Loading...
HomeMy WebLinkAbout2022-10-18 Received Plans - Civil & Site EngineeringMODIFIED:PLOTTED:USER:CLH CLH/BRH BRH G1 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_G01.DWG9/30/2022 8:23:36 AMLIFT BRIDGE BUILDERS 9/30/2022 8:25:16 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 1 BOUNDARY AND TOPOGRAPHIC SURVEYBHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 MODIFIED:PLOTTED:USER:CLH CLH/BRH BRH G2 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_G02.DWG9/30/2022 8:47:42 AMLIFT BRIDGE BUILDERS 9/30/2022 8:48:05 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 2 CONSTRUCTION AND GENERAL NOTESBHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SEEDING NOTES: 1.TEMPORARY SEEDING IS DESIGNED TO CONTROL EROSION FOR A PERIOD OF ONE YEAR OR LESS AND IS GENERALLY REMOVED TO PERFORM FURTHER CONSTRUCTION ACTIVITES OR TO PERMANENTLY STABLIZE A CONSTRUCTION SITE. 2.PERMANENT SEEDING IS DESIGNED TO CONTROL EROSION FOR AN INDEFINITE PERIOD AFTER LAND DISTURBING ACTIVITIES HAVE CEASED ON THE SITE. 3.COVER CROP IS THE APPLICATION OF TEMPORARY SEED (ANNUAL) WITH PERMANENT SEEDING TO ESTABLISH QUICK GROUND COVER. 4.MULCHING IS DESIGNED TO COVER SOIL TO ABSORB THE EROSIVE IMPACT OF RAINFALL AND REDUCE THE FLOW VELOCITY OF RUNOFF. 5.APPLICATION RATES: TEMPORARY SEEDING: FALL (AUGUST 1 - OCTOBER 1) - MNDOT MIX 21-112 AT 100 LBS/ACRE SPRING/SUMMER (MAY 1 - AUGUST 1) - MNDOT MIX 21-111 AT 100 LBS/ACRE PERMANENT SEEDING: SITE SEEDING: MNDOT MIX 25-131 AT 220 LBS/ACRE INFILTRATION BASIN SEEDING: MNDOT MIX 25-131 AT 220 LBS/ACRE COVER CROP: FFALL (AUGUST 1 - OCTOBER 1) - MNDOT MIX 21-112 AT 100 LBS/ACRE SPRING/SUMMER (MAY 1 - AUGUST 1) - MNDOT MIX 21-111 AT 100 LBS/ACRE MULCHING: (DISC ANCHORED) MNDOT TYPE III AT 2 TONS/ACRE UTILITY CONSTRUCTION NOTES: 1.THE CITY OR IT'S DESIGNEE SHALL BE PRESENT FOR WATER AND SANITARY SERVICE CONNECTIONS TO CITY UTILITIES. 2.STORM SEWER THAT SERVES THE SITE IS PRIVATE AND WILL BE MAINTAINED BY OWNER. GRADING NOTES: 1.SITE GRADING/EXCAVATION/EMBANKMENT/COMPACTION SHALL USE ONLY SUITABLE MATERIAL AS APPROVED BY THE ENGINEER. REMOVE UNSUITABLE AND UNSTABLE MATERIALS INCLUDING BUT NOT LIMITED TO TOPSOIL, ORGANIC MATERIAL, AND DEBRIS FROM THE PAVEMENT AREAS. 2.BACKFILL ALL BELOW GRADE EXCAVATIONS IMMEDIATELY UPON REMOVAL OF THE UNSUITABLE SOILS. BACKFILL EXCAVATIONS ADJACENT TO EXISTING FEATURES PROMPTLY TO AVOID UNDERMINING ADJACENT AREAS. 3.EMBANKMENT BACKFILL MATERIAL IN BUILDING PADS AND PAVED AREAS SHALL BE COMPACTED TO 95% MODIFIED PROCTOR, EXCEPT THE TOP 3' WITHIN PAVED AREAS SHALL BE COMPACTED TO 100% MODIFIED PROCTOR. 4.THE SPECIFIED DENSITY METHOD OF COMPACTION IS REQUIRED FOR ALL PORTIONS OF PERMANENT CONSTRUCTION. STANDARD COMPACTION IS REQUIRED FOR ANY TEMPORARY CONSTRUCTION. 5.SALVAGE AND PROVIDE A MINIMUM DEPTH OF 6-INCHES OF TOPSOIL TO ALL AREAS DISTURBED BY CONSTRUCTION. 6.DISPOSE OF ALL REMOVED, UNSUITABLE, AND EXCESS MATERIALS OFF THE CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS, UNLESS OTHERWISE SPECIFIED. 7.PROPOSED SPOT ELEVATIONS AND CONTOURS ARE TO FINISHED GRADE. SPOT ELEVATIONS ARE DEFINED BY THE LEGEND. 8.PROVIDE A SMOOTH AND THOROUGH TRANSITION BETWEEN PROPOSED SITE GRADES AND DRAINAGE WAYS AND EXISTING SURROUNDING SITE GRADES AND DRAINAGE WAYS. 9.PROVIDE NECESSARY SOIL TESTING TO THE OWNERS SATISFACTION THAT COMPACTION LEVELS AND DEFINED SOIL GRADATIONS ARE BEING MET. 10.COMPLETE ALL PROPOSED CONSTRUCTION USING APPROVED MATERIALS, METHODS OF PLACEMENT AND TESTING AS REQUIRED BY ALL GOVERNING SPECIFICATIONS. 11.CARE MUST BE TAKEN DURING CONSTRUCTION AND EXCAVATION TO PROTECT ALL SURVEY MONUMENTS AND/OR PROPERTY IRONS ON AND ADJACENT TO THIS SITE. ALL MONUMENTS/IRONS DAMAGED DURING CONSTRUCTION WILL BE REPLACED/RESET BY THE CONTRACTOR AT NO COST TO THE OWNER. 12.REPAIR ALL DAMAGE TO EXISTING FACILITIES RESULTING FROM CONSTRUCTION ACTIVITIES AT NO COST TO THE OWNER. 13.SEQUENCE CONSTRUCTION ACTIVITIES TO MINIMIZE THE AMOUNT OF LAND DISTURBED. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL THE SITE HAS BEEN STABILIZED. 14.WRITTEN DIMENSIONS PREVAIL OVER SCALED DIMENSIONS. 15.1' VERTICAL CONTOUR INTERVAL. GENERAL NOTES: 1.THE CURRENT EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION GOVERNS EXCEPT AS MODIFIED BY THE PROJECT SPECIFICATIONS CITY OF OAK PARK HEIGHTS CODES, ORDINANCES, STANDARDS AND SPECIFICATIONS. 