Loading...
HomeMy WebLinkAboutBP 1998-00707 New Townhome DING 9 3 7 . 7 5 CITY PLUMBING CITY OF OAK PARK HEIGHTS CITY MECHANICAL 609. 54 14168 57th Street North PLAN REVIEW Fe. 46.00 STATE SURC,4ARGE P.O. Box 2007 SIGN P=_RMIr Oak Park Heights,MN 55082-2007 95.00 CITY UTILITY(METER) (612)439-4439 1 ,485. 44 UTILITY CONNECTION F—n—c 30.00 UTILITY INSPECTION FE_ 1 ,000.00 PERMIT NO. BP-98-00707 Use Zone R-1 METROS.A.C. INVESTIGATION FEE Permit Issued For SINGLE FAMILY DWELLING PARKS CHARGE OTHER PERMISSION IS HEREBY GRANTED TOTAL 4 ,203 . 73 Owner KRONGARD CONSTRUCTION CO Contractor KRONGARD CONSTRUCTION CO 14791 60TH ST N, STE 2 14791 60TH ST N *2 OAK PARK HEIGHTS OAK PARK HEIGHTS MN 55082 430-2314 430-2314 To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon the violation of the provisions of said code. JOB ADDRESS I CLASS OF WORK NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH 14818 58TH ST N *8 CC., X I I I r FRCNT or AREA CF WIDTH SIDE or LENGTH HEiCn i NO.OF LOT TYPE OF MAX.CCC IN FEET IN FEET STORIES CONST OCCJPANCY I LOAD E: VALUATION IN FECCCUPIE] 32 34 30 2 1088 V-1HR R—; I 92,000 PROPERTY DESCRIPTION: LOT 3 BLOCK 1 VALLEY VIEW ESTATES AUTHORIZED WORK/SPECIAL CONDITIONS: CONSTRUCT PER APPROVED PLAN, PER MN STATE BUILDING CODE AND LOCAL ORDINANCE REQUIREMENTS 12/17/98 12/17/99 ISSUE DATE: EXPIRATION DATE: The arnvlicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of the required inspections 24 hours in advance as noted on Inspection Record Card A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WORK AUTHORIZED BY THE BUILDING P RMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR A PE- .• • 120 DAY ' RM: RMIT IS 12 MONTHS FROM DATE OF ISSUE f .;4110110 `1* ' BUILDING OFFICLAUAUTNORIZEDAGENT Owner . Contractor ' _7 PENALTY FO' OLATION OF ANY OF THE PROVISIONS OF BUILDING CODE.FINE NOT TO EXCEED FIVE HUNDRED DOLLARS(S5CC CC)OR IMPRISONMENT FOR NOT MCRE THAN NINETY(9C)DAYS,OR 30TH_