- ---- CITY OF OAK PARK HEIGH_T_S_DEVELOPMENT APPLICATION
14168 Oak Park Boulevard
P.O. Box 2007 Base Fee:
Oak Park Hei MN 55082 Escrow Amount: o �5 2,
( 651) 439-4439 Fax., ( 651 ) 439-0574
Street Location of Property_..... - Southwest Q uandrant -Hwv 36/Beach Road Intersection
Le Description of Property 43 acres NE : 1 % NW! Section
_3 t29N-920W
Owner: Name Ro Clarke
Address: 414 Nicollet all MP8A
cit Minneapolis State: MN
Zip: 5 540 1
Telephone: (Home) (Business)
612-330-6989
N 612-330-6357
(Fax) ( 0 ther)
Applicant: Name Manuel Castillo
Address: 414 Nicollet Mall MP8A
clt M i n n e a p o l i s State'. MN
Zip- 55401
Telephone: (Home) (Business)612-330-6506 .,.,_
(Fax) 612-330-6357 - other}
T of Re
Zonin District Amendment Ak)
C(Ab-r'�-r
Conditional Use Permit 4r"
Home Occupation
Site Plan Review
Variance-, Sin Famil Residential
PUD- Amendment
— Variance-, Other Residential/Comniercial/industriaI
PUD. Concept Plan
Subdivision
PUD-. General Plan
Subdivision-, Minor
-Stf-eet Vacation .
Comprehensive Plan Amendment
Cit Financial Assistance
Description of Re
Vertical exDansion of the Kin Ash Dis-,00sal Facilit
If a re for plannin action on the subject site or an part thereof has been
previousl approved, please describe it below:
Owner/Applicant Initials
X Y
IV.,.100
k
Development Application, Page 2
General Conditions
Application Review
The undersigned acknowledges that before this request can be considered and/or approved, all
required information and fees, including any deposits, must be paid to the City. An incomplete
application will be returned to the applicant. The application approval process commences and
an application is considered complete when all required information and fees are submitted
appropriately to the City.
Professional Fee Responsibility
It is the understanding of the undersigned that all City incurred professional fees and expenses
associated with the processing of this request(s) will be promptly paid upon receipt. If payment
is not received from the applicant, the property owner acknowledges and agrees to be
responsible for the unpaid fee balance either by direct payment or a special assessment
against the property.
Applicants will be billed on a monthly basis for Planning, Engineering, Legal and Community
Development fees as they are accrued. It is understood that interest will be charged on the
account at the maximum rate allowed by the Fair Credit Act if it becomes thirty (3D) days past
due. Failure to pay administrative and processing fees in a timely manner may result in denial
of the application. All fees must be paid at the time of application and shall be paid prior to the
issLIance of a building permit.
The undersigned applicant further acknowledges and consents that all unpaid fees owing the
City of Oak Park Heights shall be treated as unpaid utility fees and may be ce ;lified for
collection as with delinquent utility billings and may be assessed against the subject real
property if unpaid by October 31 of each year.
Property Address So uthw est Qu Hwy 36 /Beach Road In
i9 Xcel Energy
June 5, 2008
Eric A. Johnson
Cit Administrator
14168 Oak Park Boulevard North
P.O. Box 2007
Oak Park Hei MN 55082
414 Nicollet Mall
Minneapolis, Minnesota 55401-1993
Re: Notification of Application for Re-Permittin Xeel Ener A.S. Kin Landfill
Permit # 54
Dear Mr. Johnson:
As per the Minnesota Pollution Control A (MPCA) permittin re under
Minnesota Rule 7035.1 Boo, Xcel Ener is hereb notif Washin Count that the
process of re a permit modification for the A.S. Kin Landfill has be The
application will be filed within da
In the meantime, if y ou have an q uestions concernin the re-permittin process, please call
me at ( 612 ) 330-6506.
