SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
1
BOUNDARY AND TOPOGRAPHIC SURVEYBHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
MODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH G2
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_G02.DWG9/30/2022 8:47:42 AMLIFT BRIDGE BUILDERS
9/30/2022 8:48:05 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
2
CONSTRUCTION AND GENERAL NOTESBHEINRICH07/15/2022
11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
SEEDING NOTES:
1.TEMPORARY SEEDING IS DESIGNED TO CONTROL EROSION FOR A PERIOD OF ONE
YEAR OR LESS AND IS GENERALLY REMOVED TO PERFORM FURTHER CONSTRUCTION
ACTIVITES OR TO PERMANENTLY STABLIZE A CONSTRUCTION SITE.
2.PERMANENT SEEDING IS DESIGNED TO CONTROL EROSION FOR AN INDEFINITE PERIOD
AFTER LAND DISTURBING ACTIVITIES HAVE CEASED ON THE SITE.
3.COVER CROP IS THE APPLICATION OF TEMPORARY SEED (ANNUAL) WITH PERMANENT
SEEDING TO ESTABLISH QUICK GROUND COVER.
4.MULCHING IS DESIGNED TO COVER SOIL TO ABSORB THE EROSIVE IMPACT OF
RAINFALL AND REDUCE THE FLOW VELOCITY OF RUNOFF.
5.APPLICATION RATES:
TEMPORARY SEEDING:
FALL (AUGUST 1 - OCTOBER 1) - MNDOT MIX 21-112 AT 100 LBS/ACRE
SPRING/SUMMER (MAY 1 - AUGUST 1) - MNDOT MIX 21-111 AT 100 LBS/ACRE
PERMANENT SEEDING:
SITE SEEDING: MNDOT MIX 25-131 AT 220 LBS/ACRE
INFILTRATION BASIN SEEDING: MNDOT MIX 25-131 AT 220 LBS/ACRE
COVER CROP:
FFALL (AUGUST 1 - OCTOBER 1) - MNDOT MIX 21-112 AT 100 LBS/ACRE
SPRING/SUMMER (MAY 1 - AUGUST 1) - MNDOT MIX 21-111 AT 100 LBS/ACRE
MULCHING: (DISC ANCHORED)
MNDOT TYPE III AT 2 TONS/ACRE
UTILITY CONSTRUCTION NOTES:
1.THE CITY OR IT'S DESIGNEE SHALL BE PRESENT FOR WATER AND SANITARY SERVICE
CONNECTIONS TO CITY UTILITIES.
2.STORM SEWER THAT SERVES THE SITE IS PRIVATE AND WILL BE MAINTAINED BY
OWNER.
GRADING NOTES:
1.SITE GRADING/EXCAVATION/EMBANKMENT/COMPACTION SHALL USE ONLY SUITABLE
MATERIAL AS APPROVED BY THE ENGINEER. REMOVE UNSUITABLE AND UNSTABLE
MATERIALS INCLUDING BUT NOT LIMITED TO TOPSOIL, ORGANIC MATERIAL, AND
DEBRIS FROM THE PAVEMENT AREAS.
2.BACKFILL ALL BELOW GRADE EXCAVATIONS IMMEDIATELY UPON REMOVAL OF THE
UNSUITABLE SOILS. BACKFILL EXCAVATIONS ADJACENT TO EXISTING FEATURES
PROMPTLY TO AVOID UNDERMINING ADJACENT AREAS.
3.EMBANKMENT BACKFILL MATERIAL IN BUILDING PADS AND PAVED AREAS SHALL BE
COMPACTED TO 95% MODIFIED PROCTOR, EXCEPT THE TOP 3' WITHIN PAVED AREAS
SHALL BE COMPACTED TO 100% MODIFIED PROCTOR.
4.THE SPECIFIED DENSITY METHOD OF COMPACTION IS REQUIRED FOR ALL PORTIONS
OF PERMANENT CONSTRUCTION. STANDARD COMPACTION IS REQUIRED FOR ANY
TEMPORARY CONSTRUCTION.
5.SALVAGE AND PROVIDE A MINIMUM DEPTH OF 6-INCHES OF TOPSOIL TO ALL AREAS
DISTURBED BY CONSTRUCTION.
6.DISPOSE OF ALL REMOVED, UNSUITABLE, AND EXCESS MATERIALS OFF THE
CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE LAWS AND
REGULATIONS, UNLESS OTHERWISE SPECIFIED.
7.PROPOSED SPOT ELEVATIONS AND CONTOURS ARE TO FINISHED GRADE. SPOT
ELEVATIONS ARE DEFINED BY THE LEGEND.
8.PROVIDE A SMOOTH AND THOROUGH TRANSITION BETWEEN PROPOSED SITE GRADES
AND DRAINAGE WAYS AND EXISTING SURROUNDING SITE GRADES AND DRAINAGE
WAYS.
9.PROVIDE NECESSARY SOIL TESTING TO THE OWNERS SATISFACTION THAT
COMPACTION LEVELS AND DEFINED SOIL GRADATIONS ARE BEING MET.
10.COMPLETE ALL PROPOSED CONSTRUCTION USING APPROVED MATERIALS, METHODS
OF PLACEMENT AND TESTING AS REQUIRED BY ALL GOVERNING SPECIFICATIONS.
11.CARE MUST BE TAKEN DURING CONSTRUCTION AND EXCAVATION TO PROTECT ALL
SURVEY MONUMENTS AND/OR PROPERTY IRONS ON AND ADJACENT TO THIS SITE. ALL
MONUMENTS/IRONS DAMAGED DURING CONSTRUCTION WILL BE REPLACED/RESET BY
THE CONTRACTOR AT NO COST TO THE OWNER.
12.REPAIR ALL DAMAGE TO EXISTING FACILITIES RESULTING FROM CONSTRUCTION
ACTIVITIES AT NO COST TO THE OWNER.
13.SEQUENCE CONSTRUCTION ACTIVITIES TO MINIMIZE THE AMOUNT OF LAND
DISTURBED. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL THE
SITE HAS BEEN STABILIZED.
14.WRITTEN DIMENSIONS PREVAIL OVER SCALED DIMENSIONS.
15.1' VERTICAL CONTOUR INTERVAL.
GENERAL NOTES:
1.THE CURRENT EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION
GOVERNS EXCEPT AS MODIFIED BY THE PROJECT SPECIFICATIONS CITY OF OAK PARK
HEIGHTS CODES, ORDINANCES, STANDARDS AND SPECIFICATIONS.
2.FURNISH, INSTALL, INSPECT, MAINTAIN AND REMOVE ALL NECESSARY TRAFFIC
CONTROL SIGNAGE. ALL TRAFFIC CONTROL DEVICES AND SIGNAGE SHALL CONFORM
TO ALL LOCAL, COUNTY AND STATE TRAFFIC CONTROL GUIDELINES, INCIDENTAL TO
PROJECT.
