SEE ATTACHMENT B
5„ City staff prepare
request for the proposal; and
WITH CON
4'
INGS OF F C AN
UNCIL TH T THE
H
IT NAL E P
G (FILLIN OF LAND)
- MAY MO:
ITII
010
1
WHE AS, the City of Oak Park. Heights has received a request from Xcel
Energy for a condition use permit for land reclamation and grading necessary to install a new
internal roadway at the Alien S. King Plant, 1103 King Plant Road; and after having conducted a
public hearing relative thereto the Planning Commission of Oak Park Heights makes the
following findings of fact:
1. The real property affected by said application is legally described as
follows, to wit:
SEE ATTACIIMENT
2. The applicant has submitted an application and supporting
documentation to the Community Development Department consisting of the following items:
1 The subject property is zoned Industrial (I), under which power plant and
ancillary facilities are a permitted use -- subject to the as issued Conditional Use Permits and
River impact District regulations; and
4_ City Ordinance 308.08 specifies criteria for review of a conditional use
permit specific to the placement of fill material/ land reclamation within the City of Oak Park
Heights; and
\g report dated June 3, 2005 reviewing the
6. Said planning report recommended that the Planning Commissinn approve
the application with conditions; and
7. The Planning omm . lion held a public hearing at their Jm e 9, 2005
meeting, took comments from the applicants and public, closed the public hearing, and made the
following recommendation:
THE E FO z , E IT RE BY TIC Pi, NN G
M SION FOR THE C ` (W k O AK K HUG. : :T 1 1: PLANNING.
mISSI()N RL€ MM EN S THE FOLLOWING:
'Me p v- C Y �W
AA. application subs submit. d`' by Xc I energy for a c n � tiona: use ,�r..: 4 o land
m .� internal u
reclamation ��' `' a` . � � �"`:� � c u.:�• necessary c. •:Yk:. install �. �. � �� new ` �'.cu ..rr. •; roadway �...::�; 4 ;r.:�..st.("�j: afro, � r: the �' �� ".,;3.
reclam ion and grading nec scary o :..n t l:. a n �� in .•ernal roadway z-,�i'.d a�fi Ling the �.
, oiler 1 located at 1103 Ki ng Plant Rose as Mows:
S EE ATTACHMENT A
` the s me as hereby recommended CA: Co of h f of Oak Park ights for
-pprwal subject to the following conditions:
1. Xcel Energy must prov de a specific wetland inventoly wetland survey as well as
"Notice of Wetland Conservation Act Decision" whi h mu t state that the weans.
(if any) that are to be filled hi are 'incidental" n d not naturally occu ring - wetlands
and may he filled; Or the Notice of Wetland Conservation Act Decision must make
an alternate determination t gat the wetlands are subject to we& f. r : restrictions nd
Xcel Energy shall submit for City review a . full w 0a inventory and mined anon
plan for review. Xcei must e n implement such plan with conditions as specified by
the City Engineer prior to the commencement of any roadway construction act iv t ies.
Final drainage plans and. design g h - be soh jt to �- :. review and � a rN xa .. �-
- ' ti� and F' � C ec
.li be F ��.: Y` ��. _ •.��� , � �c :k�' R� .� QR. �•�-:. �k.�'' f�� � of
the he C t Engineer.
Xcel Energy shall submit drainage plans to the Middle S . ro Water Management
Organization for final e , once comments are provided Xcei may then potentially
proceed. Comments received shall he provided to the City prior to the
commencement of roadway construction
I Energy shall submit d ra ' n. to Minnesota DNR, Ms. Molly Shop en f or
review, once comments are provided : Xcel may then potentially proceed. Comments
received shall be pro vided to the City.
Prior to roadway ons ru .. X ei Energy pay h P, the required tree replacement
fix,. as aicula ed b T City A "bo ri t K thy Widin, n, o $2,000.
ar b d -wire must be . aLed fie the pr posed gate/fence,
Recommended by the Pluming Commission of the City of Oak Park Heights this 9 day
of June 2005.
'mon, City Administrator
I J
J/
/
, ; / ! ,
' .6-. I'
,,,- --„,4.-- - ,,
Mike Runk, Chair
3
Attachment A
Washington County GEO Code: 02.029.20.23.0004
Legal Description: Entire Gov't Lots 2 & 3, Section 2, T29, R20 as included in
NSF) Torrence RT of Title #44483
Physical Address: Xcel Energy, Inc. -- A. s. King Plant
1103 King Plant Rd.
Required Approvals:
City Council
ATTACHMENT B
CUP
4/5
Conditional Use Permit
Xcel Energy /A.S. King Plant -- Land Reclamation & Grading
Application Materials
O Application Form
i Fees
O Plan Sets (3 Large Scale Sets /20 1 I XI 7 Sets)
O Written Narrative and Graphic Materials Explaining Proposal
O Mailing List from Washington County (3507150' from subject property)
O Proof of Ownership or Authorization to Proceed
O Property Tax Statement(s)/Legal Description(s)
Planning Commission Public Hearing & Recommendation: June 9, 2005
Conditional Use Permit - Lapse of Approval:
Unless the City Council specifically approves a different time when action is officially
taken on the request, the conditional use permit shall become null and void twelve (12)
months after the date of approval, unless the property owner or applicant has
substantially started the construction of any building, structure, addition or alteration, or
use requested as part of the conditional use. An application to extend the approval of a
conditional use permit shall be submitted to the Zoning Administrator not less than thirty