Loading...
HomeMy WebLinkAbout2009-10-26 Summit Fire Protection - Report of Inspection StE +QA :- 575 MINNEHAHAAVE.W•ST.PAUL,M: 3•(651)251-1880 3026 40TH E.I\ , I 55901 •(507)280-0622 y418 GREAT OAK DR.,WAITE PARK,MN 5638 •(320)257-6390 760 LIBERT WAY,NORTH LIBERTY,I. 52317•(319)665-4330 08 ENTEIIFRISE CIRCLE•DULUTH,MN 55811 •(218)740-4412 JAN - 3 2010 3SET1OF 2-Use separate sheet for each building inspection REPORT OF INSPECTION ''SSYY�F OAK PARK HE bi MINNESOTA LICENSE NO.C0075 CjUB NU1R ; )' • INSPECTION IIAIVIE 1A a ' O - BUILDING/LOCATION STREET 0 cr rie ? 04,41-111-- INSPECTOR 41 r C &STATE i9 p4 Berth i 3 DATE /lei ''� D. p, - Owner's Section(to be answered by Owner or Occupant) A. Explain any„occupancy hazard changes since the previous inspection: B. Describe fire protection modifications made since last inspection: ) iki'"' C. Describe any fires since last inspection: D. When was the system piping last checked for stoppage,corrosion of foreign material? r 1 _ - . When-was a dry pilin system tem last clicked f6r pr�ei pitch? I# f E Are dry s-ik:eat p t d rom freezing? l f" { / I rt Signator Title hA •.�- Date (, b �' `/ --; pector's Section All responses reference current inspection) NA=NOT APPLICABLE General 'Is the building occupied? ,Yes 0 No b.Are all systems in service? 'es 0 No e.Is there a minimum of 18 in.(457 mm)clearance between the top of th torage and the sprinkler deflectors? 'es CI No d.Does all electrical heat tape appear to be satisfactory? ❑Yes 0 No 3NA e.Does the hand hose or standpipe on the sprinkler system(s)appear to be satisfactory? 1'es 0 No 0 NA 9. —4 Control Valves(See Item 15.) a.Are all sprinkler system control valves and all other valves in the appropriate open or closed position? *es 0 No b.Are all control valves in the open position locked,sealed or equipped with a tamper switch? ❑YesTIo Tanks,Pumps,Fire Department Connections a.When was fire pump last tested for performance? b.Are fire pumps,gravity tanks,reservoirs and pressure tan `s in good condition and properly maintained? ❑Yes 0 NoA - c.Are fire department connectio sin satisfactory condition,couplings free,caps in place,and check valves tight? 'Yes o ❑NA • Are they accessible and visible? es U No 0 NA ff 4. Wet Systems — a.Are cold weather valves(O.S.&Y.)in the appropriate open or closed yosition? yes 0 No ❑NA b.Have antifreeze system solutions been tested?'Yes 0 No ❑NA •.�j.,. c.What temp is antifreeze? d.In areas protected by wet system s ,does the buildinppear to b properly heated in all areas,including blind attics and perimeter areas ' where accessible`I'es 0 No 0 NA e 5. Dry System(See Items 11 to 13) a.Are dry valve(s)in service? ❑Yes 0 No NA - b.Are theair pressures d priming water levels in acc?rdance wi'i i :' actgirer's instructions? UYe, U Np 0 N, p�aann u 4, c.Has the operation of-theafnor nitrogen supplies been tested? r Ie• • :� ■ NA Are they in service? '°Yes C0 Na NA d.Were low points drained during this inspection?OYes ❑N. 'o A i many? • , e.Did quick-opening devices=fperate satisfactorily? ❑Yes • C• ■ /' f.Did the dry valve(s)trip properly during the trip pressure t t? ❑Yes 0 No 0 NA -F- g.Did the heating equipment in the dry-pipe valve room(s)operate at time of inspection? ❑Yes ❑No 0 NA -6. Special Systems(See Item 14.) a.Did the deluge or pre-action valves operate properly during testi ,? 