3.SECURE ALL NECESSARY PERMITS AND NOTIFY ALL UTILITY COMPANIES WITH
UTILITIES ON SITE PRIOR TO THE CONSTRUCTION OF THE PROJECT. ADHERE TO ALL
APPLICABLE LOCAL, STATE, AND/OR FEDERAL LAWS FOR ANY COST INCURRED DUE TO
THE DAMAGE OF SAID UTILITIES.
5.PROTECT ALL ITEMS WITHIN CONSTRUCTION LIMITS NOT DESIGNATED FOR REMOVAL
OR MODIFICATIONS. THIS SHALL INCLUDE, BUT IS NOT LIMITED TO, CURB AND GUTTER,
CONCRETE AND BITUMINOUS SURFACES, TREES, SIGNS, BUILDINGS, FENCES, ETC.
6.CONTRACTOR SHALL LOCATE AND/OR PROTECT ALL UTILITIES WITHIN CONSTRUCTION
LIMITS NOT DESIGNATED FOR REMOVAL OR MODIFICATIONS. THIS SHALL INCLUDE, BUT
IS NOT LIMITED TO, TELEPHONE, ELECTRICAL, GAS, CABLE TV, FIBER OPTIC, TOWERS,
POWER POLES, LIGHT POLES, WATER, SEWER, OVERHEAD LINES, ETC. ANY DAMAGE
TO EXISTING UTILITIES WILL BE REPAIRED IN-KIND AT THE EXPENSE OF THE
CONTRACTOR.
7.THE INFORMATION ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF
UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE
CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATIONS AS TO THE
TYPE AND LOCATION OF UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE TO
THESE UTILITIES. CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL PRIOR TO
CONSTRUCTION.
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
E
D
S
D D
S
S
D
S
D HY DCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLFIBER FIBER FIBER
FIBER FIBER FIBER
FIBERCBLCBLCBLCBLCBLCBLCBLCBL
GAS GAS GAS GAS GAS GAS GAS GAS
FIBER FIBER FIBER FIBER FIBER FIBER
GASGASGASGASGASGASGASGASGASGASGASGASGASGASFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERllGAS GAS
EEE
E E E E E E
9
0
9
.
1
2
9
0
9
.
1
1>>>>>>>>>>>>>>>>H H
HH
H H
HH
H H H
H
H
X
XXAC
AC
AC
X
XXXXXG
OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHWOHWOHWOHWOHWOHWOHWOHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW
OHWOHW
OHW
OHW
OHW
OHW
OHW
OHW OHW OHW
OHW
OHWOHWOHWOHWOHWOHWH
H>>>>>>E
M
MM
M
T
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>lllllllllll>>>>>>>>>>>>>>>>>>lllllllllllllllll>>>>lWV>>>>OHW
OHW
OHW
OHW
E
EXISTING BUILDING OMAHA AVENUE60TH STREET NORTH
EXISTING
BUILDING
11
1
1
1
2
APPROXIMATE
PROPERTY BOUNDARY (TYP)
APPROXIMATE
PROPERTY BOUNDARY (TYP)
APPROXIMATE
PROPERTY BOUNDARY (TYP)
APPROXIMATE
PROPERTY BOUNDARY (TYP)PROTECT TREESSALVAGE AND RELOCATE TREE
IF NECESSARY FOR CONSTRUCTION
PROTECT TREES
18" COTTONWOOD
22" COTTONWOOD
14" BOXELDER
30" COTTONWOOD
26" COTTONWOOD
10" ELM
10" ELM
20" ELM
8" ELM
10" ELM
10" ELM
16" ELM
8" ELM
14" ELM
REMOVE GRAVEL
CLEAR AND GRUB TREES
AND VEGETATION
4
3
3
3
5
5
0 4020
SCALE IN FEETMODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C1
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C01.DWG9/30/2022 8:23:30 AMLIFT BRIDGE BUILDERS
9/30/2022 8:25:40 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
3
REMOVAL PLANBHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
LEGEND
PROPERTY BOUNDARY
REMOVE BITUMINOUS PAVEMENT
REMOVE GRAVEL
SAWCUT PAVEMENT
REMOVE CURB AND GUTTER
CLEAR AND GRUB TREE
KEYNOTES:
1.SAWCUT PAVEMENT FULL DEPTH.
2.POWER POLES AND GUY WIRES TO BE RELOCATED BY OTHERS.
3.SAWCUT AND REMOVE BITUMINOUS AS REQUIRED FOR DRIVE CONSTRUCTION.
4.SAWCUT AND REMOVE BITUMINOUS AS REQUIRED FOR UTILITIES CONSTRUCTION.
5.SALVAGE CASTING AND PROVIDE TO CITY.
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
E
D
S
D D
S
S
D
S
D HY DCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLFIBER FIBER FIBER
FIBER FIBER FIBER
FIBERCBLCBLCBLCBLCBLCBLCBLCBL
GAS GAS GAS GAS GAS GAS GAS GAS
FIBER FIBER FIBER FIBER FIBER FIBER
GASGASGASGASGASGASGASGASGASGASGASGASGASGASFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERllGAS GAS
EEE
E E E E E E>>>>>>>>>>>>>>>>H H
HH
H H
HH
H H H
H
H
X
XXAC
AC
AC
X
XXXXXG
OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW OHW
OHW
OHWOHWOHWOHWOHWOHWH
H>>>>>>E
M
MM
M
T
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>lllllllllll>>>>>>>>>>>>>>>>>>lllllllllllllllll>>>>lWV>>>>OHW
OHW
OHW
OHW
E
APPROXIMATE
PROPERTY BOUNDARY (TYP)>>>>>>>WWW W W W W
D
D
D
DDD
EXISTING BUILDING OMAHA AVENUE60TH STREET NORTH
EXISTING
BUILDING
APPROXIMATE
PROPERTY BOUNDARY (TYP)
24'
32'
8'
10'
12' BYPASS LANE
APPROXIMATE
PROPERTY BOUNDARY (TYP)
APPROXIMATE
PROPERTY BOUNDARY (TYP)
18'
18'
18'
9'
9'
12'
9'
12'
1
2
3
5'
4
5
6
6
2
3
7
8
9
9
10
10
11
3
14
13
13
5
12
15
16
17
17
17
17 17
18
19
10'
10'
32'
2120
22
6
23
24
25
25
3
0 4020
SCALE IN FEETMODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C2
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C02.DWG9/30/2022 8:23:38 AMLIFT BRIDGE BUILDERS
9/30/2022 8:25:50 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
4
SITE DEVELOPMENT PLANBHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
LEGEND
PROPERTY BOUNDARY
CURB AND GUTTER
BITUMINOUS PAVEMENT
CONCRETE PAVEMENT
IRON-ENHANCED FILTRATION BASIN
STORM STRUCTURE
SIGN
SANITARY MANHOLE
SANITARY SERVICE
WATER SERVICE
D
S
>
W
KEYNOTES:
1.RETAINING WALL BY OTHERS. (WALL SHOWN FOR REFERENCE ONLY. SEE
STRUCTURAL PLANS FOR RETAINING WALL DESIGN AND LAYOUT).
