MEMORANDUM
TO: Eric Johnson
FROM: Scott Richards
DATE: August 0, 2008
RE: Oak Park Heights — Revisions to MPCA Permit and Amended
Conditional Use Permit for Expansion of the A.S. Ding Ash
Disposal Facility
FILE NO: 798.02 — 08.00
As you are aware, Xcel Energy submitted a request for a 120 day extension of the
development timeline for the amended conditional use permit for expansions to the A.S.
King Ash Disposal Facility. The Planning Commission is currently in the process of
considering the request and the public hearing for the conditional use permit remains
open.
The application for the conditional use permit was received on June 0, 2008 and
deemed complete when the additional materials, as requested by the city, were
submitted by Xcel on June 25, 2008. On June 19, 2008, a letter was sent to Manuel
Castilla of Xcel increasing the 00 day review period of the city to 120 days. As a result,
the pertinent development timeline dates are as follows:
June 0, 2998: Application Submitted
June 19, 2998: Letter sent to Xcel Extending Timeline to 120 Days
June 25, 2998: Application Deemed complete
October 22, 2008: End of 120 Day Development Timeline
The City has until October 22, 2098 to make a final decision on the conditional use
permit for Xcel Energy. The Fetter received from Xcel requests to extend the timeline an
additional 120 days from October 22, 2008.
The city Council will consider this request from Xcel at their meeting on August 12,
2008. The city council can determine whether to make a decision on the conditional
use permit by October 22, 2008, or accept the additional extension time offered by Xcel.
Av..Cel Energy SM
414 Nicollet Mall
Minneapolis, Minnesota 55491 -1993
August 1, 2008
Eric A. Johnson
City Administrator
14168 oak Park Blvd N.
P.O. Box 2007
Oak Park Heights, MN 55082
Re: Xcel Energy's King Ash Disposal Facility
Request for Revised conditional Use Permit
Dear Mr Johnson:
Xcel Energy requests a 120 day extension on the city's decision to issue a revised CUP
for the subject facility. Xcel :Energy feels the time is necessary to properly address the
sewer line re- -route and solid waste permit issues stemming from the sewer line re-
route. The additional time is also needed to evaluate, develop and implement
responses to the issues raised at the 7131108 public meeting Xcel Energy hosted. If
you have any questions please call my cell phone, (612) 518 -6081.
Sincerely
Chuck D nkers
Project Manager
ES record Center
King Plant File
A
Memorandum Bonestroo
r
- - --_ -- 2335 Highway 3611
To: Dennis Postler Project: Xcel Energy Fly Ash Site Hate: 07.22.2008 St. Paul, MN 55113
From: Kim Hayden Client: City of Oak Park Heights Tel 651 - 636 -4600
Fax 651 -636 -1311
Re Sanitary Sewer Options File No 000055 - 08000-1 www.bonestroo.com
We have reviewed several options for the existing trunk sanitary sewer under the Xcel Energy
Fly Ash Site. This memo provides details on the various options and their related costs.
Option 1 includes the installation of gravity sanitary sewer around the north side of the existing
fly ash pit and force main from the south. Construction would include a 15 hp lift station to
pump flows from the south half of the City. Existing sanitary sewer and structures in the fly ash
pit would be abandoned. This option would provide the City with a new, reliable trunk sewer
line, but would also add the maintenance of a lift station. Preliminary layout of this option can
be seen in Figure 1 (attached).
Option 2 is for tunneling a new sewer line through the fly ash pit parallel to the existing pipe.
The advantage would be that a casing pipe would be installed around the carrier pipe, allowing
for easier repairs in the future if need be. The disadvantages are that jacking pits would be
installed at each end of the tunneling, and possibly interim manhole locations, which would
disturb a large area of the existing fill and lining of the fly ash pit. Also, means and methods of
tunneling through the sedimented fly ash would need to be explored further.
Option 3 includes costs for installation of a cured -in -place pipe lining in the existing trunk
sewer lines. CIPP lining is designed to act as stand -alone pipe. Lining the sewer does not
necessarily provide additional strength, but if the existing RCP sewer were to fail, the pipe
would gain the strength of the underlying CIPP. Pipe lining also slightly decreases the capacity
of the i e but CIPP lini would p rovide for a smoother flow than the existing RCP. Because
pp � g p g f
CIPP lining is typically used for pipe repair and rehabilitation, more research would be necessary
to determine the exact effect of lining a pipe that is currently in good condition if this option
V
was chosen.
