Loading...
HomeMy WebLinkAbout2022-10-25 CC Packet Enclosure0 Oak Park Heights Request for Council Action Meeting Date October 25th 2022 Time Required: 5 Minutes Agenda Item Title: SENIOR HOUSING PARTNERSNALLEY SENIOR SERVICE ALLIANCE (VSSA) FOR PLANNED UNIT DEVELOPMENT GENERAL PLAN CONDITIONAL USE PERMITS, PRELIMINARY AND FINAL PLAT, AND ARCHITECTURAL DESIGN GUIDELINES/SITE PLAN REVIEW OF THE AREA NORTH OF 58TH STREET AT NORWICH AVENUE Agenda Placement New Business Originating Department/Requestor: Eric Johnson, City Administrator Requester's Signature 441— Action Requested Discussion, Possible Action Background/Justification (Please indicate if any previous action has been taken or if other public bodies have advised): Please see the attached from Scott Richards, City Planner 1. Planning Report — dated: 10/6/22 2. Planning Commission — Summary Memo and Findings dated: 10/20/22 3. Proposed City Council Resolution. Page 25 of 118 TPC3801 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231.5840 Facsimile: 763.427.0520 TPC@Plannin9Co.com PLANNING REPORT TO: Enc Johnson FROM: Scott Richards DATE: October 6, 2022 RE: Oak Park Heights — Senior Housing Partners/Valley Senior Service Alliance — Planned Unit Development — General Plan, Conditional Use Permit, Subdivision, and Architectural Design Guideline/Site Plan Review TPC FILE: BACKGROUND Kevin Lohry, representing Senior Housing Partners/Valley Senior Service Alliance (VSSA), has submitted an application for Planned Unit Development (PUD) General Plan, Conditional Use Permits for multiple family development and building height, Preliminary and Final plat, and Architectural Design Guidelines/Site Plan Review for the development of the area north of 58th Street at Norwich Avenue North. The General Plan application includes the first phase of the development, a 79 -unit multiple family apartment building that will he constructed just north of existing parking lot on the subject property. The PUD General Plan, Preliminary and Final Plat and design review for the McKean Square Historic Village and the 58'° Street tunnel and parking was approved by the City Council on May 27, 2008. The remaining portion of the subject property was not part of Concept or General Plan approvals. The Concept Plan of the area north of 5$1h Street for the three phase development was approved by the City Council at their August 23, 2022, meeting. The review is based upon the following submittals: Exhibit 1: Project Narrative, July 12, 2022 Exhibit 2: Cover Sheet Exhibit 3: Site Vicinity Map Exhibit 4: Neighborhood Context Exhibit 5: Immediate Site Context — Boutwells Landing Exhibit 6: Architectural Context Exhibit 7: Project Benefits/Comprehensive Plan Page 26 of 118 Exhibit 8: Proposed Master Plan Exhibit 9: Cover Sheet (G100) Exhibit 10: Architectural Site Plan (AO10) Exhibit 11: Cover Sheet (COOO) Exhibit 12: General Notes (C100) Exhibit 13: Existing Conditions (V100) Exhibit 14: Existing Conditions (V101) Exhibit 15: Existing Conditions (V102) Exhibit 16: Existing Conditions (V103) Exhibit 17: Demo Plan Phase 1 (C200) Exhibit 18: Erosion and Sediment Control Plan Phase 1 (C300) Exhibit 19: Erosion and Sediment Control Plan Phase 1.2 (C301) Exhibit 20: Erosion and Sediment Control Details (C302) Exhibit 21: Overall Site Plan (C400) Exhibit 22: Site Plan Phase 1 (C401) Exhibit 23: Overall Grading Plan (C500) Exhibit 24: Grading Plan Phase 1 (C501) Exhibit 25: Overall Utility Plan (C600) Exhibit 26: Utility Plan Phase 1 (C601) Exhibit 27: Construction Details (C700) Exhibit 28: Landscape Title Sheet (1-1001) Exhibit 29: Tree Removals and Replacement Plan (LO02) Exhibit 30: Site Landscape Plans (1-100) Exhibit 31: Site Landscape Plans (1-101) Exhibit 32: Site Landscape Enlargements (1-150) Exhibit 33: Site Lighting Photometric Plan (E011) Exhibit 34: Lighting Specifications Exhibit 35: Boutwells Landing Second Addition Final Plat Exhibit 36: Traffic Memo — Kimley Horn Exhibit 37: Level 1 Overall Floor Plan (A101) Exhibit 38: Level 2 Overall Floor Plan (A102) Exhibit 39: Level 3 Overall Floor Plan (A103) Exhibit 40: Level 4 Overall Floor Plan (A104) Exhibit 41: Exterior Elevations (A401) Exhibit 42: Exterior Elevations (A402) Exhibit 43: Exterior Elevations (A403) Exhibit 44: Memo from City Arborist — Lisa Danielson Exhibit 45: Memo from City Engineer — Lee Mann PROJECT DESCRIPTION A project narrative has been provided by Kevin Lohry and as found as Exhibit 1. ISSUES ANALYSIS Adjacent Uses. Uses adjacent to the subject site are shown on the Site -Vicinity Map found as Exhibit 3. Page 27 of 118 Comprehensive Plan. The Comprehensive Plan 2018 Proposed Land Use Map designated this area as Residential/Business Transitional. This area has consistently been planned for a mixed use of business and residential uses. The current project is consistent with the plan. Zoning. This property has been zoned as B-4, Limited Business District which allows multiple family development with a Conditional Use Permit. As such, the underlying base zoning district is B-4, Limited Business District with a PUD overlay. The performance standards of the R-3 Multiple Family District must be complied with for residential development in the B-4 Limited Business District. The height of the proposed 79 unit building will be 49 feet, 3 inches. Buildings over three stories and 35 feet require a Conditional Use Permit. The review of the Conditional Use Permits is found later in this report. Subdivision. The preliminary/final plat for Boutwells Landing 2"d Addition was approved in 2008 by