2.FURNISH, INSTALL, INSPECT, MAINTAIN AND REMOVE ALL NECESSARY TRAFFIC CONTROL SIGNAGE. ALL TRAFFIC CONTROL DEVICES AND SIGNAGE SHALL CONFORM TO ALL LOCAL, COUNTY AND STATE TRAFFIC CONTROL GUIDELINES, INCIDENTAL TO PROJECT. 3.SECURE ALL NECESSARY PERMITS AND NOTIFY ALL UTILITY COMPANIES WITH UTILITIES ON SITE PRIOR TO THE CONSTRUCTION OF THE PROJECT. ADHERE TO ALL APPLICABLE LOCAL, STATE, AND/OR FEDERAL LAWS FOR ANY COST INCURRED DUE TO THE DAMAGE OF SAID UTILITIES. 5.PROTECT ALL ITEMS WITHIN CONSTRUCTION LIMITS NOT DESIGNATED FOR REMOVAL OR MODIFICATIONS. THIS SHALL INCLUDE, BUT IS NOT LIMITED TO, CURB AND GUTTER, CONCRETE AND BITUMINOUS SURFACES, TREES, SIGNS, BUILDINGS, FENCES, ETC. 6.CONTRACTOR SHALL LOCATE AND/OR PROTECT ALL UTILITIES WITHIN CONSTRUCTION LIMITS NOT DESIGNATED FOR REMOVAL OR MODIFICATIONS. THIS SHALL INCLUDE, BUT IS NOT LIMITED TO, TELEPHONE, ELECTRICAL, GAS, CABLE TV, FIBER OPTIC, TOWERS, POWER POLES, LIGHT POLES, WATER, SEWER, OVERHEAD LINES, ETC. ANY DAMAGE TO EXISTING UTILITIES WILL BE REPAIRED IN-KIND AT THE EXPENSE OF THE CONTRACTOR. 7.THE INFORMATION ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATIONS AS TO THE TYPE AND LOCATION OF UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE TO THESE UTILITIES. CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL PRIOR TO CONSTRUCTION. 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 E D S D D S S D S D HY DCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLFIBER FIBER FIBER FIBER FIBER FIBER FIBERCBLCBLCBLCBLCBLCBLCBLCBL GAS GAS GAS GAS GAS GAS GAS GAS FIBER FIBER FIBER FIBER FIBER FIBER GASGASGASGASGASGASGASGASGASGASGASGASGASGASFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERllGAS GAS EEE E E E E E E 9 0 9 . 1 2 9 0 9 . 1 1>>>>>>>>>>>>>>>>H H HH H H HH H H H H H X XXAC AC AC X XXXXXG OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWOHWOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWH H>>>>>>E M MM M T >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>lllllllllll>>>>>>>>>>>>>>>>>>lllllllllllllllll>>>>lWV>>>>OHW OHW OHW OHW E EXISTING BUILDING OMAHA AVENUE60TH STREET NORTH EXISTING BUILDING 11 1 1 1 2 APPROXIMATE PROPERTY BOUNDARY (TYP) APPROXIMATE PROPERTY BOUNDARY (TYP) APPROXIMATE PROPERTY BOUNDARY (TYP) APPROXIMATE PROPERTY BOUNDARY (TYP)PROTECT TREESSALVAGE AND RELOCATE TREE IF NECESSARY FOR CONSTRUCTION PROTECT TREES 18" COTTONWOOD 22" COTTONWOOD 14" BOXELDER 30" COTTONWOOD 26" COTTONWOOD 10" ELM 10" ELM 20" ELM 8" ELM 10" ELM 10" ELM 16" ELM 8" ELM 14" ELM REMOVE GRAVEL CLEAR AND GRUB TREES AND VEGETATION 4 3 3 3 5 5 0 4020 SCALE IN FEETMODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C1 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C01.DWG9/30/2022 8:23:30 AMLIFT BRIDGE BUILDERS 9/30/2022 8:25:40 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 3 REMOVAL PLANBHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. LEGEND PROPERTY BOUNDARY REMOVE BITUMINOUS PAVEMENT REMOVE GRAVEL SAWCUT PAVEMENT REMOVE CURB AND GUTTER CLEAR AND GRUB TREE KEYNOTES: 1.SAWCUT PAVEMENT FULL DEPTH. 2.POWER POLES AND GUY WIRES TO BE RELOCATED BY OTHERS. 3.SAWCUT AND REMOVE BITUMINOUS AS REQUIRED FOR DRIVE CONSTRUCTION. 4.SAWCUT AND REMOVE BITUMINOUS AS REQUIRED FOR UTILITIES CONSTRUCTION. 5.SALVAGE CASTING AND PROVIDE TO CITY. 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 E D S D D S S D S D HY DCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLFIBER FIBER FIBER FIBER FIBER FIBER FIBERCBLCBLCBLCBLCBLCBLCBLCBL GAS GAS GAS GAS GAS GAS GAS GAS FIBER FIBER FIBER FIBER FIBER FIBER GASGASGASGASGASGASGASGASGASGASGASGASGASGASFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERllGAS GAS EEE E E E E E E>>>>>>>>>>>>>>>>H H HH H H HH H H H H H X XXAC AC AC X XXXXXG OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWH H>>>>>>E M MM M T >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>lllllllllll>>>>>>>>>>>>>>>>>>lllllllllllllllll>>>>lWV>>>>OHW OHW OHW OHW E APPROXIMATE PROPERTY BOUNDARY (TYP)>>>>>>>WWW W W W W D D D DDD EXISTING BUILDING OMAHA AVENUE60TH STREET NORTH EXISTING BUILDING APPROXIMATE PROPERTY BOUNDARY (TYP) 24' 32' 8' 10' 12' BYPASS LANE APPROXIMATE PROPERTY BOUNDARY (TYP) APPROXIMATE PROPERTY BOUNDARY (TYP) 18' 18' 18' 9' 9' 12' 9' 12' 1 2 3 5' 4 5 6 6 2 3 7 8 9 9 10 10 11 3 14 13 13 5 12 15 16 17 17 17 17 17 18 19 10' 10' 32' 2120 22 6 23 24 25 25 3 0 4020 SCALE IN FEETMODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C2 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C02.DWG9/30/2022 8:23:38 AMLIFT BRIDGE BUILDERS 9/30/2022 8:25:50 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 4 SITE DEVELOPMENT PLANBHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. LEGEND PROPERTY BOUNDARY CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE PAVEMENT IRON-ENHANCED FILTRATION BASIN STORM STRUCTURE SIGN SANITARY MANHOLE SANITARY SERVICE WATER SERVICE D S > W KEYNOTES: 1.RETAINING WALL BY OTHERS. (WALL SHOWN FOR REFERENCE ONLY. SEE STRUCTURAL PLANS FOR RETAINING WALL DESIGN AND LAYOUT). 