. There are two safe options to achieve the goal of installing drinking fountains. The options are as follows: Alternative 1 City staff will extend the water pipe to the drinking fountain locations, install concrete pads and purchase 440SM (surface mount) fountains with pet drinking bowls attached from a local vendor. The cost to complete this project is estimated to be: Unit Materials and Supplies Price Qty Sub Total Water Service @ Swager w/Valves $11,430.15 Water Service @ OPCP w/Valves $9,005.80 Poly pipe(Potable) $0.47 500.00 $235.00 Pipe compression Fittings $20.00 4.00 $80.00 440SM Drinking Fountain $3,732.50 2.00 $7,465.00 Vibratory Plow Rental $285.00 2.00 $570.00 Concrete/Trailer rental $275.00 1.00 $275.00 Estimated Total $29,060.95 Alternative 2 City staff will extend the water pipe to the drinking fountain locations, install concrete pads and a post or pipe at the fountain site.The water service will junction to ridged galvanized iron pipe and be affixed to the posts and a drinking fountain head and spigot will be installed to the pipe. See the attached photo of a drinking fountain in Bayport;this option would look similar and be considerably less expensive than the original quote.The cost to install water spigots in this manner is estimated to be: Unit Materials and Supplies Price Qty Sub Total Water Service @ Swager w/Valves $11,430.15 Water Service @ OPCP w/Valves $9,005.80 Poly pipe(Potable) $0.47 500.00 $235.00 Galvanized Pipe $8.39 1.00 $8.39 Pipe compression Fittings $20.00 4.00 $80.00 Drinking Fountain Head $55.00 2.00 $110.00 Vibratory Plow Rental $285.00 2.00 $570.00 Concrete/Trailer rental $275.00 1.00 $275.00 Estimated Total $21,714.34 2 Andrew Kegley From: Steve St. Claire <steve.st.claire@millerexc.com> Sent: Wednesday, June 12, 2019 8:16 AM To: Andrew Kegley Cc: office@millerexc.com Subject: Drininkg Fountain Stub In Andy, Dringing Fountain Stub In Pricing SWAGER PARK Traffic Control -Street Remove Pavement & Curb Connect to Watermain 1" Copper Main to Curbstop 1" Curbstop w/ Blow Off&Tail to Grade Street Restoration—Sand, Aggregate Base, Curb Patch & Bituminous Paving Seeding ESTIMATED TOTAL$ 11,430.15 OAK PARK CROSSING Traffic Control -Trail Remove Trail Pavement Connect to Watermain 1" Copper Main to Curbstop 1" Curbstop w/ Blow Off&Tail to Grade Bike Trail Paving Restoration—Aggregate base & bituminous paving Seeding ESTIMATED TOTAL$ 9,005.80 Steve St. Claire President I Miller Excavating, Inc. 3741 Stagecoach Trail North I Stillwater, MN 55082 651.439.1637 Office 1651.269.8176 Mobile 651.351.7210 Fax steve.st.claire@millerexc.com I Email i I 1 The content of this email is the confidential property of Miller Excavating,Inc.and should not be copied,modified,retransmitted,or used for any purpose except with Miller Excavating,Inc's written authorization.if you are not the intended recipient,please delete all copies and notify us immediately. 2 St.Croix Recreation Fun Playgrounds INC. �J.a 1826 Tower Dr W Stillwater, MN 55082 US 1 651 4301 247 hannah@stcroixrec.com RECREATION funPlaIgrounds rom ESTIMATE ESTIMATE# 3709 DATE 06/10/2019 ADDRESS SHIP TO City of Oak Park Heights Oak Park Heights City Hall Accounts Payable Attn:Andy 14168 Oak Park Blvd 14168 Oak Park Blvd North Oak Park Heights,MN 55082 Oak Park Heights,MN 55082 651.775.5759 PLEASE DETACH TOP PORTION AND RETURN WITH YOUR PAYMENT. ------ ---------- ----- ----_..........------. ----............--- --...........---------- ------------------. ..._..