MINNESOTA DEPARTMENT OF HEALTH
Division of Environmental Health S m $ LIJ0
REPORT ON PLANS ;
•
13605
Plans and specifications on plumbing: Americlnn Motel& Suites, 60th Street North, C: --
Washington County,Minnesota,Plan No. 010311
OWNERSHIP:
SUBMITTER(S): Cobra Construction,Inc., 4742 Banning Avenue,White Bear Lake,Minnesota 55110
Plans Dated: May 8,2000
Date Received: August 28,2000,August 16, 2000,July 27,2000
Date Reviewed: August 28,2000
•
SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the
Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which
this plumbing system is connected. The review is based upon the supposition that the data on which the design is
based are correct, and that necessary legal authority has been obtained to construct the project. The
responsibility for the design of structural features and the efficiency of equipment must be taken by the project
designer. Approval is contingent upon satisfactory disposition of any requirements included in this report.
Special care should be taken to insure that the material and installation of the plumbing system are in accordance
with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should
be retained at the project location for future reference.
Enclosed is a copy of the report and transmittal letter to be forwarded to the project owner.
INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of
the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830,no plumbing work may be
covered prior to completing the required tests and inspections. Provisions must be made for applying an air test
at the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820, subpart 2, of the code.
A manometer test, as specified in Minnesota Rules,part 4715.2820, subpart 3, is required at the time of the
finished plumbing inspection. It is the responsibility of the contractor/installer to notify the State Health
Department when the installation will be ready for a test and inspection. To schedule inspections,contact the
state plumbing standards representative for your region, or call the metro office at 1-800-926-6216, or Gary Topp
at 651/215-0841.
REQU,'REMENT(S):
1. All plumbing shall be installed in accordance with the Minnesota Plumbing Code(see Minnesota Rules,
part 4715.0320).
2. Materials used for the plumbing system shall comply with the standards set in the Minnesota Plumbing
Code(see Minnesota Rules,part 4715.0420).
3. If plastic pipe is used for the drain,waste and vent system:
a. ABS plastic pipe shall comply with ASTM Standard D 2661 or F 628.
b. PVC plastic pipe shall comply with ASTM Standard D 2665, D 2949,F 891,D1785, or D2241.
c. It must be installed in accordance with Minnesota Rules, part 4715.0580(F)and part 4715.0600.
Above-grade horizontal runs of plastic waste and vent pipe cannot exceed 35 feet in total length.
Above-grade vertical stacks constructed of plastic pipe may exceed 35 feet in total height only if an
approved expansion joint is used.
AmericInn Motel& Suites
Plumbing
Plan No. 010311
Page 2
August 28, 2000
d. Solvent weld joints in PVC and CPVC pipe must include use of a primer which is of contrasting color to
the pipe and cement(see Minnesota Rules,part 4715.0810, subpart 2).
4. All pot, scullery, food prep, and bar sinks must be provided with a floor drain on the horizontal drainage
branch serving each sink. This floor drain must not be equipped with a backwater valve(see Minnesota
Rules,part 4715.1390, subpart 2).
5. The water supply line to the automatic clothes washer must be protected against backflow by the use of an
air break or approved vacuum breaker. The discharge must be through an air break(see Minnesota Rules,
part 4715.1230).
6. The water piping system shall be disinfected in accordance with Minnesota Rules,part 4715.2250.
7. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820.
Authorization for construction in accordance with the approved plans may be withdrawn if construction is not
undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean
that recommendations or requirements for change will not be made at some later time when changed conditions,
additional information, or advanced knowledge make improvements necessary.
Approved
- �
�. _:
Steven W. Klemm,P.E.
Public Health Engineer
Environmental Health Services Section
P.O. Box 64975
St.Paul,Minnesota 55164-0975
651/215-0848
SWK:cac
cc: Project Owner
Cobra Construction,Inc.
Mr.Jim Butler, Plumbing Inspector `�
Ms.Angela Wheeler, Washington County Department of Public
Plumbing Unit
Pool Program
File