2.B612 CURB AND GUTTER. 3.TIPOUT B612 CURB AND GUTTER. 4.DRIVEWAY B612 CURB AND GUTTER. 5.COMMERCIAL CONCRETE DRIVEWAY APRON. 6.CURB CUT FOR RAIN GUARDIAN TURRET. 7.CONCRETE DRIVE. 8.CONCRETE WALK. 9.PAVEMENT MARKING. 4" WHITE PAINT (TYP). 10.PAVEMENT MARKING, DIAGONAL, 4" WHITE PAINT (TYP). 11.PAVEMENT MARKING, ACCESSIBLE SYMBOL. 12.VAN ACCESSIBLE PARKING SIGN. 13.APPROXIMATE LOCATION OF VACUUM. 14.VEHICLE DISPLAY CONCRETE PAD. 15.CONNECT TO EXISTING 9" VCP CIPP LINED SANITARY SEWER WITH SADDLE. APPROX INV EL = 900.83. 16.CONNECT TO EXISTING 8" DIP CL 52 WATERMAIN WITH WET-TAP. 2" COPPER 2" CORP 2" CURB STOP & BOX 17.CURB & GUTTER END TAPER. 18.INSULATE WATER PIPE. 19.6" PVC SANITARY SERVICE. INSTALL WITH 1% MIN SLOPE AND 4' MIN COVER. COORDINATE LOCATION AND ELEVATION WITH ARCHITECTURAL/PLUMBING PLANS. VERIFY ELEVATIONS PRIOR TO CONSTRUCTION. 20.SANITARY SERVICE CLEANOUT RISER. 21.2" COPPER WATER SERVICE. INSTALL WITH 7.5' MIN COVER. COORDINATE LOCATION AND ELEVATION WITH ARCHITECTURAL/PLUMBING PLANS. VERIFY ELEVATIONS PRIOR TO CONSTRUCTION. 22.REMOVE AND REPLACE STORM SEWER IN-KIND IF REQUIRED FOR UTILITIES CONSTRUCTION. 23.TIPOUT D412 CURB & GUTTER (8 LF). 24.CURB & GUTTER TAPER. 25.18" RIBBON CURB. 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 E D S D D S S D S D HY DCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLCBLFIBER FIBER FIBER FIBER FIBER FIBER FIBERCBLCBLCBLCBLCBLCBLCBLCBL GAS GAS GAS GAS GAS GAS GAS GAS FIBER FIBER FIBER FIBER FIBER FIBER GASGASGASGASGASGASGASGASGASGASGASGASGASGASFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERllGAS GAS EEE E E E E E E>>>>>>>>>>>>>>>>H H HH H H HH H H H H H X XXAC AC AC X XXXXXG OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWH H>>>>>>E M MM M T >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>lllllllllll>>>>>>>>>>>>>>>>>>lllllllllllllllll>>>>lWV>>>>OHW OHW OHW OHW E>>>>>>>>>>>>>>>>>>>>>> > 910.50 908.50 D D D DDD TW 918.00 TW 920.50 TW 916.50 TW 916.00 TW 915.00 TC 914.14 TC 912.66 TC 912.07TC 911.03TC 910.55 TC 910.94 TC 910.51 TC 910.70 TC 910.39 TC 908.97 TC 908.09TC 908.65 CC 908.74CC 908.87 TC 909.24 TC 909.24 TC 909.50 TC 910.02 TC 910.62 TC 910.50 CC 910.50 CC 910.50CC 910.50 CC 910.50 CC 910.18 CC 910.50 CC 910.50 TC 911.00 TC 911.51 TC 912.08 TC 911.50 TC 912.68 TC 913.41 CC 910.10 TC 910.74 CC 910.36 TC 910.28 TC 910.36 CC 910.10 CC 910.50 CC 910.50 MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ADJUST CLEANOUT PROVIDE AND INSTALL NEW CASTING AND ADJUSTING RINGS NEENAH R3067-C MATCH EXISTING RIM EL ADJUST CURB BOX TC 909.67 TC 909.35 TC 909.17 TC 910.56 TC 910.48 1' WIDE MIN BERM @ EL 910.50 ALONG NORTH PERIMETER OF FILTRATION BASIN TB 909.25 TB 909.38 TB 909.50 CC 910.50 TC 910.28 PROVIDE AND INSTALL NEW MH COVER, ADJUSTING RINGS AND CASTING NEENAH R1642 CONNECT TO EXIST MH (TYP 2) CC 910.48 CONNECT ROOF DRAIN TO MH 2 COORDINATE WITH ARCHITECTURAL BASIN B-1 BOTTOM EL = 908.50 100 YR EL = 909.89 EMERGENCY OVERFLOW IS THROUGH WESTERN RAIN GUARDIAN AND NORTH IN THE CURB LINE EL = 910.20 BASIN B-2 BOTTOM EL = 905.50 100 YR EL = 907.35 EMERGENCY OVERFLOW IS ON EAST SIDE BASIN EL = 908.0 9 2 2 920 915 912911909910910 911 9 1 0910911 909 908 908 909 90 8907909 916 915 912 911 910 910 915 906 908 9 0 8 90 9 910 911 913 914 911 910 909 909 910910 910 912 910131 LF 6" UNDERDRAIN PIPE INV EL 908.0 INV EL 908.0 RAIN GUARDIAN FL EL 909.65 OUTLET EL 908.65 RAIN GUARDIAN FL EL 910.0 OUTLET EL 909.0 12" DIA NYLOPLAST DRAINAGE STRUCTURE WITH 12" DOME GRATE TOP PIPE EL 909.4 INV EL 906.5 16 LF 6" PVC MH 1 (48" DIA) TC EL 909.95 INV EL 906.0 NEENAH R1642 MH 2 (48" DIA) TC EL 909.76 INV EL 905.24 NEENAH R1642 EXIST MH 3 TC EL 908.45 INV EL 904.44 12" DIA NYLOPLAST DRAINAGE STRUCTURE WITH 12" DOME GRATE TOP PIPE EL 907.0 INV EL 904.5 19 LF 12" PVC 106 LF 12" RCP @ 0.7% 108 LF 12" RCP @ 0.7% 10 LF 6" UNDERDRAIN INV EL 904.5 CONNECT TO NYLOPLAST DRAINAGE STRUCTURE RAIN GUARDIAN FL EL 907.50 OUTLET EL 906.5 0 4020 SCALE IN FEETMODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C3 