---------------------- -----..................... I71VIT1l _ _ Q1 Yr RATB AMOUMi MDF 4408M 2 2,445.00 4,890.00T DUAL DRINKING FOUNTAIN SURFACE MOUNT-Color Green MDF CARRIER 2 245.00 490.00T SURFACE MOUNT CARRIER STAINLESS STEEL MDF PET FOUNTAIN 2 855.00 1,710.00T Pet Fountain MDF CUT OFF VALVE 0 0.00 O.00T WITH LOW POINT DRAIN (Optional.$65 per each fountain) Freight 1 375.00 375.00T Carrier to be shipped prior/separately .................... . ................................ ------------ ............... ...- -------- ----- ---------------- ------------------ QUOTES --- ------ ---- QUOTES ARE EFFECTIVE FOR 30 DAYS. SUBTOTAL 7,465.00 SALES TAX SUBJECT TO CHANGE.ADD IF NOT EXEMPT OR SUPPLY TAX(0%) 0.00 EXEMPTION CERTIFICATE IF NOT ON FILE(ANNUALLY). TOTAL $7 465.00 PAYMENT TERMS ARE NET 30 DAYS UNLESS OTHERWISE NOTED. FAILURE TO PAY IN A TIMELY MANNER MAY INCUR INTEREST. Accepted By Accepted Date Most Dependable Fountains, Inc. OPERATIONS MANUAL MODELS : 440 SM & 440 SMSS with Pet Fountain Most Dependable Fountains, IncTM 5705 Commander Drive Arlington, TN 38002 800-552-6331 www.mostdependable.com MOST DEPENDABLE FOUNTAINS, INC. 5705 COMMANDER DR. P.O.BOX 587 ARLINGTON,TN 38002-0587 MDF TOLL FREE: 1-800-552-6331 M� oePeHtaas�e PHONE: (901)867-0039 FOUNTAINS, mo. FAX: (901) 867-0159 www.mostdependable.com D zo Et� II 1 112'PVC 18' II II F- 318"NYLON REINFORCED II v ULi NYLONBRAID TUBING Wl 114'MIP II 8112• (WATER SUPPLY) II I�'I N 4-STAINLESS STEEL ACCESS 114-20 SS TORX ,� DOOR BOLT Wl PIN BY OTHERS ATTACHED PET FOUNDATION OPTIONAL INTERNAL ON OPPOSITE SIDE AS `a SURFACE CARRIER II SHOWN BELOW(TOP VIEW) '�''. .F•rf t+n�.ri4•- ate.• i._ �•.:.�•'.�ai J• :�i.a M1. � ► .i., . z'C:•t3 •.;.., Y i• k .o furl;.:•• •....:F S�r:+'f•.' Zr b. .},u r :+i�T•�,;..� 'a"'. ,•`:r. :'l•-�i1':..•{'��. '.y h•%{:.:.'•J�-»5:��'i �;��•«r�r:,4�:�t:t:i.'--•ari'b••::3 +::i:i �v.-.i?•:af"!tee .t.i'1;;• iii.::• a` :P:Y:�.•i".. 112'X 12'DNC 2',3',OR 4'OPEN HUB DRAIN IF PLATED ROD POSSIBLE OR RIGID CONNECTION PET FOUNTAIN 0 p O WATER p 2',3'OR 4'OPEN HUB DRAIN TOP VIEW NOTES: 1. MEETS ADA REGULATIONS. 2. OPTIONAL STAINLESS STEEL SURFACE CARRIER RECOMMENDED. 3. SHOWN WITH OPTIONAL 10 STAINLESS STEEL SURFACE CARRIER,ATTACHED PET FOUNTAIN. 4. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 5. DO NOT SCALE DRAWING. 6, THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS,ENGINEERS,CONTRACTORS,CONSULTANTS AND DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 7. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 8. CONTRACTOR'S NOTE:FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.comfint AND ENTER REFERENCE NUMBER 3354-1.51, MODEL 440 SM SHOWN W1 OPTIONAL SS SURFACE CARRIER,PF 3354-1.51 REVISION DATE 07/2012016 PROTECTED BY COPYRIGHT 020116 CADDETAILS.COM LTD. CADdetails.com In 3My ORIGINAL SERIES DRINKING FOUNTAIN SPECIFICATIONS r , Section 9,California Proposition 6 and the Federal Safe Drinking Water Act. 0117J.11111 r , One piece weld construction with MDF standard 3/16"wall thickness. r One piece weld construction with MDF standard 304 schedule 10 stainless steel. 18 gauge electro-polished stainless steel bowl. Bowl overlaps pedestal,preventing build-up of residue in visual drinking area. Optional stainless steel Bowl Strainer recommended for areas with sand. Stainless steel anti-squirt head (weighing a pound and a half) mounted with a lock nut and washer to prevent tampering. Lock nut pin holds bubbler in locked position to prevent twisting or turning. The MDF bubbler head has a unique design that features a steady stream trajectory and a built in natural shield from contamination. 