�D` � A summar y of construction costs for review is as follows:
l
Sewer Options and Estimated Costs
CONSTRUCTION COST + 25% ENGINEERING & PLANNING
- Option 1 $333,200.00 $416,500-00
Part 1 — Gravity Sewer $153,100-00
}# Part 2 -- Force Main /Lift Station $180,100.00 `
Option 2 $504,500.00 $743,125,00
Option 3 $255,000.00 $318,750.00
Option 4 $8,445.40 $1 0,556.00
The City also has the option of doing nothing at this point. Some of the existing pipe has had
40 to 70 feet of fill on it for almost twenty years, From soil borings taken by Braun Intertec in
1984, the fly ash pit has limestone bedrock under the fill so long term settlement is not likely to
occur. If the City chooses not to proceed with an alternate sewer plan at this time, televising
and inspection of the existing sanitary and storm sewer should be completed to document the
existing conditions. Costs for this are shown above under Option 4. Additionally, escrow
money should be provided to the City by Xcel to cover the cost of the potential future sewer
installation.
Existing trunk storm sewer also runs under the existing fly ash fill site, and under or adjacent to
the proposed additional fill area. Although relocating the storm sewer is not being analyzed or
recommended at this time, the City should have an agreement with Xcel Energy whereby they
would be responsible for any future pipe failure attributable to the additional fill loading.
Attachments:
Cost Estimates
Figure 1 --- Gravity Sewer, Lift Station and Force Main
Page 2 of 2
XCEL FLY ASH SITE - COST ESTIMATE
No. Item Units Qty EE Unit Price EE Total Price
OPTION 1
PART 1 - GRAVITY SANITARY SEWER:
1 MOBILIZATION LS 1 $12,000.00 $12,000.00
2 CONNECT TO EXISTING MANHOLE EA 2 $1,000.00 $2,000.00
3 CONSTRUCT MANHOLE OVER EXISTING PIPE EA 1 $3,500.00 $3,500.00
4 24" PVC SANITARY SEWER, SDR 26 LF 1,800 $50.00 $90,000.00
5 4' DIAMETER SANITARY MH, 8' DEEP, INCL R-1 642-B EA 3 $1,800.00 $5,400,00
CSTG AND CONC ADJ RINGS
6 4' DIAMETER SANITARY MANHOLE OVERDEPTH LF 100 $100.00 $10,000.00
7 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT LF 1,800 $2.00 $3,600.00
8 ABANDON SANITARY SEWER PIPE LF 2,700 $8.00 $21,600.00
9 SEEDING, INCL SEED, FERTILIZER, MULCH AND DISK AC 2.5 $2,000.00 $5,000.00
ANCHOR
TOTAL PART 1 $ 153,100 . 00
PART 2 - FORCE MAIN AND LIFT STATION:
10 LIFT STATION STRUCTURE LS 1 $150,000.00 $150,000.00
11 6" DIP FORCEMAIN LF 1,100 $25.00 $27,500.00
12 CONNECT TO EXISTING MANHOLE EA 1 $1,000.00, $1,000.00
13 SEEDING, INCL SEED, FERTILIZER, MULCH AND DISK AC 0.8 $2,000.00 $1,600.00
ANCHOR
TOTAL PART 2 $180,100.00
TOTAL OPTION 1 $333,200.00
OPTION 2 PIPE TUNNELING:
14 MOBILIZATION LS 1 $20,000.00 $20,000.00
15 CONSTRUCT AND REMOVE JACKING PITS EA 2 $30,000.00 $60,000.00
16 24" PVC SANITARY SEWER PIPE, IN CASING LF 1,250 $60.00 $75,000.00
17 40" STEEL CASING PIPE, JACKED LF 1,250 $350.00 $437,500.00
18 SEEDING, INCL SEED, FERTILIZER, MULCH AND DISK AC 1.0 $2,000.00 $2,000.00
ANCHOR
N0. Item Units Qty EE Unit rice EE Total rice
TOTAL OPTION 2 $594,500.00
OPTION 3 PIPE LINING:
19 CITY SEWER CLEANING LF 2,500 $2.00 $5,000.00
20 SANITARY SEWER, CURED -IN- PLACE LINING LF 2,500 $100.00 $250,000.00
TOTAL OPTION 3 $255,000,00
OPTION 4 ANALYSIS OF EXISTING CONDITIONS:
21 CLOSED CIRCUIT TV INSPECTION - SANITARY SEWER LF 2,830 $1,50 $4,245.00
22 CLOSED CIRCUIT TV INSPECTION - STORM SEWER LF 1,000 $2.00 $2,000.00
23 VISUAL INSPECTION OF STORM SEINER LF 1,100 $2,00 $2+20000
TOTAL OPTION 4 $8,445.00
TOTAL OPTION 1 - GRAVITY AND FORCE MAIN $333,200,00
TOTAL OPTION 2 - TUNNELING $594,500.00
TOTAL OPTION 3 - LINING $ 255 + 000 . 00
TOTAL OPTION 4 - ANALYSIS OF EXISTING CONDITIONS $8,445.00