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C03.DWG9/30/2022 8:23:25 AMLIFT BRIDGE BUILDERS 9/30/2022 8:26:01 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 5 GRADING, EROSION CONTROL AND DRAINAGE PLANBHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. ELEVATION NOTES: 1.PROPOSED ELEVATIONS SHOWN ARE TO FINAL GRADE. TOP OF BITUMINOUS, TOP OF CONCRETE, TOP OF CURB, TOP OF TOPSOIL, ETC. CC = TOP OF CONCRETE FFE = FINISHED FLOOR TB = TOP OF BITUMINOUS TC = TOP BACK OF CURB TS = TOP OF TOPSOIL TW = TOP OF WALL (TOP OF WALL SHOWN FOR REFERENCE/APPROXIMATE ONLY. SEE STRUCTURAL PLANS FOR RETAINING WALL DESIGN AND LAYOUT.) LEGEND PROPERTY BOUNDARY CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE PAVEMENT IRON-ENHANCED FILTRATION BASIN STORM STRUCTURE SIGN SANITARY MANHOLE WATER VALVE SANITARY PIPE WATER PIPE STORM PIPE UNDERDRAIN PIPE SURFACE WATER FLOW DIRECTION INLET PROTECTION SILT FENCE TRACKING PAD D S > W >> >>> GENERAL NOTES: 1.CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 2.CONTRACTOR TO MAINTAIN EROSION CONTROL PRACTICES THROUGHOUT DURATION OF PROJECT. 3.CONTRACTOR TO ENSURE ADA COMPLIANCE FOR ALL ACCESSIBLE PARKING STALLS, RAMPS, LANDINGS AND WALK ROUTES. 4.ACCESSIBLE ROUTE. CROSS-SLOPE NOT TO EXCEED 2% AND LONGITUDINAL SLOPE NOT TO EXCEED 5% (1:20). 5.ACCESSIBLE PARKING. SLOPE NOT TO EXCEED 2% IN ANY DIRECTION. EROSION CONTROL QUANTITIES ITEM UNIT QUANTITY SILT FENCE LF 420 INLET PROTECTION EA 1 TRACKING PAD EA 2 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 E D S D D S S D S D HY DH H HH H H HH H H H H H X XXAC AC AC X XXXXXOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWH H E M MM M T OHW OHW OHW OHW E D D D DDD EXISTING BUILDING OMAHA AVENUE60TH STREET NORTH EXISTING BUILDING TRAFFIC DIRECTIONAL FLOW ARROW (TYP) SEE ARCHITECTURAL FOR SIGNAGE PLAN (TYP) 0 4020 SCALE IN FEETMODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C4 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C04.DWG9/30/2022 8:23:33 AMLIFT BRIDGE BUILDERS 9/30/2022 8:26:13 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 6 TRAFFIC AND VEHICULAR MANAGEMENT PLANBHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 E D S D D S S D S D HY DH H HH H H HH H H H H H X XXAC AC AC X XXXXXOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWH H E M MM M T OHW OHW OHW OHW E NM PC CS CS CS CS D D D DDD NM EXISTING BUILDING OMAHA AVENUE60TH STREET NORTH EXISTING BUILDING 0 4020 SCALE IN FEETMODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C5 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C05.DWG9/30/2022 8:23:28 AMLIFT BRIDGE BUILDERS 9/30/2022 8:26:20 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 7 LANDSCAPE PLANBHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. LEGEND PROPERTY BOUNDARY TURF RESTORATION WITH EROSION CONTROL BLANKET ROCK MULCH IRON-ENHANCED FILTRATION BASIN CONIFEROUS SHRUB OVERSTORY DECIDUOUS TREE ORNAMENTAL TREE CONIFEROUS TREE PLANT MATERIAL COMMON NAME BOTANICAL NAME QUANTITY ROOT TYPE SIZE CONIFEROUS SHRUB DWARF JUNIPER JUNIPERUS PROCUMBENS 18 #5 CONT.10'-0" OC OVERSTORY TREE NORTHWOOD MAPLE ACER RUBRUMI 'NORTHWOOD'2 B&B 2.5" CAL ORNAMENTAL TREE PRAIRIEFIRE CRAB MALUS 'PRAIRIEFIRE'1 B&B 1.5" CAL CONIFEROUS TREE COLORADO BLUE SPRUCE PICEA PUNGENS 4 B&B 6' HT NM PC CS PRAIRIEFIRE CRAB ORNAMENTAL TREE COLORADO BLUE SPRUCE CONIFEROUS TREE NORTHWOOD MAPLE DECIDUOUS TREE DWARF JUNIPER CONIFEROUS SHRUB POLY VINYL EDGER FINISHED GRADE 6" TYP 4" 1 C5 SHRUB PLANTING NO SCALE PRUNE BACK BRANCHING STRUCTURE & REMOVE ALL DEAD GROWTH ROCK MULCH 3" MIN DEPTH 2-1/2" MAX ROCK SIZE REMOVE TOP 1/3 OF BURLAP ON ROOT BALL OR CONTAINER. IF CONTAINER IS NON-ORGANIC, REMOVE COMPLETELY. 6" TYP BACKFILL WITH PLANTING SOIL, COMPACT SOIL UNDER ROOT BALL TYPAR 3301 FILTER FABRIC WEED BARRIER OR APPROVED EQUAL WRAP TRUNK TO LOWER BRANCHES WITH TREE WRAP AND SECURE (FALL PLANTING AND DECIDUOUS TREES ONLY) MULCH CREATE SAUCER AROUND TREE MAINTAIN TREE BASE AT OR SLIGHTLY HIGHER THAN EXISTING GRADE TO ALLOW FOR SETTLEMENT (2) T-BARS 1.58" X 1.58" X 0.2" X 8' LONG DO NOT CUT MAIN LEADER REMOVE DEAD AND BROKEN BRANCHES, MAINTAIN NATURAL TREE FORM, USE APPROVED TREE DRESSING ON ALL ROOT AND BRANCH CUTS OVER 0.5" DIA SCARIFY PIT BOTTOM (6" MIN) COMPACTED TOPSOIL MIX B&B ROOT BALL CUT AND REMOVE TOP 1/3 OF BURLAP FROM ROOT BALL 2 C5 TREE PLANTING NO SCALE 5' ROCK MULCH LANDSCAPE CALCULATIONS: KEY MEASUREMENTS: ·LOT SIZE = 32,818 SF ·20% GREENSPACE REQUIRED = 6564 SF ·GREENSPACE SHOWN = 7425 SF ·(+)861 SF OVER REQUIRED GREENSPACE TURF ESTABLISHMENT QUANTITIES ITEM UNIT QUANTITY EROSION CONTROL BLANKET SY 510 2' ROCK MULCH (BC TO BC) NORTHWOOD MAPLE DECIDUOUS TREE 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 MODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C6 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C06.DWG9/30/2022 8:23:35 AMLIFT BRIDGE BUILDERS 9/30/2022 8:26:26 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 8 DETAILS - 1BHEINRICH07/15/2022 11 2 C6 BITUMINOUS PAVEMENT SECTION NO SCALE 1.5" BITUMINOUS PAVEMENT WEAR COURSE TACK COAT 1.5" BITUMINOUS PAVEMENT BINDER COURSE 8" CLASS 5 AGGREGATE BASE 6" CLASS 5 AGGREGATE BASE WIRE MESH: 6X6-W2.1XW2.1 6" MIN OVERLAP, 2" CLR COMPACTED SUBGRADE 3 C6 CONCRETE PAD NO SCALE COMPACTED SUBGRADE 6" CONCRETE PAVEMENT 6"BWAH 7"9 C6 TIPOUT B STYLE CURB & GUTTER NO SCALE 3" R1/2" R MNDOT DESIGN STYLE B GUTTER WIDTH (W) 12"18"24" CURB HEIGHT CURB WIDTH CURB BACK DESIGN DESIGN DESIGN (H)(A)(B)NO.NO.NO. 4"7-3/8"11-1/2"B412 B418 B424 6"8"13-1/2"B612 B618 B624 8"8-5/8"15-1/2"B812 B818 B824 3" R 2% 1/2" RAD 6"BWAH 7"8 C6 B STYLE CURB & GUTTER NO SCALE 1/2" R 3" R1/2" R MNDOT DESIGN STYLE B GUTTER WIDTH (W) 12"18"24" CURB HEIGHT CURB WIDTH CURB BACK DESIGN DESIGN DESIGN (H)(A)(B)NO.NO.NO. 4"7-3/8"11-1/2"B412 B418 B424 6"8"13-1/2"B612 B618 B624 8"8-5/8"15-1/2"B812 B818 B824 3" R 3/4" PER FT DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 7 C6 CURB & GUTTER END TAPER NO SCALE PUBLI C R O A D 1 C6 TRACKING PAD NO SCALE 20' MI N WI D T H 6" MIN GEOTEXTILE FABRIC UNDER ROCK 1" - 2" DIA WASHED ROCK 6" MIN DEPTH 4 0 ' M I N L E N G T H 18" MIN CUT OFF BERM TO MINIMIZE RUNOFF FROM SITE 3' TOP OF CURB ELEVATION SHOWN ON PLANS (TYP) VARI E S ( S E E P L A N S) 5 C6 CURB & GUTTER TAPER NO SCALE MNDOT DESIGN STYLE D DESIGN NO.GUTTER WIDTH (W) D412 12" D418 18" D424 24" D436 36"7-3/4"W12"4"7"1/2" R 10 C6 TIPOUT D STYLE CURB & GUTTER NO SCALE 2% 6 C6 18" RIBBON CURB NO SCALE 7"1/2" RAD1/2" RAD 18" 2% 4 C6 OMAHA AVENUE BITUMINOUS PAVEMENT SECTION NO SCALE 2" - SP 12.5 WEARING COURSE (SPWE240C) TACK COAT 8" CLASS 5 AGGREGATE BASE 2" - SP 12.5 NON-WEARING COURSE (SPWE230B) 12" SELECT GRANULAR BORROW (AS NEEDED) 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 MODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C7 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C07.DWG9/30/2022 8:33:38 AMLIFT BRIDGE BUILDERS 9/30/2022 8:34:01 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 9 DETAILS - 2BHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 1 C7 NYLOPLAST DRAINAGE STRUCTURE NO SCALE 3 C7 IRON-ENHANCED FILTRATION BASIN NO SCALE GENERAL NOTES: 1.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE RAIN GARDEN DURING OR IMMEDIATELY FOLLOWING EXCAVATION, THIS MATERIAL SHALL BE REMOVED FROM THE PRACTICE PRIOR TO CONTINUING CONSTRUCTION. 2.GRADING OF RAIN GARDENS SHALL BE ACCOMPLISHED USING LOW-COMPACTION EARTH-MOVING EQUIPMENT TO PREVENT COMPACTION OF UNDERLYING SOILS. 3.ALL SUB MATERIALS BELOW THE RAIN GARDEN SHALL BE UNDISTURBED, UNLESS OTHERWISE NOTED. 6" 1'-2' 6" WIDTH PER PLAN PLANT MATERIAL UNDISTURBED, UNCOMPACTED INSITU SOIL 3" SHREDDED WOOD MULCH GEOTEXTILE WRAP UNDERDRAIN GRAVEL BLANKET 1"-1.5" DOUBLE WASHED STONE AS NEAR VERTICAL AS PRACTICAL FILTRATION MEDIUM SHALL CONSIST OF 1.5' THICK WELL-BLENDED MIXTURE OF MPCA FILTRATION MEDIA MIX C, WITH 5%-8% OF THE SAND REPLACED WITH IRON FILINGS MEETING THE MPCA REQUIREMENTS FOR IRON FILTRATION MEDIA 60° NOTES: 1.MAINTAIN 18" VERTICAL AND 24" HORIZONTAL SEPARATION BETWEEN SEWER AND WATER SERVICE LINES. 2.PROVIDE CURB BOXES THAT ARE IN CONCRETE OR BITUMINOUS DRIVEWAYS WITH A SHORT TOP SECTION OF A STANDARD GATE VALVE BOX WITH A LID MARKED "WATER". CORPORATION STOP 7.5' MIN COVER CL STREET 2 C7 BUILDING WATER SERVICE NO SCALE INSTALL CURB BOX AT PROPERTY LINE FORD A1 COVER CURB STOP CURB BOX, EXTEND TO PROPOSED GRADE INSTALL COPPER TO VALVE AND CONTROL PANEL BUILDING PRECAST MANHOLE BLOCK WM (LOCATION VARIES) COPPER WATER SERVICE WITH 12" GOOSENECK TO PROVIDE SLACK LEVEL 1 LINER: HDPE, 40 MIL MIN THICKNESS. INSTALL PER MN STORMWATER MANUAL REQUIREMENTS. PERFORATED UNDERDRAIN PIPE 6" MIN DIA WITH GEOTEXTILE WRAP VARIABLE HEIGHT - SEE SHEET C3 FOR INVERT AND TOP OF STRUCTURE ELEVATIONS 6" SUMP NYLOPLAST COATED DRAINAGE STRUCTURE RUBBERIZED COATING LIMITS FRAME & DOME GRATE NOTES: 1.CONFORM TO DETAIL BED-1 FOR PIPE BEDDING 2.SEE DETAIL 3-C7 