1J s i No ❑NA b.Did the heat-responsive devices operate properly during testings • 'e •■E• DNA 'w , c.Did supervisory devices operate duringtesting? ❑Yes❑No ►A A d.Did flow for kitchen hood system shut off gas or electric? • 'es 0 o 0 A 7. Alarms a.Did water motor(s)and gong(s)test satisfactorily? ❑Yes 0 No*A t . ` b.Did electric alarm(s)test satisfactorily? es 0 No 0 NA _ ` c_Did supervisory alarm service test satisfactorily? es 0 No ❑NA • t d,_Didtairiper switches test_sat sfactorily? 'es No 0 NA t 8.. Sprinklers a.Are all sprinklers free from corrosion,loading or obstruction to spray discharge? ►` 'es 0 No ': b.Are sprinklers less than 50 years old?(Older sprinklers require sample testing) ►" es 0No c.Are quick response and residential sprinkJ rs less than 20 years old?(Older sp • It ers require sample testing) ties ❑No d.Is stock of spare sprinklers available? es ❑No e.Does the exterior cond•.• of sprinkler system appear to be satisfactory? Wes 0 No f.Are sprinklers of p :►-r t:i perature rating for the' locations?Ves 0 Ncr- ; g.Are any sprinkl- cads '.n a rec ?OYes o .^^� Signature: j":11/4_ .. ' - Date: JVs v a SUMMIT FIRE PROTECTION " -4575 MINNEHAHA AVE.W•ST.PAUL,MN s5103•(651)251-1880 3Q26.102'I.1 AVE.Illy "}ROCIIESTER,MN 55901•(507)280-0622 4418 GREAT QAK DR.,WAITE PARK,MN 56387•(320)257-6390 7(0 LIERE TH L BERTY,IA 52317•(319)665-4330 4208 ENTERPRISE CIRCLE•DULUTH,MN 55811 •(218)740-4412 A ry ft SHEET 2'0F 2-Use separate sheet for eacl#system inspection JAN _ 8 2010 —ype of System ifieirr 4vf l' e., Ins ection N me and Nber i low Many? j c.�4/ 1O •CITY OF OAK PARK HEIGHTS What • -9 _J/1 w AM ,� r+tlla.��, witch;,.. - • - ,, ; i eckwith Pres I e Switch ` 9.,Date dry pipe valve trip tested(control valve partially Open) > - 1 (See Test Table which follows), , , 10. Dare'dry-pipe valve triptested(control valve fullY open) `A , ,�ms (see Trip Test Table which follows) 11. Date quick-opening device tested (See Trie Test able which follows DRY VALVE TRIP TES TABLE ...i. MAKE MODEL SERIAL NO. v MODEL SERIAL NO. DRY PIPE Time to Trip Water Air .- ' Water Reached Alarm Operated OPERATING Thru Test Pipe Pressure pressure Air-ressure Test Outlet Properly TEST MIN. SEC. PSI PSI PSI MIN. SEC. YES NO Without Q.O.D. With 12. Date deluge or preaction valve tested ' (See Trip Test Table •Ilows) TRIP TEST TAB Operation 0 PNEUMATIC 0 ELECTRIC ■ •DRAULIC Piping Supervised 0 YES 0 NO • ,;ng media su wised 0 YES 0 NO DELUGE& Does valve operate from the manual trip and/or remote control sta'._ 0 YES 0 NO PREACTION Is there an accessible facility in each circuit for testing Meth I testing-circuits VALVES 0 YES 0 NO Does each circuit operate each circuit _ Maximum time to' MAKE MODEL supervision loss alarm operate valve releaseoperate release YES N( YES , ;',NO YES . NO 13. See Control ValvexMaintenance Table. Control Valve Maintenance Table Explain • Abnormal Control Valves Number Type Open Secured Closed Signs Condition City Connection Control Valve Tank Control Valves Pump Control Valves ���'//// " Sectional Control ValvesAr d g6/ 09-5 .,.,r,,,.. ,/:.,dEf rtic- .. System Control Valves �`` '�`� ViVer Otter pontroi Vater s • r• —,,,. ix Kitchen Control Valve 16. Water Flow Test at Sprinkler Riser Water Supply Source: , Ci Tank Pump Date` ,, st Pipe Size of. Static Residual Differential Location Test Pipe Pressure (Flow) s Pressure Last Water Flow Test 1.,s-or -` '' ,.,,t, Rif J A, 7{" L ► This Water Flow Test ). rld 4.4, . 5 7 ° 14., Explain any"No"answers and comments: Signature: Date: .r ► )