304 stainless steel with circumference exceeding 8.6' Mushroom style push bar overlaps and prevents sand and other objects from sticking push bar in the ON position. Stainless steel bubbler housing standard. r r Self closing valve requires less than 5 lbs to operate. Non-cartridge O-ring valve delivers steady stream of water through an adjustable valve. This valve design is to operate and function at 30 to 80 PSI. Ideal operating pressure is 60 PSI. i Maintenance free reinforced nylobraid tubing-this tubing is not plastic. It is supplied with a 1/2"MIP threaded inlet with stainless steel strainer. Union fittings at every connection. Supply line stops above grade. - 1 1/2"schedule 40 PVC pipe. Drain line stops above grade. Oven baked powder coat. Choice of colors are:❑green,❑blue,❑black,❑brown, 0 red,0 yellow,0 orange,and 0 white. Textured color choices:❑emerald, 0 sapphire,0 pyrite,0 text-black,0 burgundy,0 gold vein,❑copper and 0 sandstone. Stainless steel models are powder coated for added protection. The color 0 chrome is available for stainless steel models only. Working parts accessible through bowl of fountain for easy service. Supply and waste connections are through the above grade access door. All access plates, brackets,vandal resistant bolts and screws are stainless steel. r Surface Mount installation,is designed to be anchored on top of an existing surface(concrete,etc.)with anchor bolts through a mounting plate that is welded to the fountain. Surface Mount Fountains provide an access door with vandal resistant stainless steel screws. Surface mount carrier recommended for all surface mount installations. Access door standard on all pedestal fountains. r Shut off water and drain down. One year warranty, labor not included. Model 400 SM..........115 lbs Model 400 SMSS...... 115 lbs *Meets ADA for Nigh and Low Model 410 SM..........110 lbs Model 410 SMSS...... 110 lbs Model 440 SM*....... 130 lbs Model 440 SMSS*.... 130 lbs Model 493 SMSS*.. 170 lbs Model 493 SMSS*.... 170 lbs MOST DEPENDABLE FOUNTAINS, INC.'" AsSIF76 (800)552-6331 •(901)867-0039•Fax(901)867-4008 5705 COMMANDER DR.•ARLINGTON,TN 38002-0587 U L www.mostdependab]e.com LEAD FREE INSTALLATION INSTRUCTIONS Most Dependable Fountains, Inc. ` All SM (surface mount) products are designed to be installed on the surface of a new or existing concrete slab. Your contractor needs to provide a 1 1/2" PVC drain line (when applicable) and water line thru finish grade. Connections are made to our SM products thru our access door, as shown on detail drawings. The water tubing is provided with a 1/2" male iron pipe connection. This is an excellent location for a cutoff valve. Surface Mount units are anchored to the existing concrete by means of 1/2" concrete shields with bolts or we recommend 1/2" quick bolts. Note: We offer an o tional template which is designed to be poured in the concrete slab. It comes with the necessary vandal resist stainless steel bolts and washers need to anchor. All DB (direct bury) products are designed to be installed to a depth of 14" below grade. MDF provides 1 1/2" PVC drain line inside the pedestal (when applicable) to point of connection by others. MDF also provides reinforced nylobraid flexible tubing with a 1/2" male iron pipe thread for connection to water supply by others. MDF recommends