HomeMy WebLinkAboutBP 1996-00353 New Townhome 0 -07SG.00
BUILDING
PARK
PLUMBING
CITY OF OAK PARK HEIGH l S CITY MECHANICAL 491 . 40
PLAN REVIEW FEE 39 50
14168 57th Street North
STATE SURCHARGE
P.O. Box 2007 SIGN PERMIT 90.00
Oak Park Heights,MN 55082-2007
(612)439-4439 CITY UTILITY(METER) 1 ,48 5. 4
UTILITY CCNNEC7ION FEE 30.0
1 UTILITY INSPECTION FEE 900 00
BP-96-00353S.A.C.
PERMIT NO. Use Zone R-3 METRO
FEE
Permit Issued For SINGLE FAMILY DWELLING PARKS CHARGE
OTHER
PERMISSION IS HEREBY GRANTED
TOTAL 3,792 . 34
Owner KRONGARD CONSTRUCTION Contractor KRONGARD CONSTRUCTION CO.
14791 60TH ST N #2 14791 60TH ST. N. , STE. 212
OAK PARK HEIGHTS MN 55082 OAK PARK HEIGHTS, MN 55082
430-2314 430-2314
To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees
and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS I CLASS OF WORK
NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOUSH
14£312 58TH ST N Oa
FRW`k or I SIDE or LENGTH I HEIGHT NO.OF AREA
OF TYPE OFOCCUPANCY MAX OCC.
IN FEET IN STORIES CONST. LOAD VALUATION •
FEET
'--"- . IN FEEL OCCUPIED
V-1HR R-1 I 76,000
PROPERTY DESCRIPTION: LOT 4 BLOCK 1 VALLEY VIEW CONDO'S NORTH
AUTHORIZED WORK/SPECIAL CONDITIONS:
CONSTRUCT PER APPROVED PLAN AND PUD. WORK MUST COMPLY WITH MN STATE BLDG.
CODE AND LOCAL ORDINANCE REQUIREMENTS,
ISSUE DATE: 5/06/96 EXPIRATION DATE: 5/06/97
The auulicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.THIS PERMIT SHAL EXPIRE AND BE NULL AND VOID OF THE
WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSU OR IF W o:-K IS ABANDONED OR SUSPENDED FOR
A PERIOD OF 120 DAYS.TERM OF THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE.
I
_�►..
BUILDING OFFICIAIJAUTHORIZED AGENT Owner o .• actor
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE.FINE NOT TO EXCEED FIVE HUNDRED DOLLARS($5C0.00)OR IMPRISONMENT FOR NOT
MORE THAN NINETY(90)DAYS,OR BOTH.