2.B612 CURB AND GUTTER.
3.TIPOUT B612 CURB AND GUTTER.
4.DRIVEWAY B612 CURB AND GUTTER.
5.COMMERCIAL CONCRETE DRIVEWAY APRON.
6.CURB CUT FOR RAIN GUARDIAN TURRET.
7.CONCRETE DRIVE.
8.CONCRETE WALK.
9.PAVEMENT MARKING. 4" WHITE PAINT (TYP).
10.PAVEMENT MARKING, DIAGONAL, 4" WHITE PAINT (TYP).
11.PAVEMENT MARKING, ACCESSIBLE SYMBOL.
12.VAN ACCESSIBLE PARKING SIGN.
13.APPROXIMATE LOCATION OF VACUUM.
14.VEHICLE DISPLAY CONCRETE PAD.
15.CONNECT TO EXISTING 9" VCP CIPP LINED SANITARY SEWER WITH SADDLE.
APPROX INV EL = 900.83.
16.CONNECT TO EXISTING 8" DIP CL 52 WATERMAIN WITH WET-TAP.
2" COPPER
2" CORP
2" CURB STOP & BOX
17.CURB & GUTTER END TAPER.
18.INSULATE WATER PIPE.
19.6" PVC SANITARY SERVICE. INSTALL WITH 1% MIN SLOPE AND 4' MIN COVER.
COORDINATE LOCATION AND ELEVATION WITH ARCHITECTURAL/PLUMBING
PLANS. VERIFY ELEVATIONS PRIOR TO CONSTRUCTION.
20.SANITARY SERVICE CLEANOUT RISER.
21.2" COPPER WATER SERVICE. INSTALL WITH 7.5' MIN COVER. COORDINATE
LOCATION AND ELEVATION WITH ARCHITECTURAL/PLUMBING PLANS.
VERIFY ELEVATIONS PRIOR TO CONSTRUCTION.
22.REMOVE AND REPLACE STORM SEWER IN-KIND IF REQUIRED FOR UTILITIES
CONSTRUCTION.
23.TIPOUT D412 CURB & GUTTER (8 LF).
24.CURB & GUTTER TAPER.
25.18" RIBBON CURB.
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
E
D
S
D D
S
S
D
S
D HY DCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLFIBER FIBER FIBER
FIBER FIBER FIBER
FIBERCBLCBLCBLCBLCBLCBLCBLCBL
GAS GAS GAS GAS GAS GAS GAS GAS
FIBER FIBER FIBER FIBER FIBER FIBER
GASGASGASGASGASGASGASGASGASGASGASGASGASGASFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERllGAS GAS
EEE
E E E E E E>>>>>>>>>>>>>>>>H H
HH
H H
HH
H H H
H
H
X
XXAC
AC
AC
X
XXXXXG
OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW OHW
OHW
OHWOHWOHWOHWOHWOHWH
H>>>>>>E
M
MM
M
T
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>lllllllllll>>>>>>>>>>>>>>>>>>lllllllllllllllll>>>>lWV>>>>OHW
OHW
OHW
OHW
E>>>>>>>>>>>>>>>>>>>>>>
>
910.50
908.50
D
D
D
DDD
TW 918.00 TW 920.50
TW 916.50 TW 916.00 TW 915.00
TC 914.14
TC 912.66
TC 912.07TC 911.03TC 910.55
TC 910.94
TC 910.51
TC 910.70
TC 910.39
TC 908.97
TC 908.09TC 908.65
CC 908.74CC 908.87
TC 909.24
TC 909.24
TC 909.50
TC 910.02
TC 910.62
TC 910.50 CC 910.50
CC 910.50CC 910.50
CC 910.50
CC 910.18
CC 910.50
CC 910.50
TC 911.00
TC 911.51
TC 912.08 TC 911.50
TC 912.68
TC 913.41
CC 910.10
TC 910.74
CC 910.36
TC 910.28
TC 910.36
CC 910.10
CC 910.50
CC 910.50
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
ADJUST
CLEANOUT
PROVIDE AND INSTALL NEW CASTING
AND ADJUSTING RINGS
NEENAH R3067-C
MATCH EXISTING RIM EL
ADJUST
CURB BOX
TC 909.67
TC 909.35
TC 909.17
TC 910.56
TC 910.48
1' WIDE MIN BERM @ EL 910.50
ALONG NORTH PERIMETER OF FILTRATION BASIN
TB 909.25
TB 909.38
TB 909.50
CC 910.50
TC 910.28
PROVIDE AND INSTALL NEW MH COVER,
ADJUSTING RINGS AND CASTING
NEENAH R1642
CONNECT TO EXIST MH (TYP 2)
CC 910.48
CONNECT ROOF DRAIN TO MH 2
COORDINATE WITH ARCHITECTURAL
BASIN B-1
BOTTOM EL = 908.50
100 YR EL = 909.89
EMERGENCY OVERFLOW IS THROUGH
WESTERN RAIN GUARDIAN AND
NORTH IN THE CURB LINE EL = 910.20
BASIN B-2
BOTTOM EL = 905.50
100 YR EL = 907.35
EMERGENCY OVERFLOW IS ON
EAST SIDE BASIN EL = 908.0
9
2
2
920
915
912911909910910 911
9
1
0910911 909
908
908
909
90
8907909
916
915
912
911
910
910
915
906
908
9
0
8
90
9
910
911
913
914
911
910
909
909
910910
910 912 910131 LF 6" UNDERDRAIN PIPE
INV EL 908.0
INV EL 908.0
RAIN GUARDIAN
FL EL 909.65
OUTLET EL 908.65
RAIN GUARDIAN
FL EL 910.0
OUTLET EL 909.0
12" DIA NYLOPLAST DRAINAGE STRUCTURE
WITH 12" DOME GRATE
TOP PIPE EL 909.4
INV EL 906.5
16 LF 6" PVC
MH 1 (48" DIA)
TC EL 909.95
INV EL 906.0
NEENAH R1642
MH 2 (48" DIA)
TC EL 909.76
INV EL 905.24
NEENAH R1642
EXIST MH 3
TC EL 908.45
INV EL 904.44
12" DIA NYLOPLAST DRAINAGE STRUCTURE WITH 12" DOME GRATE
TOP PIPE EL 907.0
INV EL 904.5
19 LF 12" PVC
106 LF 12" RCP @ 0.7%
108 LF 12" RCP @ 0.7%
10 LF 6" UNDERDRAIN
INV EL 904.5
CONNECT TO NYLOPLAST DRAINAGE STRUCTURE
RAIN GUARDIAN
FL EL 907.50
OUTLET EL 906.5
0 4020
SCALE IN FEETMODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C3
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C03.DWG9/30/2022 8:23:25 AMLIFT BRIDGE BUILDERS
9/30/2022 8:26:01 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
5
GRADING, EROSION CONTROL
AND DRAINAGE PLANBHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
ELEVATION NOTES:
1.PROPOSED ELEVATIONS SHOWN ARE TO FINAL GRADE. TOP OF
BITUMINOUS, TOP OF CONCRETE, TOP OF CURB, TOP OF TOPSOIL, ETC.