FOR FILTRATION BASIN AND UNDERTRAIN BEDDING DETAILS UNDERDRAIN INLETPVC OUTLET 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 MODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C8 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C08.DWG9/30/2022 8:23:22 AMLIFT BRIDGE BUILDERS 9/30/2022 8:26:37 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 10 DETAILS - 3BHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284 STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE PROJECT DESCRIPTION/LOCATION PROJECT IS LOCATED ON THE NEWLY-ACQUIRED PARKING LOT ADJACENT TO TIRE PROS, 14447 60TH ST NORTH, OAK PARK HEIGHTS, MN. MAJOR ACTIVITIES INCLUDE CAR WASH CONSTRUCTION, ASPHALT PARKING LOT CONSTRUCTION, AND FILTRATION BASIN CONSTRUCTION. SOIL TYPES SOIL TYPES TYPICALLY FOUND ON THIS PROJECT ARE LABELED AS URBAN SOILS PER WEB SOIL SURVEY. SPECIAL AND IMPAIRED WATERS THIS PROJECT IS WITHIN 1 MILE OF LILY LAKE, WHICH IS LISTED AS AN IMPAIRED WATER BY THE MPCA. IT IS LISTED AS IMPAIRED BY MERCURY IN FISH. NO DISCHARGE RESTRICTION ARE LISTED ON THE IMPAIRED WATERS VIEWER. MAP AVAILABLE UPON REQUEST. RESPONSIBLE PARTIES THE CONTRACTOR IS RESPONSIBLE FOR TRAINING REQUIREMENTS FOR PERMIT COMPLIANCE AND SUCCESSFUL IMPLEMENTATION OF THE SWPPP AND INSTALLATION, INSPECTION, AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS DURING THE CONSTRUCTION AND UNTIL FINAL STABILIZATION HAS BEEN REACHED AND NOTICE OF TERMINATION HAS BEEN FILED. THE OWNER IS RESPONSIBLE FOR THE LONG TERM MAINTENANCE AND REPAIRS THAT MAY BE REQUIRED AFTER THE PROJECT HAS CONCLUDED. PROJECT CONTACTS CONTRACTOR SWPPP DESIGNER MSCWMO CONTACT TIM KRINGS CRISTINA HOLZER MATT DOWNING LIFT BRIDGE BUILDERS STEVENS ENGINEERS 651-330-8220 715.459.4000 715.386.5819 MPCA DUTY OFFICER 24 HOUR EMERGENCY NOTIFICATION: 651-649-5451 OR 800-422-0798 LOCATION OF SWPPP REQUIREMENTS SITE INSPECTION AND MAINTENANCE CONTACT MSCWMD, MATT DOWNING, PRIOR TO BEGINNING ANY AN ALL CONSTRUCTION ACTIVITY FOR INITIAL SWPPP INSPECTION. THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL EROSION CONTROL MEASURES AS DETERMINED NECESSARY DURING CONSTRUCTION OF THE PROJECT. INSPECT THE ENTIRE CONSTRUCTION SITE A MINIMUM OF ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. RAINFALL AMOUNTS MUST BE OBTAINED BY A PROPERLY MAINTAINED RAIN GAUGE INSTALLED ONSITE OR BY A WEATHER STATION THAT IS WITHIN 1 MILE OR BY A WEATHER REPORTING SYSTEM. INSPECT ALL TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT, EROSION PREVENTION, AND SEDIMENT CONTROL BMPS UNTIL THE SITE HAS UNDERGONE FINAL STABILIZATION AND THE NOT HAS BEEN SUBMITTED. INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS FOR EVIDENCE OF TRACKING ONTO PAVED SURFACES. INSPECT SURROUNDING PROPERTIES FOR EVIDENCE OF OFF SITE SEDIMENT ACCUMULATION. INSPECT INFILTRATION AREAS FOR SIGNS OF SEDIMENT DEPOSITION AND COMPACTION (TO ENSURE THAT EQUIPMENT IS NOT BEING DRIVEN ACROSS THE AREA). REPLACE, REPAIR, OR SUPPLEMENT ALL NONFUNCTIONAL BMPS WITHIN 24 HOURS FOLLOWING DISCOVERY UNLESS LISTED DIFFERENTLY BELOW: 1.REPAIR, REPLACE, OR SUPPLEMENT PERIMETER CONTROL DEVICES WHEN IT BECOMES NONFUNCTIONAL OR SEDIMENT REACHES 1 2 THE HEIGHT OF THE DEVICE. 2.REPAIR OR REPLACE INLET PROTECTION DEVICES WHEN THEY BECOME NONFUNCTIONAL OR SEDIMENT REACHES 1 2 THE HEIGHT AND/OR DEPTH OF THE DEVICE. 3.REMOVE TRACKED SEDIMENT FROM PAVED SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY. STREET SWEEPING MAY HAVE TO OCCUR MORE OFTEN TO MINIMIZE OFF SITE IMPACTS. LIGHTLY WET THE PAVEMENT PRIOR TO SWEEPING. 4.MAINTAIN ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS GONE UNDER FINAL STABILIZATION, AND NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE MSCWMD. RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES IN WRITING WITHIN 24 HOURS. SUBMIT INSPECTION REPORTS IN A FORMAT THAT IS ACCEPTABLE TO THE MSCWMO. INCLUDE THE FOLLOWING IN THE RECORDS OF EACH INSPECTION AND MAINTENANCE ACTIVITY: 1.DATE AND TIME OF ACTIVITY 2.NAME OF PERSON(S) CONDUCTING INSPECTION 3.FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION AND CORRECTIVE ACTION NEEDED 4.CORRECTIVE ACTIONS TAKEN, INCLUDING DATES, TIMES AND PARTY COMPLETING THE WORK 5.DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5INCH IN 24 HOURS. 6.INCLUDE PHOTOGRAPHS AND DESCRIPTIONS OF ANY DISCHARGE DURING THE INSPECTION, IF APPLICABLE. 