Loading...
HomeMy WebLinkAboutPL 2020-00243 New Commercial Building - Central Automotive CITY OF OAK PARK HEIGHTS 1111111111 1111111111ln 14168 OAK PARK BLVD N. OAK PARK HEIGHTS, MN 55082- * z o z o - o 0 z 4 3 (651) 351-1661 FAX: (651) 439-0574 ISSUED: 01/20/2021 Permit #: 2020-00243 ADDRESS : 14819 59TH ST N PIN : 04.029.20.11.0160 LEGAL DESC : OAK PARK HEIGHTS AUTO PLAZA 2ND ADD : LOT 1 BLOCK 1 PERMIT TYPE : PLUMBING PROPERTY TYPE : COMMERCIAL CONSTRUCTION TYPE : NEW CONSTRUCTION VALUATION : $ 21,500.00 NOTE: CONSTRUCT NEW CENTRAL AUTO REPAIR SHOP PER APPROVED PLANS.WORK SHALL COMPLY WITH MN DLI 9-1-2020 APPROVAL(PB-R2008-0053)WITH MN CODE& LOCAL REQUIREMENTS. VALUE OF PLUMBING 21500 APPLICANT PLUMBING-COMMERCIAL 215.00 PLUMBING STATE SURCHARGE COMMERCIAL 10.75 COMMERCIAL PLUMBING& HEATING INC. LICENSE VERIFICATION 5.00 24428 GREEN WAY AVE. FOREST LAKE, MN 55025-0000 TOTAL 230.75 (651)464-2988 Payment(s) CHECK 151027 230.75 OWNER CENTRAL AUTOMOTIVE CENTRAL AUT AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to: (1)the conditions of this permit;(2)the approval plans and specifications;(3)the applicable city approvals,Ordinances,and Codes;and,(4)the State Building Code. This permit is for only the work described,and does not grant permission for additional or related work which requires separate permits. This permit will expire and become null and void if work is not started within 180 days,or if work is suspended or abandoned for a period of 180 days any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the Minnesota State Building Code. SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. M.% DEPARTMENT OF LABOR AND INDUSTRY Division of Construction Codes and Licensing REPORT ON PLUMBING PLANS PROJECT: Central Automotive, 14661 60th St N, Oak Park Heights, Washington County, Minnesota,Plan No. PB-R2008-0053 OWNERSHIP: Central Automotive, Central Automotive, 14661 60th St N, Oak Park Heights, MN 55082 SUBMITTER: Commercial Plumbing And Heating Inc, 24428 Greenway Ave, Forest Lake, MN 55025 Plans Dated: Site C3.0 dated 7/30/2020; Plumbing by Commercial dated Initial Date Received: 08/10/2020 Last Date Received: 08/10/2020 Date Approved: 09/01/2020 This review is limited to the provisions of the Minnesota Plumbing Code, Minnesota Rules, Chapter 4714 and assumes the data on which the design is based are correct. Approval is contingent upon meeting the requirements listed below. A copy of the approved plans and this report must be retained at the project location. INSPECTIONS: This project will be inspected by the local municipality. The contractor/installer must obtain all required inspection permits from the Oak Park Heights Building Official, Julie Hultman. All plumbing installations must be tested and inspected in accordance with the requirements of the Minnesota Plumbing Code. No plumbing work may be covered prior to inspection. REQUIREMENT(S): 1. Site utility requirements: a. Recommend reviewing the curbstop shutoff with the water purveyor for approved locations. b. The water service must be installed at least 10 feet horizontally from any manhole,catchbasin,or other source of contamination,measured from the outer edge of the pipe to the outer edge of the contamination source(see Section 609.6.1). Sheet C3.0 shows the water line within 10 feet of the structure and must be revised to ensure the 10 feet horizontal isolation distance is in compliance with Section 609.6.1 c. The building PVC sanitary sewer must be in accordance with ASTM D1785, D2665, F891, or F 1488 PVC (see Section 720.1 d. The exterior PVC storm drainage on the plan south side of the building must meet ASTM D1785, D2665, D3034, F789, F794, F891, F949,or F1488 with approved fittings including cleanouts(see Table 701.1 and Installation Standard 1). Solvent welded joints must use ASTM F656 purple primer and ASTM D2564 cement. The sewer must be installed by open-trench on a continuous granular bed per ASTM D2321. e. HDPE meeting AASHTO M252 HDPE pipes 4-inch to 10-inch in size or ASTM F2306 HDPE pipes 12-inch to 60-inch with ASTM D3212 fittings may be installed from CBMH 1 to CBMH 4, if they are approved by the administrative authority as alternate materials prior to installation (see Section 301.2). 2. Delete a note on the plumbing specification that incorrectly states to provide a check valve for the fire/domestic water service line as it's already addressed correctly in another section of the specification. 3. The installation of reduced pressure principle assemblies, double check valve assemblies, pressure vacuum breakers, or spill-proof vacuum breakers is permitted only when a testing and inspection program acceptable to the administrative authority is provided(see Section 603.5.23). The administrative authority and water purveyor must be notified prior to installation. Devices must be tested upon initial installation and not less than annually, and records must be kept. Installations must be at least 12 inches and not more than 5 feet above the finished floor or ground level unless a permanent platform for access is provided. A backflow prevention fact sheet may be viewed at: http://ww w.dli.mn.gov/sites/default/files/pdf/fs_backflow.pdf 44'; Lafayette load N„ St, Paul, MN 55155 • (651; -231 5005 www cll mn ; An Equal Opportunity Employer Central Automotive Plumbing Plan No. PB-R2008-0053 Page 2 of 2 09/01/2020 4. Each horizontal drain branch, including floor drain branches, shall be provided with a cleanout at its upper terminal with the following exceptions(see Section 707.4). Provide cleanouts on the sinks and urinals. 5. All plumbing shall be installed in accordance with Chapter 4714. All pipe, fittings,traps, fixtures, materials, and devices installed shall be listed or labeled by a third-party listing agency and comply with the applicable standards referenced in the code(see Sections 301.1 and 1401.1). Alternate to code-approved materials must be approved by the administrative authority under Section 301.2 prior to installation. The proposed site-built trench drain supplied by others may be reviewed and approved by the administrative authority as an alternate 301.2. The trench drains must be constructed watertight, approved watertight joint, and be tested for watertightness by filling with water to the level of the flood rim of the trench drain. The trench drain must also not be trapped. NOTE(S): 1. The scope of this project consists of a new building. Installation includes a 50 cubic foot flammable waste interceptor,two restrooms, a 4-inch trench drains,service sink, a handsink, restroom floor drains, a 10- gallon water heater and a water cooler supply line. No water supply line is proposed for the vehicle service garage areas. 2. This facility will be served by municipal water and sewer. Authorization may be withdrawn if installation does not begin within one year. Additional requirements may result from changed conditions or additional information. Approved: Cathy Tran, PE Plumbing Plan Review and Inspections 651/284-5898 or Cathy.Tran@state.mn.us �a.doli.state.mn.us/business/get-1 icenses-and-permits/plumbing-plan-review cc: Commercial Plumbing& Heating Inc c/o Alissa Anton Central Automotive,Central Automotive AE-MN, Adam Thiele Julie Hultman, Building Official File