CC = TOP OF CONCRETE
FFE = FINISHED FLOOR
TB = TOP OF BITUMINOUS
TC = TOP BACK OF CURB
TS = TOP OF TOPSOIL
TW = TOP OF WALL (TOP OF WALL SHOWN FOR
REFERENCE/APPROXIMATE ONLY.
SEE STRUCTURAL PLANS FOR RETAINING WALL DESIGN AND LAYOUT.)
LEGEND
PROPERTY BOUNDARY
CURB AND GUTTER
BITUMINOUS PAVEMENT
CONCRETE PAVEMENT
IRON-ENHANCED FILTRATION BASIN
STORM STRUCTURE
SIGN
SANITARY MANHOLE
WATER VALVE
SANITARY PIPE
WATER PIPE
STORM PIPE
UNDERDRAIN PIPE
SURFACE WATER FLOW DIRECTION
INLET PROTECTION
SILT FENCE
TRACKING PAD
D
S
>
W
>>
>>>
GENERAL NOTES:
1.CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING
UTILITIES PRIOR TO CONSTRUCTION.
2.CONTRACTOR TO MAINTAIN EROSION CONTROL
PRACTICES THROUGHOUT DURATION OF PROJECT.
3.CONTRACTOR TO ENSURE ADA COMPLIANCE FOR ALL
ACCESSIBLE PARKING STALLS, RAMPS, LANDINGS AND
WALK ROUTES.
4.ACCESSIBLE ROUTE. CROSS-SLOPE NOT TO EXCEED 2%
AND LONGITUDINAL SLOPE NOT TO EXCEED 5% (1:20).
5.ACCESSIBLE PARKING. SLOPE NOT TO EXCEED 2% IN
ANY DIRECTION.
EROSION CONTROL QUANTITIES
ITEM UNIT QUANTITY
SILT FENCE LF 420
INLET PROTECTION EA 1
TRACKING PAD EA 2
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
E
D
S
D D
S
S
D
S
D HY DH H
HH
H H
HH
H H H
H
H
X
XXAC
AC
AC
X
XXXXXOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW OHW
OHW
OHWOHWOHWOHWOHWOHWH
H
E
M
MM
M
T
OHW
OHW
OHW
OHW
E
D
D
D
DDD
EXISTING BUILDING OMAHA AVENUE60TH STREET NORTH
EXISTING
BUILDING
TRAFFIC DIRECTIONAL
FLOW ARROW (TYP)
SEE ARCHITECTURAL
FOR SIGNAGE PLAN (TYP)
0 4020
SCALE IN FEETMODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C4
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C04.DWG9/30/2022 8:23:33 AMLIFT BRIDGE BUILDERS
9/30/2022 8:26:13 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
6
TRAFFIC AND VEHICULAR MANAGEMENT PLANBHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
E
D
S
D D
S
S
D
S
D HY DH H
HH
H H
HH
H H H
H
H
X
XXAC
AC
AC
X
XXXXXOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW OHW
OHW
OHWOHWOHWOHWOHWOHWH
H
E
M
MM
M
T
OHW
OHW
OHW
OHW
E
NM
PC
CS
CS
CS
CS
D
D
D
DDD
NM
EXISTING BUILDING OMAHA AVENUE60TH STREET NORTH
EXISTING
BUILDING
0 4020
SCALE IN FEETMODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C5
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C05.DWG9/30/2022 8:23:28 AMLIFT BRIDGE BUILDERS
9/30/2022 8:26:20 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
7
LANDSCAPE PLANBHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
LEGEND
PROPERTY BOUNDARY
TURF RESTORATION WITH EROSION
CONTROL BLANKET
ROCK MULCH
IRON-ENHANCED FILTRATION BASIN
CONIFEROUS SHRUB
OVERSTORY DECIDUOUS TREE
ORNAMENTAL TREE
CONIFEROUS TREE
PLANT MATERIAL
COMMON NAME
BOTANICAL NAME QUANTITY ROOT TYPE SIZE
CONIFEROUS SHRUB
DWARF JUNIPER
JUNIPERUS PROCUMBENS 18 #5 CONT.10'-0" OC
OVERSTORY TREE
NORTHWOOD MAPLE
ACER RUBRUMI 'NORTHWOOD'2 B&B 2.5" CAL
ORNAMENTAL TREE
PRAIRIEFIRE CRAB
MALUS 'PRAIRIEFIRE'1 B&B 1.5" CAL
CONIFEROUS TREE
COLORADO BLUE SPRUCE
PICEA PUNGENS 4 B&B 6' HT
NM
PC
CS
PRAIRIEFIRE CRAB
ORNAMENTAL TREE
COLORADO BLUE SPRUCE
CONIFEROUS TREE
NORTHWOOD MAPLE
DECIDUOUS TREE
DWARF JUNIPER
CONIFEROUS SHRUB
POLY VINYL EDGER
FINISHED GRADE
6" TYP
4"
1
C5
SHRUB PLANTING
NO SCALE
PRUNE BACK BRANCHING STRUCTURE &
REMOVE ALL DEAD GROWTH
ROCK MULCH 3" MIN DEPTH
2-1/2" MAX ROCK SIZE
REMOVE TOP 1/3 OF BURLAP ON ROOT BALL OR
CONTAINER. IF CONTAINER IS NON-ORGANIC,
REMOVE COMPLETELY.
6" TYP
BACKFILL WITH PLANTING SOIL,
COMPACT SOIL UNDER ROOT BALL
TYPAR 3301 FILTER FABRIC WEED BARRIER
OR APPROVED EQUAL
WRAP TRUNK TO LOWER BRANCHES
WITH TREE WRAP AND SECURE
(FALL PLANTING AND DECIDUOUS TREES ONLY)
MULCH
CREATE SAUCER AROUND TREE
MAINTAIN TREE BASE AT OR SLIGHTLY HIGHER
THAN EXISTING GRADE TO ALLOW FOR SETTLEMENT
(2) T-BARS 1.58" X 1.58" X 0.2" X 8' LONG
DO NOT CUT MAIN LEADER
REMOVE DEAD AND BROKEN BRANCHES,
MAINTAIN NATURAL TREE FORM,
USE APPROVED TREE DRESSING ON ALL
ROOT AND BRANCH CUTS OVER 0.5" DIA
SCARIFY PIT BOTTOM (6" MIN)
COMPACTED TOPSOIL MIX
B&B ROOT BALL
CUT AND REMOVE
TOP 1/3 OF BURLAP FROM ROOT BALL
2
C5
TREE PLANTING
NO SCALE
5' ROCK MULCH
LANDSCAPE CALCULATIONS:
KEY MEASUREMENTS:
·LOT SIZE = 32,818 SF
·20% GREENSPACE REQUIRED = 6564 SF
·GREENSPACE SHOWN = 7425 SF
·(+)861 SF OVER REQUIRED GREENSPACE
TURF ESTABLISHMENT QUANTITIES
ITEM UNIT QUANTITY
EROSION CONTROL
BLANKET SY 510
2' ROCK MULCH
(BC TO BC)
NORTHWOOD MAPLE
DECIDUOUS TREE
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
MODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C6
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C06.DWG9/30/2022 8:23:35 AMLIFT BRIDGE BUILDERS
9/30/2022 8:26:26 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
8
DETAILS - 1BHEINRICH07/15/2022 11
2
C6
BITUMINOUS PAVEMENT SECTION
NO SCALE
1.5" BITUMINOUS PAVEMENT
WEAR COURSE
TACK COAT
1.5" BITUMINOUS PAVEMENT
BINDER COURSE
8" CLASS 5 AGGREGATE BASE
6" CLASS 5 AGGREGATE BASE
WIRE MESH: 6X6-W2.1XW2.1
6" MIN OVERLAP, 2" CLR
COMPACTED SUBGRADE
3
C6
CONCRETE PAD
NO SCALE
COMPACTED SUBGRADE
6" CONCRETE PAVEMENT
6"BWAH 7"9
C6
TIPOUT B STYLE CURB & GUTTER
NO SCALE
3" R1/2" R
MNDOT DESIGN STYLE B
GUTTER WIDTH (W)
12"18"24"
CURB HEIGHT CURB WIDTH CURB BACK DESIGN DESIGN DESIGN
(H)(A)(B)NO.NO.NO.