7.DOCUMENTS AND CHANGES MADE TO THE SWPPP LAND FEATURE CHANGES TOTAL EXISTING IMPERVIOUS SURFACE AREA: 0.43 AC (INCLUDES AGGREGATE AREAS) TOTAL PROPOSED IMPERVIOUS SURFACE AREA: 0.55 AC TOTAL NET CHANGE IN IMPERVIOUS SURFACE AREA: 0.12 AC ENVIRONMENTAL REVIEW THERE ARE NO STORMWATER MITIGATION MEASURES REQUIRED AS A RESULT OF AN ENVIRONMENTAL, ARCHAEOLOGICAL, OR AGENCY REVIEW. THIS PROJECT IS NOT LOCATED IN A DRINKING WATER SUPPLY MANAGEMENT AREA. THIS PROJECT IS NOT LOCATED IN A WELLHEAD PROTECTION AREA. STABILIZATION TIMEFRAMES 1.INITIATE STABILIZATION IMMEDIATELY WHEN CONSTRUCTION HAS TEMPORARILY OR PERMANENTLY CEASED ON ANY PORTION OF THE SITE. COMPLETE STABILIZATION OF THE GRADING AREAS WITHIN 7 DAYS OF COMPLETION OF THAT SECTION. IN MANY INSTANCES THIS WILL REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE DURING THE COURSE OF THE PROJECT. GENERAL SWPPP NOTES FOR CONSTRUCTION ACTIVITY 1.AMEND THE SWPPP AND DOCUMENT ANY AND ALL CHANGES TO THE SWPPP AND ASSOCIATED PLAN SHEETS IN A TIMELY MANNER. STORE THE SWPPP AND ALL AMENDMENTS ONSITE AT ALL TIMES. 2.PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR THE ENGINEER'S ACCEPTANCE FOR CONCRETE MANAGEMENT. SUBMIT SITE MANAGEMENT PLANS TO THE ENGINEER IN WRITING. WORK WILL NOT BE ALLOWED TO COMMENCE UNTIL ACCEPTANCE HAS BEEN GRANTED. 3.DEWATERING IS NOT ANTICIPATED FOR THIS PROJECT. IF THE CONTRACTOR DETERMINES DEWATERING IS REQUIRED, SUBMIT A DEWATERING PLAN FOR APPROVAL PRIOR TO COMMENCEMENT OF ANY DEWATERING ACTIVITES. PLAN SHALL INCLUDE LOCATION OF DEWATERING, AND PROVIDE ALL REQUIRED BMPS FOR THE DEWATERING ACTIVITY. 4.IT IS THE DESIGNER'S INTENT THAT THE CONTRACTOR BUILD BASINS AND INSTALL EROSION CONTROL BMPS BEFORE PUTTING THEM INTO ACTIVE SERVICE TO THE MAXIMUM EXTENT PRACTICABLE. 5.BURNING OF ANY MATERIAL IS NOT ALLOWED WITHIN PROJECT BOUNDARY. 6.DO NOT DISTURB AREAS OUTSIDE OF THE CONSTRUCTION LIMITS. 7.ROUTE STORMWATER AROUND UNSTABILIZED AREAS OF THE SITE WHENEVER FEASIBLE. PROVIDE VELOCITY DISSIPATION DEVICES AS NEEDED TO PREVENT EROSION. 8.THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE PLACED AS NECESSARY TO MINIMIZE EROSION FROM DISTURBED SURFACES AND TO CAPTURE SEDIMENT ON SITE. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF ANY REMOVAL WORK AND/OR GROUND DISTURBING ACTIVITIES. 9.ESTABLISH SEDIMENT CONTROL DEVICES ON ALL DOWN GRADIENT PERIMETERS AND UPGRADIENT OF ANY BUFFER ZONES BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. MAINTAIN SEDIMENT CONTROL DEVICES UNTIL CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 10.LOCATE PERIMETER CONTROL ON THE CONTOUR TO CAPTURE OVERLAND, LOW VELOCITY SHEET FLOW DOWN GRADIENT OF ALL EXPOSED SOILS. 11.PROVIDE PERIMETER CONTROL AROUND ALL STOCKPILES. PLACE BMP A MINIMUM OF 5 FEET FROM THE TOE OF SLOPE WHERE FEASIBLE. 12.PROTECT STORM SEWER INLETS AT ALL TIMES WITH THE APPROPRIATE INLET PROTECTION FOR EACH SPECIFIC PHASE OF CONSTRUCTION. PROVIDE INLET PROTECTION DEVICES WITH EMERGENCY OVERFLOW CAPABILITIES. SILT FENCE PLACED IN THE INLET GRATE IS NOT AN ACCEPTABLE INLET PROTECTION BMP FOR GRADING OPERATIONS. INLET PROTECTION DEVICES MAY NEED TO BE PLACED MULTIPLE TIMES IN THE SAME LOCATION OVER THE LIFE OF THE CONTRACT. KEEP ALL STORM SEWER INLET PROTECTION DEVICES IN GOOD FUNCTIONAL CONDITION AT ALL TIMES. 13.PLACE CONSTRUCTION EXITS TO PREVENT TRACKING OF SEDIMENT ONTO PAVED SURFACES BOTH ON AND OFF THE PROJECT SITE. PROVIDE CONSTRUCTION EXITS OF SUFFICIENT SIZE TO PREVENT TRACK OUT. MAINTAIN CONSTRUCTION EXISTS WHEN EVIDENCE OF TRACKING IS DISCOVERED. REGULAR STREET SWEEPING IS NOT AN ACCEPTABLE ALTERNATIVE TO PROPER CONSTRUCTION EXIT INSTALLATION AND MAINTENANCE. POLLUTION PREVENTION 1.PROVIDE A SPILL KIT ON THE SITE. 2.STORE ALL MATERIALS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS, PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS UNDER COVER AND WITH SECONDARY CONTAINMENT. 3.PROVIDE A SECURE STORAGE AREA WITH RESTRICTED ACCESS FOR ALL HAZARDOUS MATERIALS AND TOXIC WASTE. RETURN ALL HAZARDOUS MATERIALS AND TOXIC WASTE TO THE DESIGNATED STORAGE AREA AT THE END OF THE BUSINESS DAY UNLESS INFEASIBLE. STORE ALL HAZARDOUS MATERIALS AND TOXIC WASTE (INCLUDING BUT NOT LIMITED TO OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT, PETROLEUM BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) IN SEALED CONTAINERS WITH SECONDARY CONTAINMENT. CLEAN UP SPILLS IMMEDIATELY. 4.STORE, COLLECT, AND DISPOSE OF ALL SOLID WASTE. 5.POSITION ALL PORTABLE TOILETS SO THAT THEY ARE SECURE AND CANNOT BE TIPPED OR KNOCKED OVER. PROPERLY DISPOSE OF ALL SANITARY WASTE. 