HomeMy WebLinkAboutBP 1995-00720 New Twin Home •
C, .NG
C. .18
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
PLAN REVIEW FE=
14168 57th Street North STATE SURCHARGE644
P.O. Box 2007
OakPark Heights,MN 55082-2007 SIGN PERMIT
(612)439-4439
CITY Ur IUTY(METER)
90_;vY:
UTILITY CONNECTION FEE
2,151.3'
UTILITY INSPECTION FEE 30.00
METRO S.A.C. 850 n
PERMIT NO. Use Zone
BP-95-00720 INVESTIGATION FEE
Permit Issued For PARKS CHARGE
OTHER
PERMISSION IS HEREBY GRANTED TOTAL
Owner Contractor
KRONGARD CONSTRUCTION KRONGARD CONSTRUCTION
14853 57TH ST N 14791 60TH ST . , STE 2 -
f(W PAP PAPY HEIGHTS MN 550P?. . nn!, rApy HEIGHTS, MN 5C:,,...,.77,.,
sI 231 43o231 4 .
To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees
and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS I CLASS OF WORK
NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH
FRONT cr SIDE or LENGTH HEIGHT NO.OF AREA OF TYPE OF MAX.OCC.
WIDTH IN FEET IN FEET STORIES LOT CONST. OCCUPANCY LOAD VALUATION
IN FEE`; OCCUPIED
PROPERTY DESCRIPTION:
ZLUL;K .1 VALLEY VIEW ESTA'1L 1 lvl IILt
AUTHORIZED WORK/SPECIAL CONDITIONS:
CONSTRUCT PER APPROVED PLAN_ ALL MN STATE BLDG CODES AND LOCAL. ORDINANCES
MUST BE MET. PERMIT DOES NOT INCLUDE A FINISHED BASEMENT, MECHANICAL,
PLUMBING OR ELECTRICAL WORK ..
ISSUE DATE: Y; 1 4 X95 EXPIRATION DATE: 6114/96..
- The applicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIOD OF 120 DAYS.TERM OF THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE.
l . I ,.
X
BUILDING OFFICIAL/AUTHORIZED AGENT Owner or Contractor
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE.FINE NOT TO EXCEED FIVE HUNDRED DOLLARS($500.00)OR IMPRISONMENT FOR NOT
MORE THAN NINETY(90)DAYS,OR BOTH.