4"7-3/8"11-1/2"B412 B418 B424
6"8"13-1/2"B612 B618 B624
8"8-5/8"15-1/2"B812 B818 B824
3" R
2%
1/2" RAD
6"BWAH 7"8
C6
B STYLE CURB & GUTTER
NO SCALE
1/2" R
3" R1/2" R
MNDOT DESIGN STYLE B
GUTTER WIDTH (W)
12"18"24"
CURB HEIGHT CURB WIDTH CURB BACK DESIGN DESIGN DESIGN
(H)(A)(B)NO.NO.NO.
4"7-3/8"11-1/2"B412 B418 B424
6"8"13-1/2"B612 B618 B624
8"8-5/8"15-1/2"B812 B818 B824
3" R
3/4" PER FT
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
7
C6
CURB & GUTTER END TAPER
NO SCALE
PUBLI
C
R
O
A
D
1
C6
TRACKING PAD
NO SCALE
20' MI
N
WI
D
T
H
6" MIN
GEOTEXTILE FABRIC
UNDER ROCK
1" - 2" DIA WASHED ROCK
6" MIN DEPTH
4
0
'
M
I
N
L
E
N
G
T
H
18" MIN CUT OFF BERM
TO MINIMIZE RUNOFF FROM SITE
3'
TOP OF CURB ELEVATION
SHOWN ON PLANS (TYP)
VARI
E
S (
S
E
E
P
L
A
N
S)
5
C6
CURB & GUTTER TAPER
NO SCALE
MNDOT DESIGN STYLE D
DESIGN NO.GUTTER WIDTH (W)
D412 12"
D418 18"
D424 24"
D436 36"7-3/4"W12"4"7"1/2" R
10
C6
TIPOUT D STYLE CURB & GUTTER
NO SCALE
2%
6
C6
18" RIBBON CURB
NO SCALE 7"1/2" RAD1/2" RAD
18"
2%
4
C6
OMAHA AVENUE
BITUMINOUS PAVEMENT SECTION
NO SCALE
2" - SP 12.5 WEARING COURSE (SPWE240C)
TACK COAT
8" CLASS 5 AGGREGATE BASE
2" - SP 12.5 NON-WEARING COURSE (SPWE230B)
12" SELECT GRANULAR BORROW (AS NEEDED)
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
MODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C7
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C07.DWG9/30/2022 8:33:38 AMLIFT BRIDGE BUILDERS
9/30/2022 8:34:01 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
9
DETAILS - 2BHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
1
C7
NYLOPLAST DRAINAGE STRUCTURE
NO SCALE
3
C7
IRON-ENHANCED FILTRATION BASIN
NO SCALE
GENERAL NOTES:
1.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE RAIN GARDEN DURING OR
IMMEDIATELY FOLLOWING EXCAVATION, THIS MATERIAL SHALL BE REMOVED FROM
THE PRACTICE PRIOR TO CONTINUING CONSTRUCTION.
2.GRADING OF RAIN GARDENS SHALL BE ACCOMPLISHED USING LOW-COMPACTION
EARTH-MOVING EQUIPMENT TO PREVENT COMPACTION OF UNDERLYING SOILS.
3.ALL SUB MATERIALS BELOW THE RAIN GARDEN SHALL BE UNDISTURBED, UNLESS
OTHERWISE NOTED.
6"
1'-2'
6"
WIDTH PER PLAN
PLANT MATERIAL
UNDISTURBED, UNCOMPACTED
INSITU SOIL
3" SHREDDED WOOD MULCH
GEOTEXTILE
WRAP
UNDERDRAIN GRAVEL BLANKET
1"-1.5" DOUBLE WASHED STONE
AS NEAR VERTICAL
AS PRACTICAL
FILTRATION MEDIUM SHALL CONSIST OF
1.5' THICK WELL-BLENDED MIXTURE OF
MPCA FILTRATION MEDIA MIX C, WITH 5%-8%
OF THE SAND REPLACED WITH IRON FILINGS
MEETING THE MPCA REQUIREMENTS FOR
IRON FILTRATION MEDIA
60°
NOTES:
1.MAINTAIN 18" VERTICAL AND 24" HORIZONTAL
SEPARATION BETWEEN SEWER AND WATER
SERVICE LINES.
2.PROVIDE CURB BOXES THAT ARE IN CONCRETE
OR BITUMINOUS DRIVEWAYS WITH A SHORT TOP
SECTION OF A STANDARD GATE VALVE BOX
WITH A LID MARKED "WATER".
CORPORATION STOP
7.5' MIN
COVER
CL STREET
2
C7
BUILDING WATER SERVICE
NO SCALE
INSTALL CURB BOX AT PROPERTY LINE
FORD A1 COVER
CURB STOP
CURB BOX,
EXTEND TO
PROPOSED GRADE
INSTALL COPPER TO
VALVE AND CONTROL
PANEL BUILDING
PRECAST MANHOLE BLOCK
WM (LOCATION VARIES)
COPPER WATER SERVICE
WITH 12" GOOSENECK TO
PROVIDE SLACK
LEVEL 1 LINER: HDPE, 40 MIL MIN THICKNESS.
INSTALL PER MN STORMWATER MANUAL REQUIREMENTS.
