HomeMy WebLinkAbout2020-03-10 SRA Email Re Sign Square Footage Julie Hultman
From: Denton Mack <dentonm@sra-mn.com>
Sent: Tuesday, March 10, 2020 3:49 PM
To: Julie Hultman
Cc: Keith Heimer
Subject: RE: 03-12 OPH Public Hearing - Twin City Orthopedics
Attachments: TCO - Oak Park Heights Lighting Review
Julie,
Thank you for sending the planning report for the TCO Oak Park Heights project. I wanted to make sure you saw the
attached email from Devin Krugerud from SRa. One of the items in the report was in regards to the signs and the area
for each. These areas were shown on the elevations, but may have been hard to read. The areas are as follows:
Wall Signs
• North Elevation— No sign
• East Elevation—Orthopedic Urgent Care Sign (40 sf);TCO Sign (65 sf)
• South Elevation -TCO Sign (68 sf)
• West Elevation -TCO Sign (62 sf)
Freestanding Sign
• Shown on elevation 7A300. The area is 91 sf on a base with materials to match the building.
I wanted to clarify that you have the material board available for the meeting. Devin Krugerud from SRa hand delivered
it with the submittal documents on 2/12/2020.
Thanks!
2-0 F,, ". Denton Mack
�� v Senior Project Manager 1 Director of Healthcare
I t.952.996.9662 I c.651.245.7310
ve Vg I e dentonm@sra-mn.corn
,,, I a. 4200 W. Old Shakopee Rd. Ste.#220 1 Bloomington, MN 55437
S{TRIMS RE USERSARO'IIMI1S.INC.
From:Julie Hultman <jhultman 'cityofoakparkheights.comv> ;�'" h 2.�
Sent: riday, Murch 06, 2020 4:70 PM7
To: Denton Mask<dentonm@sra-mn.com>; Keith Helmer<keithheimer@tcomn.com>
Subject: 03-12 OPH Public Hering-Twin City Orthopedics
( I
I t
Geitlemen,
i
At ched for your reference isthe 03-12 Planning Commi sion meeting Agenda an the planrijng report for th Twin City
Ort opedics public hearing to be held that e'i�ening. The will be a papT.copy left for you at ttIE Coyncil dais t e
eve ing of the mee ing. \�
1