an optional valve box using a PVC conduit to the pedestal. By using this option you have complete control of your product. Individual detail drawings available Online or by request. For more information: Most Dependable Fountains, Inc. ` )c www.mostdependable.com Info@mostdependable.com MOST DEPENDABLE 800-552-6331 FOUNTAINS, INC. 901-867-0039 LIMITED PRODUCT WARRANTY Most Dependable Fountains, Inc. ` Most Dependable Fountains, Inc. ` warrants that all of its products are guaranteed against defective material or poor workmanship for a period of one year from date of shipment. Most Dependable Fountains, Inc.' liability under this warranty shall be discharged by furnishing without charge any goods, or part thereof, which shall appear to the Company upon inspection to be of defective material or not of first class workmanship. Most Dependable Fountains, Inc. " will not be liable for the cost of repairs, alterations or replacements, or for any expense connected therewith made by the owner or his agents. Most Dependable Fountains, Inc. " will not be liable for any damages caused by defective materials or poor workmanship, except for replacements, as provided above. Buyer agrees that Most Dependable Fountains, Inc. " has made no other warranties either expressed or implied in addition to those above stated. The products manufactured by Most Dependable Fountains, Inc.' is warranted to function if installation and maintenance instructions provided are adhered to. The units also must be used for the purpose for which they were intended. t3M:F MOST DEPENDABLE FOUNTAINS, INC. » +e w �. .. , .�w T, Yom. '4 t�. .. ;�'' •'� n:,:�u�+'�i�.' LX ti. ✓'�1 Z-°4i ✓ 'y, Alr .41 -�.. t� s .� `a'. Mr cr✓���� i "� ,� ?M:�}I n �"f - � �7C"���3 ,t�". T -fir F;'•� 7 !Yr �. .Y: d R 1 1 443> . s � 1 s S P } T,d ys 1 4 e!. y.A t ' �� ML i 0 f¢/ L; ��•y�_ � ��t.� ,r�' �L�,�l) }� i "'�' N � :LCL ���, '�,� 1 � d.L� + 11 City of oak Park Heights 14168 Oak Perk Bled N..Oak Park Flci,ht�, MN 55082 •Phone(65 1)439-4439 .Fax 439-0574 Memorandum ORIGINAL To: Eric Johnson, Administrator Cc: Park Commission From: Andrew Kegley, Public Works Director Date: 05/15/2019 Re: Drinking Fountain Installation The City only received one returned quote to install water service lines and drinking fountains in Swager Park and Oak Park Crossing Park. Two other parties gave notice that they were not interested in the work do to other commitments, and a third local contractor has met staff on both sites to better understand the scope of the project, but has not yet submitted a quote. His work load is extensive and schedule is tight due to the wet spring. Miller Excavating proposes the following: Install a drinking fountain at Swager: $19,970.20 Install a drinking fountain at Oak Park Crossing Park: Total to install both _ $49,876.65 Note: There is a sixty (60) day lead time on the drinking fountains from the manufacturer. Chuck bonkers of Xcel Energy did indicate that installing a water line as shown on the attached map should not be a problem as there is ample land cover over the cap in the proposed area. If the City Council approves the project, The City would need to secure an easement for the water line from Barbatsis Property LLC—this is Phil's Terra Hideaway, before work could begin. Installing the drinking fountain at Swager does not have this challenge; after Council approval, the contractor could start upon a notice to proceed from the City. THIS PAGE INTENTIONALLY LEFT BLANK