Loading...
HomeMy WebLinkAbout2019-09-04 MN DLI Plumbing Review - Kitchen DEPARTMENT OF 11 LABOR AND INDUSTRY RECEIVED SEP 0 6 2019 Division of Construction Codes and Licensing REPORT ON PLUMBING PLANS PROJECT: MCF Oak Park Heights Dishwasher Replacement, 5329 Osgood Avenue.North, Stillwater, Washington County,Minnesota,Plan No. PB-R1908-0174 OWNERSHIP: Wang Vue, RECS, 50 Sherburne Avenue, St. Paul, MN 55155 SUBMITTER: Ericksen Ellison&Associates, 305 2nd St.NW, Suite 105,New Brighton, MN 55112 Plans Dated: August 22, 2019 Date Received: August 22,2019 Date Approved: September 4,2019 This review is limited to the provisions of the Minnesota Plumbing Code, Minnesota Rules,Chapter 4714 and assumes the data on which the design is based are correct. Approval is contingent upon meeting the requirement(s)listed below. A copy of the approved plans and this report must be retained at the project location. INSPECTIONS: The Minnesota Department of Labor and Industry(DLI)will be inspecting the plumbing for this project. Please contact Kara Topper at 651/279-3418 for all plumbing inspections. No plumbing work may be covered prior to inspection. The installer must verify that the required inspection fee has been submitted before scheduling. For additional information,visit our website at: http://www.dli.mn.gov/business/plumbing- contractors/pl umbing-inspections REQUIREMENT(S): 1. All plumbing shall be installed in accordance with the 2015 Minnesota Plumbing Code,Chapter 4714. Unless prior authorization is granted by the Administrative Authority,all pipe, pipe fittings,traps, fixtures,material,and devices used in the plumbing system shall meet Code Sections 301.1 and 1401.1: (1)be listed or labeled(third party certified)by a listing agency; (2)comply with the approved applicable recognized standards referenced in this code; (3)be free from defects. 2. All floor drains must be individually vented(see Sections 418.2 and 1002.1). The trap to vent distance must meet Table 1002.2. 3. The water supply connection to a commercial dishwashing machine shall be protected by an air gap or a backflow prevention device in accordance with Minnesota Rules, Chapter 4714, Section 603.3.2, 603.3.5, or 603.3.6. 4. A cleanout should be provided where new waste and vent piping connects with existing for testing. NOTE(S): 1. The scope of this project consists of remodeling an existing building. The plumbing installation includes a tell-tale floor drain and a commercial dishwasher. 2. The building is served by existing municipal sewer and water services. 3. The current Minnesota Plumbing Code, Chapter 4714, and related information can be found at: http://www.dli.mn.gov/CCLD/Plumbing.asp 443 Lafayette Road N., St. Paul, MN 55155 * (651) 284-5005 * www.dli.r n,gov An Equal Opportunity Employer MCF Oak Park Heights Dishwasher Replacement Plumbing Plan No. PB-R1908-0174 Page 2 of 2 09/04/2019 Authorization for installation may be withdrawn if not undertaken within one year. Additional recommendations or requirements may be made if changed conditions or additional information make improvements necessary. Approved: Bradley Williams,P.E. Public Health Engineer Plumbing Plan Review and Inspections 651/284-5836 Bradley.Williams@state.mn.us cc: Ericksen Ellison&Associates Wang Vue, RECS File