PERFORATED UNDERDRAIN PIPE
6" MIN DIA WITH GEOTEXTILE WRAP
VARIABLE HEIGHT -
SEE SHEET C3 FOR
INVERT AND TOP OF
STRUCTURE
ELEVATIONS
6" SUMP
NYLOPLAST
COATED
DRAINAGE
STRUCTURE
RUBBERIZED
COATING
LIMITS
FRAME &
DOME
GRATE
NOTES:
1.CONFORM TO DETAIL BED-1 FOR PIPE BEDDING
2.SEE DETAIL 3-C7 FOR FILTRATION BASIN AND
UNDERTRAIN BEDDING DETAILS
UNDERDRAIN
INLETPVC OUTLET
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
MODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C8
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C08.DWG9/30/2022 8:23:22 AMLIFT BRIDGE BUILDERS
9/30/2022 8:26:37 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
10
DETAILS - 3BHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE
PROJECT DESCRIPTION/LOCATION
PROJECT IS LOCATED ON THE NEWLY-ACQUIRED PARKING LOT ADJACENT TO TIRE PROS, 14447 60TH ST NORTH,
OAK PARK HEIGHTS, MN. MAJOR ACTIVITIES INCLUDE CAR WASH CONSTRUCTION, ASPHALT PARKING LOT
CONSTRUCTION, AND FILTRATION BASIN CONSTRUCTION.
SOIL TYPES
SOIL TYPES TYPICALLY FOUND ON THIS PROJECT ARE LABELED AS URBAN SOILS PER WEB SOIL SURVEY.
SPECIAL AND IMPAIRED WATERS
THIS PROJECT IS WITHIN 1 MILE OF LILY LAKE, WHICH IS LISTED AS AN IMPAIRED WATER BY THE MPCA. IT IS LISTED
AS IMPAIRED BY MERCURY IN FISH. NO DISCHARGE RESTRICTION ARE LISTED ON THE IMPAIRED WATERS VIEWER.
MAP AVAILABLE UPON REQUEST.
RESPONSIBLE PARTIES
THE CONTRACTOR IS RESPONSIBLE FOR TRAINING REQUIREMENTS FOR PERMIT COMPLIANCE AND SUCCESSFUL
IMPLEMENTATION OF THE SWPPP AND INSTALLATION, INSPECTION, AND MAINTENANCE OF THE EROSION
PREVENTION AND SEDIMENT CONTROL BMPS DURING THE CONSTRUCTION AND UNTIL FINAL STABILIZATION HAS
BEEN REACHED AND NOTICE OF TERMINATION HAS BEEN FILED.
THE OWNER IS RESPONSIBLE FOR THE LONG TERM MAINTENANCE AND REPAIRS THAT MAY BE REQUIRED AFTER
THE PROJECT HAS CONCLUDED.
PROJECT CONTACTS
CONTRACTOR SWPPP DESIGNER MSCWMO CONTACT
TIM KRINGS CRISTINA HOLZER MATT DOWNING
LIFT BRIDGE BUILDERS STEVENS ENGINEERS 651-330-8220
715.459.4000 715.386.5819
MPCA DUTY OFFICER 24 HOUR EMERGENCY NOTIFICATION: 651-649-5451 OR 800-422-0798
LOCATION OF SWPPP REQUIREMENTS
SITE INSPECTION AND MAINTENANCE
CONTACT MSCWMD, MATT DOWNING, PRIOR TO BEGINNING ANY AN ALL CONSTRUCTION ACTIVITY FOR INITIAL
SWPPP INSPECTION.
THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL EROSION CONTROL MEASURES AS DETERMINED
NECESSARY DURING CONSTRUCTION OF THE PROJECT.
INSPECT THE ENTIRE CONSTRUCTION SITE A MINIMUM OF ONCE EVERY SEVEN DAYS DURING ACTIVE
CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS.
RAINFALL AMOUNTS MUST BE OBTAINED BY A PROPERLY MAINTAINED RAIN GAUGE INSTALLED ONSITE OR BY A
WEATHER STATION THAT IS WITHIN 1 MILE OR BY A WEATHER REPORTING SYSTEM. INSPECT ALL TEMPORARY AND
PERMANENT WATER QUALITY MANAGEMENT, EROSION PREVENTION, AND SEDIMENT CONTROL BMPS UNTIL THE
SITE HAS UNDERGONE FINAL STABILIZATION AND THE NOT HAS BEEN SUBMITTED. INSPECT CONSTRUCTION SITE
VEHICLE EXIT LOCATIONS FOR EVIDENCE OF TRACKING ONTO PAVED SURFACES. INSPECT SURROUNDING
PROPERTIES FOR EVIDENCE OF OFF SITE SEDIMENT ACCUMULATION. INSPECT INFILTRATION AREAS FOR SIGNS
OF SEDIMENT DEPOSITION AND COMPACTION (TO ENSURE THAT EQUIPMENT IS NOT BEING DRIVEN ACROSS THE
AREA).
REPLACE, REPAIR, OR SUPPLEMENT ALL NONFUNCTIONAL BMPS WITHIN 24 HOURS FOLLOWING DISCOVERY
UNLESS LISTED DIFFERENTLY BELOW:
1.REPAIR, REPLACE, OR SUPPLEMENT PERIMETER CONTROL DEVICES WHEN IT BECOMES NONFUNCTIONAL OR
SEDIMENT REACHES 1
2 THE HEIGHT OF THE DEVICE.
2.REPAIR OR REPLACE INLET PROTECTION DEVICES WHEN THEY BECOME NONFUNCTIONAL OR SEDIMENT
REACHES 1
2 THE HEIGHT AND/OR DEPTH OF THE DEVICE.
3.REMOVE TRACKED SEDIMENT FROM PAVED SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF
DISCOVERY. STREET SWEEPING MAY HAVE TO OCCUR MORE OFTEN TO MINIMIZE OFF SITE IMPACTS.
LIGHTLY WET THE PAVEMENT PRIOR TO SWEEPING.
4.MAINTAIN ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS GONE UNDER FINAL STABILIZATION, AND
NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE MSCWMD.
RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES IN WRITING WITHIN 24 HOURS. SUBMIT INSPECTION
REPORTS IN A FORMAT THAT IS ACCEPTABLE TO THE MSCWMO. INCLUDE THE FOLLOWING IN THE RECORDS OF
EACH INSPECTION AND MAINTENANCE ACTIVITY:
1.DATE AND TIME OF ACTIVITY
2.NAME OF PERSON(S) CONDUCTING INSPECTION
3.FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION AND CORRECTIVE ACTION NEEDED
4.CORRECTIVE ACTIONS TAKEN, INCLUDING DATES, TIMES AND PARTY COMPLETING THE WORK
5.DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5INCH IN 24 HOURS.
6.INCLUDE PHOTOGRAPHS AND DESCRIPTIONS OF ANY DISCHARGE DURING THE INSPECTION, IF APPLICABLE.
