VALLEY VIEW CONDOMINIUMS NORTH ASSOCIATION
%DONNA S. GRAY `
14812 58TH STREET NORTH ##3D
OAK PARK HEIGHTS MN 55082-6396
TEL: 651-430-0822
February 12, 1999
Memo to:
Chris Danielson, Community Development Director
Jim Butler,City Building Official
Karen Shimon, City Engineer
1
i From: Donna S. Gray y 3 c-7573 - .
Jim Meyer
Re: Meeting 2/10/99
Thank you for meeting with us regarding issues at Valley View Condominiums North
Association. The issues as we see them are as follows:
1. Retaining Wall
No Krongard Construction to build the wall according to the original drawings. This means
a four-foot wall extending south to beyond Building A to the south side of the street. By
doing this hopefully it will discourage trespassers from cutting through the property.
2. Spillway
Since you have indicated that the spillway must remain, we are requesting that Krongard
GL Construction do a permanent spillway of concrete. The present spillway is just pavement
and it is already disintegrating. The south side of the spillway should be built up the same
as the north side was and the cement should follow the block line.
3. Settling of ground on the SE corner of Building D.
N° Cement curb has broken and settled therefore water collects in this area We would like
Krongard Construction to redo the curb and pavement in this area to facilitate drainage.
4. Lighting
Dusk to dawn sensors to be installed on Building B(14824 58th St. N.)on the garage
o3 lights. Reference Northwest Associated Consultants,Inc. Planning Report dated
+ September 9, 1994,File No. 798.02—94.05 page 8. "Lighting. The applicant has
submitted a general lighting plan. There are to be no yard or street lights. Lights affixed
to the garage front of each structure will be operated by a light sensor and will operate
from dusk until dawn. For safety reasons,our office recommends street lights be
installed as per City requirements throughout the development."
s
•
FEB-17-1999 13:20
CITY OF OPH
P.03iO3
•
5. Sprinkler System
Yard sprinkler system. Carl's Sprinkler installed the system in the present 3 buildings.
There are no plot maps available because they did not make any. AIso we feel the use
inferior sprinkler heads and we have had to replace most of them. We wo y d
Kron_. d Construction
I.•t K Professional Po
�QS rinlder contractor._g this we insist
U• Gear Driven Sprinkler earls be used and the Imes mapped.
e • sociation must maintain this system so we are asking Krongard Construction to
cooperate with the Association on this matter. .
6. Siding Damage
\‘3S Siding damaged by hanging sales banners, or otherwise damaged in construction.
Specifically these include:
Crack in siding on patio wall next to driveway—bottom piece of siding. Unit 6B.
•
Loose siding under second level left window, front of townhouse Unit 6B.
Holes in siding caused by hanging banners to the West Sidee of Unit B between -
Units 1 & 6. (Some was corrected but not all—particularly the higher
Between Units 1 & 6B. level.)
Hole in siding on patio next to door. Unit 2D.
(For Your Information—we tried to purchase siding to do some of these repairs
but found that the siding company would not sell to us since we are not a
contractor.)
The Association feels strongly that Items 1, 2 and 4 fall under the City's jurisdiction. We
are asking your help in perhaps mediating a meeting with Krongard Construction to
resolve Items 3, 5, & 6. The owners have tried to have some of Item 6 corrected since
September of 1996.
We also want to call your attention to the fact that if the above Item 1 &
are not in accordance with the change in the Grading Plan that Krongard 2 ns�ctionhey
would like to have amended in their letter to the City dated November 25, 1998, and that
request will need to be denied.
We hope to hear from you soon.