Loading...
HomeMy WebLinkAboutBP 1995-00773 Addition >mil —'� 1 4ULDING CITY PLUMBING I CITY OF OAK PAR HEIGHTS MECHANICAL 72. 97 PLAN REVIEW FEE 14168 57th StreetNorth 3 . 0 0 STATE SURCHARGE i P.O. Box 27 SIGN PERMIT Oak Park Heights,MN 55082-2007 CITY UTILITY(METER) (612)439-4439 UTLITY CONNECTION FEE UTLITY INSPECTION FI f PERMIT NO. BP-95-00723 Use z ne R-2 METRos.AC. INVESTIGATION FEE Permit Issued For ADD I T I ON PARKS CHARGE OTHER PERMISSION IS HEREBY GRANTED TOTAL 188 . 22 Owner DOUG CARL SON Contractor 6218 PEABODY AVE N OAK PARK HEIGHTS MN 55082 430-043700-0000`' To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees } and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon the violation of the provisions of said_code. JOB ADDRESS I CLASS OF WORK NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOLISH 6218 PEABODY AVE N X ( ,, FRONT or ,AREA OF . WIDTH I SIDE or LENGTH I HEIGHT NO. TYPE OF MAX OCC. IN FEET IN FEET STORIES . LOT CONST. OCCUPANCY LOAD VALUATION IN FEET I ,OCCUPIED 16 I 30 20 1 I . V—N R-3 J 6,000 PROPERTY DESCRIPTION: LOT BLOCK i AUTHORIZED WORKISPECIAL CONDITIONS: CONSTRUCT PER APPROVED PLAN AND MUST MEET ALL MN STATE BUILDING CODE REQUIREMENTS. ALSO THE CONDITIONS OF THE VARIANCE GRANTED BY THE CITY COUNCIL MUST BE MET. ISSUE DATE: 10/0 5/95 EXPIRATION DATE: 10/05/96 The applicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the `requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of the required inspections 24 hours in advance as noted On Inspection Record Card. A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR D OF 120 D OF THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE. .r ../ .r. 27 A ` moi ,,t r i r- 0)-\ BUILDING OFFIC AU ORIZED AGENT • e , of Contractor PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE.FINE NOT TO EXCEED FIVE HUNDRED DOLLARS(500.00)OR IMPRISONMENT FOR NOT MORE THAN NINETY(90)DAYS,OR BOTH.