7.DOCUMENTS AND CHANGES MADE TO THE SWPPP
LAND FEATURE CHANGES
TOTAL EXISTING IMPERVIOUS SURFACE AREA: 0.43 AC (INCLUDES AGGREGATE AREAS)
TOTAL PROPOSED IMPERVIOUS SURFACE AREA: 0.55 AC
TOTAL NET CHANGE IN IMPERVIOUS SURFACE AREA: 0.12 AC
ENVIRONMENTAL REVIEW
THERE ARE NO STORMWATER MITIGATION MEASURES REQUIRED AS A RESULT OF AN ENVIRONMENTAL,
ARCHAEOLOGICAL, OR AGENCY REVIEW. THIS PROJECT IS NOT LOCATED IN A DRINKING WATER SUPPLY
MANAGEMENT AREA. THIS PROJECT IS NOT LOCATED IN A WELLHEAD PROTECTION AREA.
STABILIZATION TIMEFRAMES
1.INITIATE STABILIZATION IMMEDIATELY WHEN CONSTRUCTION HAS TEMPORARILY OR PERMANENTLY CEASED
ON ANY PORTION OF THE SITE. COMPLETE STABILIZATION OF THE GRADING AREAS WITHIN 7 DAYS OF
COMPLETION OF THAT SECTION. IN MANY INSTANCES THIS WILL REQUIRE STABILIZATION TO OCCUR MORE
THAN ONCE DURING THE COURSE OF THE PROJECT.
GENERAL SWPPP NOTES FOR CONSTRUCTION ACTIVITY
1.AMEND THE SWPPP AND DOCUMENT ANY AND ALL CHANGES TO THE SWPPP AND ASSOCIATED PLAN SHEETS
IN A TIMELY MANNER. STORE THE SWPPP AND ALL AMENDMENTS ONSITE AT ALL TIMES.
2.PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR THE ENGINEER'S ACCEPTANCE FOR CONCRETE
MANAGEMENT. SUBMIT SITE MANAGEMENT PLANS TO THE ENGINEER IN WRITING. WORK WILL NOT BE
ALLOWED TO COMMENCE UNTIL ACCEPTANCE HAS BEEN GRANTED.
3.DEWATERING IS NOT ANTICIPATED FOR THIS PROJECT. IF THE CONTRACTOR DETERMINES DEWATERING IS
REQUIRED, SUBMIT A DEWATERING PLAN FOR APPROVAL PRIOR TO COMMENCEMENT OF ANY DEWATERING
ACTIVITES. PLAN SHALL INCLUDE LOCATION OF DEWATERING, AND PROVIDE ALL REQUIRED BMPS FOR THE
DEWATERING ACTIVITY.
4.IT IS THE DESIGNER'S INTENT THAT THE CONTRACTOR BUILD BASINS AND INSTALL EROSION CONTROL BMPS
BEFORE PUTTING THEM INTO ACTIVE SERVICE TO THE MAXIMUM EXTENT PRACTICABLE.
5.BURNING OF ANY MATERIAL IS NOT ALLOWED WITHIN PROJECT BOUNDARY.
6.DO NOT DISTURB AREAS OUTSIDE OF THE CONSTRUCTION LIMITS.
7.ROUTE STORMWATER AROUND UNSTABILIZED AREAS OF THE SITE WHENEVER FEASIBLE. PROVIDE
VELOCITY DISSIPATION DEVICES AS NEEDED TO PREVENT EROSION.
8.THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE PLACED AS NECESSARY TO MINIMIZE
EROSION FROM DISTURBED SURFACES AND TO CAPTURE SEDIMENT ON SITE. ALL EROSION CONTROL
MEASURES SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF ANY REMOVAL WORK AND/OR GROUND
DISTURBING ACTIVITIES.
9.ESTABLISH SEDIMENT CONTROL DEVICES ON ALL DOWN GRADIENT PERIMETERS AND UPGRADIENT OF ANY
BUFFER ZONES BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. MAINTAIN SEDIMENT
CONTROL DEVICES UNTIL CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.
10.LOCATE PERIMETER CONTROL ON THE CONTOUR TO CAPTURE OVERLAND, LOW VELOCITY SHEET FLOW
DOWN GRADIENT OF ALL EXPOSED SOILS.
11.PROVIDE PERIMETER CONTROL AROUND ALL STOCKPILES. PLACE BMP A MINIMUM OF 5 FEET FROM THE TOE
OF SLOPE WHERE FEASIBLE.
12.PROTECT STORM SEWER INLETS AT ALL TIMES WITH THE APPROPRIATE INLET PROTECTION FOR EACH
SPECIFIC PHASE OF CONSTRUCTION. PROVIDE INLET PROTECTION DEVICES WITH EMERGENCY OVERFLOW
CAPABILITIES. SILT FENCE PLACED IN THE INLET GRATE IS NOT AN ACCEPTABLE INLET PROTECTION BMP
FOR GRADING OPERATIONS. INLET PROTECTION DEVICES MAY NEED TO BE PLACED MULTIPLE TIMES IN THE
SAME LOCATION OVER THE LIFE OF THE CONTRACT. KEEP ALL STORM SEWER INLET PROTECTION DEVICES
IN GOOD FUNCTIONAL CONDITION AT ALL TIMES.
13.PLACE CONSTRUCTION EXITS TO PREVENT TRACKING OF SEDIMENT ONTO PAVED SURFACES BOTH ON AND
OFF THE PROJECT SITE. PROVIDE CONSTRUCTION EXITS OF SUFFICIENT SIZE TO PREVENT TRACK OUT.
MAINTAIN CONSTRUCTION EXISTS WHEN EVIDENCE OF TRACKING IS DISCOVERED. REGULAR STREET
SWEEPING IS NOT AN ACCEPTABLE ALTERNATIVE TO PROPER CONSTRUCTION EXIT INSTALLATION AND
MAINTENANCE.
POLLUTION PREVENTION
1.PROVIDE A SPILL KIT ON THE SITE.
2.STORE ALL MATERIALS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS, PESTICIDES, HERBICIDES,
INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS UNDER COVER AND
WITH SECONDARY CONTAINMENT.
3.PROVIDE A SECURE STORAGE AREA WITH RESTRICTED ACCESS FOR ALL HAZARDOUS MATERIALS AND
TOXIC WASTE. RETURN ALL HAZARDOUS MATERIALS AND TOXIC WASTE TO THE DESIGNATED STORAGE
AREA AT THE END OF THE BUSINESS DAY UNLESS INFEASIBLE. STORE ALL HAZARDOUS MATERIALS AND
TOXIC WASTE (INCLUDING BUT NOT LIMITED TO OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT,
PETROLEUM BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) IN
SEALED CONTAINERS WITH SECONDARY CONTAINMENT. CLEAN UP SPILLS IMMEDIATELY.
4.STORE, COLLECT, AND DISPOSE OF ALL SOLID WASTE.
5.POSITION ALL PORTABLE TOILETS SO THAT THEY ARE SECURE AND CANNOT BE TIPPED OR KNOCKED OVER.
PROPERLY DISPOSE OF ALL SANITARY WASTE.