6.FUEL AND MAINTAIN VEHICLES IN A DESIGNATED CONTAINED AREA WHENEVER FEASIBLE. USE DRIP PANS OR ABSORBENT MATERIALS TO PREVENT SPILLS OR LEAKED CHEMICALS FROM DISCHARGING TO SURFACE WATER OR STORMWATER CONVEYANCES. PROVIDE A SPILL KIT AT EACH LOCATION THAT VEHICLES AND EQUIPMENT ARE FUELED OR MAINTAINED AT. 7.LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA OF THE SITE. CONTAIN RUNOFF FROM THE WASHING AREA TO A TEMPORARY SEDIMENT BASIN OR OTHER EFFECTIVE CONTROL. PROPERLY DISPOSE OF ALL WASTE GENERATED BY VEHICLE AND EQUIPMENT WASHING. ENGINE DEGREASING IS NOT ALLOWED ON THE SITE. 8.PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OF CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS. LIQUID AND SOLID WASHOUT WASTES MUST NOT CONTACT THE GROUND. DESIGN THE CONTAINMENT SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR CONTAINMENT AREA. 9.CREATE AND FOLLOW A WRITTEN DISPOSAL PLAN FOR ALL WASTE MATERIALS. INCLUDE IN THE PLAN HOW THE MATERIAL WILL BE DISPOSED OF AND THE LOCATION OF THE DISPOSAL SITE. SUBMIT PLAN TO THE ENGINEER. 10.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT DISCHARGE OR PLACEMENT OF BITUMINOUS GRINDINGS, CUTTINGS, MILLINGS, AND OTHER BITUMINOUS WASTES FROM AREAS OF EXISTING OR FUTURE VEGETATED SOILS AND FROM ALL WATER CONVEYANCE SYSTEMS INCLUDING INLETS AND CURB FLOW LINES. 11.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT CONCRETE DUST, PARTICLES, CONCRETE WASH OUT, AND OTHER CONCRETE WASTES FROM LEAVING THE SITE, DEPOSITING IN EXISTING AND FUTURE VEGETATED AREAS, AND FROM ENTERING STORMWATER CONVEYANCE SYSTEMS INCLUDING INLETS AND CURB FLOW LINES. USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT SAW CUT SLURRY FROM LEAVING THE SITE AND FROM ENTERING STORMWATER CONVEYANCE SYSTEMS. FILTRATION CONSTRUCTION NOTES 1.DO NOT STOCKPILE MATERIALS OR PARK EQUIPMENT OR VEHICLES IN A PROPOSED OR CONSTRUCTED FILTRATION AREA. STAKE OFF OR OTHERWISE MARK OFF FILTRATION AREAS TO PREVENT HEAVY CONSTRUCTION VEHICLES AND EQUIPMENT FROM DRIVING THROUGH. 2.DO NOT FULLY CONSTRUCT BASINS UNTIL ALL UPGRADIENT LAND DISTURBANCE ACTIVITY HAS BEEN COMPLETED AND THE DRAINAGE AREA HAS BEEN STABILIZED. PROVIDE RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROL BMPS, INCLUDING MAINTENANCE OF THEM, IF THE FILTRATION AREA MUST BE COMPLETELY EXCAVATED PRIOR TO COMPLETION OF GROUND DISTURBING ACTIVITIES. 3.DURING CONSTRUCTION, ROUTE ALL STORMWATER AROUND FILTRATION AREAS UNTIL ALL CONSTRUCTION ACTIVITY HAS CEASED AND TRIBUTARY SURFACES ARE CLEANED OF SEDIMENT. 4.INSTALL SEDIMENT CONTROL BMPS AT THE TOP OF THE ADJACENT SLOPE IMMEDIATELY AFTER PLACEMENT OF ENGINEERED TOPSOIL. 5.IF THE FILTRATION BASIN IS GOING TO BE USED FOR TEMPORARY SEDIMENT CONTROL, DO NOT INSTALL UNDERDRAIN OR ENGINEERED MEDIA. 6.DO NOT DRAIN TURBID OR SEDIMENT LADEN WATER TO THE INFILTRATION AREA. 7.INSTALLATION OF THE FILTRATION BASINS SHALL OCCUR DURING PERIODS OF DRY WEATHER AND COMPLETED BEFORE A RAINFALL EVENT TO THE GREATEST EXTENT PRACTICABLE. PLACEMENT OF ENGINEERED SOILS SHALL BE ON DRY NATIVE SOIL ONLY. 8.EXCAVATION OF THE BASINS SHALL BE PERFORMED WITH A TOOTHED BUCKET. 9.THE BOTTOM EXCAVATION SURFACE SHALL BE LEVEL WITHOUT DIPS OR SWALES. 10.ENGINEERED SOILS SHALL REMAIN UNCONTAMINATED WITH NATIVE SOILS BEFORE AND DURING INSTALLATION. 11.THE CONTRACTOR MAY NOT DRIVE ANY EQUIPMENT ON FINISHED FILTRATION AREAS OR ADJACENT SIDE SLOPES. RESTORE DISTURBED FILTRATION AREAS AND ADJACENT SIDE SLOPES TO PRE DISTURBANCE CONDITIONS WITHIN 24 HOURS. ANY RUTS OR DAMAGED TURF THAT COULD CREATE SEDIMENT DISCHARGE TO FILTRATION AREAS MUST BE REPAIRED WITHIN 24 HOURS. 12.MATERIAL EXCAVATED FROM THE FILTRATION BASIN SHALL BE DISPOSED OF OFFSITE. DESCRIPTION LOCATION TEMPORARY/PERMANENT EROSION CONTROL MEASURES SHEETS C3, C5 DIRECTION OF FLOW SHEET C3 EROSION AND SEDIMENT CONTROL DETAILS SHEET C7 TURF ESTABLISHMENT AND FINAL RESTORATION SHEET C5 SITE MAP SHEET G1MODIFIED:PLOTTED:USER:CLH CLH/BRH BRH C9 S:\LIFT BRIDGE BUILDERS\600-22-131 TIRE PROS, OAK PARK HEIGHTS\DWG\SHEETS\LB60022131_C09.DWG9/30/2022 8:23:21 AMLIFT BRIDGE BUILDERS 9/30/2022 8:26:48 AMST. CROIX CARWASH SITE IMPROVEMENT PLANS OAK PARK HEIGHTS, MINNESOTA CRISTINA L. HOLZER CLH CLH CLH CLH 07/15/2022 07/29/2022 08/18/2022 09/30/2022 CITY REVIEW CITY REVIEW WMO AND CITY REVIEW CITY REVIEW 600-22-131 11 SWPPPBHEINRICH07/15/2022 11 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 10/18/2022 CLH CONSTRUCTION DRAWINGS 10-18-2022 56284