Sincerel
Joao
Manuel Castillo
Sr. Environmental Anal
Robert Criswell
Ro Clarke
Scott Thomas
Tom Smith
John McCain
ES Record Center
MPCA
MP8
MPS
Kin Plant
McCain and Associates
A. S. King Plant
A.S. Kilr%IVjN Ash Disposal
MPCA Permit No. SW,=54
June 10, 2001
Wjol 1=1 HT MI-JR-1
A vertical expansion is proposed for the A. S. Kin Ash Disposal Facilit ( Kin g ADF
MPCA Permit No. SW-54. Xcel Ener had planned to place a new ash disposal facilit
into service to replace the existin Kin ADF prior to reachin full capacit A new law
has placed a moratorium on permittin for new landfills until the MPCA conducts
rulemakin to address landfill sitin The proposed vertical expansion of the Kin ADF
will provide additional time for Xcel Ener to evaluate options for on- ash disposal
while the rulemakin process is conducted.
Xcel Ener has submitted a detailed Solid Waste Permit Modification to the MPCA for
their review and the cit will receive a cop of this document.
2.0 Pro Description
The expansion includes a 7.9-acre ash footprint located entirel within the 46-acre
permitted landfill area. The expansion will be developed with a combination of 3H:1V
and 3%-5% slopes to a peak elevation of 877.4 ft MSL. The expansion will provide
219,499 CY of total new airspace, includin new liner sub perimeter berms, ash,
final cover, and surface g radin g west of the expansion to improve draina The
finished g radin g plan is shown in Fi 1.
The final cover g rades were previousl permitted to a peak elevation of 847.5 ft MSL.
This hei limitation was imposed to prevent overloadin an existin sanitar sewer
located beneath the site. The expansion fill plan is desi to maintain this same
hei limitation over the sewer.
All but 1.6 acres of the expansion ash footprint is located over existin lined areas of the
Kin ADF. Anew liner ( Phase V11 liner will be constructed for the 1.6-acre unlined
area. Portions of the expansion area have alread received final cover in which case
the cover will either be stripped or in one area abandoned in place prior to placin more
ash. New final cover will be placed over the entire expansion area and will be connected
to the existin final cover.
3.0 Facilit Development Plan
The expansion will be developed with a sin liner/perimeter berm construction event in
Summer 2009, which will prepare the site for the complete expansion. The development
of the new berms will necessitate the re-location of the walkin trail on the north side
Trail relocation will be done prior to berm construction to minimize impacts. It is
anticipated that final cover will also be constructed in 2009 to the I im its shown on the
Final Cover Phasin Plan in Fi 2. It is anticipated that the south portion of the
expansion area ( south of the existin sanitar sewer) will be filled first and be read to
receive final cover in 2010. The north portion of the expansion area is anticipated to be
filled b Februar 2011 and thus would be read to receive final cover in Summer 2011.
This se of development and closure is reflected in the Closure Phasin Plan in
Fi 2.
The proposed expansion will increase the permitted airspace of the King AD F by
219 CY. A breakdown of the materials types that comprise this airspace increase is
provided below:
Ash Fill: 206 CY
Soil Fill: 4 CY (subgrade preparation for Phase VII liner)
Soil Fill: 2,976 CY (drainage layer on Phase VII liner)
Soil Fill: 4 CY (grading unrest of expansion for drainage improvement)
Soil Fill: 1 G1( (final cover reconstruction
_ f
41QPU S&P *WA &Vl&9 `WM0 :01J
u4 IeWd : ARI Wd
1!3' Ri t i�d 1VYit PU l�kit '�r Y��t511 -d' !J94U I%d
V!d WWV BQQZW9 :Pqcld
� v
CU N
v
d
-
u
w
a.
!1J 04 M ■r
Cl)
of
m
0
e�
Lck
i
T o
Q
7.
LU
r
::••:
LL
Lr]
CL
z
W ��
_ •• �f"Wl ••: y ��i
3
.��
V
C3 . •_ . _ • •. E Ad
❑
w
in
w
CL
CL
0 /
C
w�
cu
w M)
■wM,G7a7,A
C
LLI
�
r
0
0.
co
CD
¢
.•
::•:a
nu
v
c.x
0
a
Me
° a
� � a
� � w
fiO 7 T
k g R tz
�Qf A
41QPU S&P *WA &Vl&9 `WM0 :01J
u4 IeWd : ARI Wd
1!3' Ri t i�d 1VYit PU l�kit '�r Y��t511 -d' !J94U I%d
V!d WWV BQQZW9 :Pqcld