6.FUEL AND MAINTAIN VEHICLES IN A DESIGNATED CONTAINED AREA WHENEVER FEASIBLE. USE DRIP PANS
OR ABSORBENT MATERIALS TO PREVENT SPILLS OR LEAKED CHEMICALS FROM DISCHARGING TO SURFACE
WATER OR STORMWATER CONVEYANCES. PROVIDE A SPILL KIT AT EACH LOCATION THAT VEHICLES AND
EQUIPMENT ARE FUELED OR MAINTAINED AT.
7.LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA OF THE SITE. CONTAIN RUNOFF FROM THE
WASHING AREA TO A TEMPORARY SEDIMENT BASIN OR OTHER EFFECTIVE CONTROL. PROPERLY DISPOSE
OF ALL WASTE GENERATED BY VEHICLE AND EQUIPMENT WASHING. ENGINE DEGREASING IS NOT ALLOWED
ON THE SITE.
8.PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OF
CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION
MATERIALS. LIQUID AND SOLID WASHOUT WASTES MUST NOT CONTACT THE GROUND. DESIGN THE
CONTAINMENT SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR
CONTAINMENT AREA.
9.CREATE AND FOLLOW A WRITTEN DISPOSAL PLAN FOR ALL WASTE MATERIALS. INCLUDE IN THE PLAN HOW
THE MATERIAL WILL BE DISPOSED OF AND THE LOCATION OF THE DISPOSAL SITE. SUBMIT PLAN TO THE
ENGINEER.
10.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT DISCHARGE OR PLACEMENT OF
BITUMINOUS GRINDINGS, CUTTINGS, MILLINGS, AND OTHER BITUMINOUS WASTES FROM AREAS OF EXISTING
OR FUTURE VEGETATED SOILS AND FROM ALL WATER CONVEYANCE SYSTEMS INCLUDING INLETS AND CURB
FLOW LINES.
11.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT CONCRETE DUST, PARTICLES, CONCRETE
WASH OUT, AND OTHER CONCRETE WASTES FROM LEAVING THE SITE, DEPOSITING IN EXISTING AND FUTURE
VEGETATED AREAS, AND FROM ENTERING STORMWATER CONVEYANCE SYSTEMS INCLUDING INLETS AND
CURB FLOW LINES. USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT SAW CUT SLURRY FROM
LEAVING THE SITE AND FROM ENTERING STORMWATER CONVEYANCE SYSTEMS.
FILTRATION CONSTRUCTION NOTES
1.DO NOT STOCKPILE MATERIALS OR PARK EQUIPMENT OR VEHICLES IN A PROPOSED OR CONSTRUCTED
FILTRATION AREA. STAKE OFF OR OTHERWISE MARK OFF FILTRATION AREAS TO PREVENT HEAVY
CONSTRUCTION VEHICLES AND EQUIPMENT FROM DRIVING THROUGH.
2.DO NOT FULLY CONSTRUCT BASINS UNTIL ALL UPGRADIENT LAND DISTURBANCE ACTIVITY HAS BEEN
COMPLETED AND THE DRAINAGE AREA HAS BEEN STABILIZED. PROVIDE RIGOROUS EROSION PREVENTION
AND SEDIMENT CONTROL BMPS, INCLUDING MAINTENANCE OF THEM, IF THE FILTRATION AREA MUST BE
COMPLETELY EXCAVATED PRIOR TO COMPLETION OF GROUND DISTURBING ACTIVITIES.
3.DURING CONSTRUCTION, ROUTE ALL STORMWATER AROUND FILTRATION AREAS UNTIL ALL CONSTRUCTION
ACTIVITY HAS CEASED AND TRIBUTARY SURFACES ARE CLEANED OF SEDIMENT.
4.INSTALL SEDIMENT CONTROL BMPS AT THE TOP OF THE ADJACENT SLOPE IMMEDIATELY AFTER PLACEMENT
OF ENGINEERED TOPSOIL.
5.IF THE FILTRATION BASIN IS GOING TO BE USED FOR TEMPORARY SEDIMENT CONTROL, DO NOT INSTALL
UNDERDRAIN OR ENGINEERED MEDIA.
6.DO NOT DRAIN TURBID OR SEDIMENT LADEN WATER TO THE INFILTRATION AREA.
7.INSTALLATION OF THE FILTRATION BASINS SHALL OCCUR DURING PERIODS OF DRY WEATHER AND
COMPLETED BEFORE A RAINFALL EVENT TO THE GREATEST EXTENT PRACTICABLE. PLACEMENT OF
ENGINEERED SOILS SHALL BE ON DRY NATIVE SOIL ONLY.
8.EXCAVATION OF THE BASINS SHALL BE PERFORMED WITH A TOOTHED BUCKET.
9.THE BOTTOM EXCAVATION SURFACE SHALL BE LEVEL WITHOUT DIPS OR SWALES.
10.ENGINEERED SOILS SHALL REMAIN UNCONTAMINATED WITH NATIVE SOILS BEFORE AND DURING
INSTALLATION.
11.THE CONTRACTOR MAY NOT DRIVE ANY EQUIPMENT ON FINISHED FILTRATION AREAS OR ADJACENT SIDE
SLOPES. RESTORE DISTURBED FILTRATION AREAS AND ADJACENT SIDE SLOPES TO PRE DISTURBANCE
CONDITIONS WITHIN 24 HOURS. ANY RUTS OR DAMAGED TURF THAT COULD CREATE SEDIMENT DISCHARGE
TO FILTRATION AREAS MUST BE REPAIRED WITHIN 24 HOURS.
12.MATERIAL EXCAVATED FROM THE FILTRATION BASIN SHALL BE DISPOSED OF OFFSITE.
DESCRIPTION LOCATION
TEMPORARY/PERMANENT EROSION CONTROL MEASURES SHEETS C3, C5
DIRECTION OF FLOW SHEET C3
EROSION AND SEDIMENT CONTROL DETAILS SHEET C7
TURF ESTABLISHMENT AND FINAL RESTORATION SHEET C5
SITE MAP SHEET G1MODIFIED:PLOTTED:USER:CLH
CLH/BRH
BRH C9
S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C09.DWG9/30/2022 8:23:21 AMLIFT BRIDGE BUILDERS
9/30/2022 8:26:48 AMST. CROIX CARWASH
SITE IMPROVEMENT PLANS
OAK PARK HEIGHTS, MINNESOTA
CRISTINA L. HOLZER
CLH
CLH
CLH
CLH
07/15/2022
07/29/2022
08/18/2022
09/30/2022
CITY REVIEW
CITY REVIEW
WMO AND CITY REVIEW
CITY REVIEW
600-22-131
11
SWPPPBHEINRICH07/15/2022 11
DATENO
REVISIONS
BY DESCRIPTION DATENO
REVISIONS
BY DESCRIPTION
DRAWN BY
DESIGNED BY
APPROVED BY
DATE:REG NO:OF
PRINTED NAME:
SIGNATURE:DATE
PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR:
STEVENS ENGINEERS, INC.
642 BRAKKE DRIVE, SUITE 202
HUDSON, WISCONSIN 54016
PHONE: 1.715.386.5819
www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
10/18/2022 CLH CONSTRUCTION DRAWINGS
10-18-2022 56284