the City Council. During the current review process, it was realized that the plat was not recorded, and the property remains as Outlot C. The Subdivision and Zoning Ordinances do not allow development on an Outlot. The Applicants have provided a Final Plat of Boutwells Landing Second Addition for review. A preliminary plat will also need to be provided as a condition of approval. The Final Plat for Boutwells Second Addition, as well as the dedication and vacation of any easements, shall be subject to the review and approval of the City Engineer and City Attorney, Park Dedication/Connection Fees. Preliminary research on this indicates that all park dedication and connection fees were paid for the Boutwells Landing development south of 58"' Street but not to the north. The Development Agreement will outline the required park dedication and connection fees for this current project. Project Density/Open Space. Section 401.15.C.3 of the Zoning Ordinance establishes the density thresholds for residential properties. The multiple family requirement is 2,500 square feet per unit. The total property currently under consideration is 536,957 square feet. In Phase 1, the 79 unit building would require 197,500 square feet of area in that it will be multiple family. No details have been provided on numbers of units for the second and third phases, but the buildings may include senior housing which has a density requirement of 1,000 square feet per unit. The application materials also indicate that with 536,957 square feet of total area, 276,922 square feet, or 51.5 percent is pervious area in the overall master plan. The City does not have specific impervious/pervious requirements for development. Setbacks. Within a PUD, the R-3 District setback requirements are applied only to the perimeter of the project. The R-3 District specifies setback requirements as follows: 30 feet front yard, 30 feet rear yard, and 20 feet side yard. The conditional use permit requirements for buildings that exceed three stories also require the following: Page 28 of 118 For each additional story over three (3) stories or for each additional ten (10) feet above thirty-five (35) feet, front and side yard setback requirements shall be increased ten (10) feet. The Phase 1 building is proposed with an east side yard setback of 46 feet, a west side yard setback of 28 feet and rear yard setback of 60 feet. The west side setback is two feet short of meeting the 20 feet + 10 feet setback requirement, but this requirement can be addressed through the Planned Unit Development. The use to the west is Walmart. Both uses will not be impacted by the setback difference. The Planning Commission should discuss this variation. The PUD section of the Zoning Ordinance specifies that buildings should be located at least 20 feet from the back of a curb line from roadways as part of the internal street pattern. Additionally, the ordinance specifies that no building within the project shall be nearer to another building by one-half the sum of the building heights of the two buildings. Minimum Floor Area. The Zoning Ordinance requires that multi -family housing have the following minimum floor areas per unit: Efficiency and One Bedroom Units 600 square feet Two Bedroom Units 720 square feet The two bedroom units will be compliant with the requirements, but some of the alcove, or efficiency units will be 487 square feet. The alcove units would comply with the elderly requirement of at least 440 square feet per unit. All the one and two bedroom units are compliant. The size of the units can be addressed through the Planned Unit Development approvals. The Planning Commission should discuss this variation. Proposed Street Access. The site will be initially accessed through the existing driveway from the parking lot to the 58th Street. The parking lot will be expanded to accommodate parking for the Phase 1 building. Upon development of the other phases, an access will be provided at Norwich Avenue North. A traffic memo has been provided and is found as Exhibit 36. The City Engineer has provided a review of the traffic memo. The plans are subject to review and approval of the Fire Chief of the Bayport Fire Department and the Police Chief. Tralls/Sidewalks. A trail that enters the site from the north, between Walmart and Lowe's extends to the existing parking lot and to 58th Street. The trail will be relocated around the proposed building and connect to the parking lot and to 58th Street. The site will be well interconnected within and to the City system of trails and sidewalks. Tree Preservation/Landscaping. The Applicant has provided a tree removal and replacement plan as well as a landscape plan for Phase 1 of the development. The City Arborist has reviewed the plans with comments found as Exhibit 44. The plan shall be subject to the final approval of the City Arborist. Page 29 of 118 Grading and Drainage. Detailed grading and drainage plans have been provided as part of the development submittals. The City Engineer has provided a review of the plans found as Exhibit 45. The City Engineer and the Middle St. Croix Watershed Management Organization shall review and approve the grading and drainage plans. Utilities. A detailed utility plan has been submitted. The final utility plan is subject to review and approval of the City Engineer. Parking. The Zoning Ordinance requires at least two parking spaces per unit for multifamily structures. The Phase 1 plans indicate that no underground spaces will be provided. The existing lot will be reduced to 91 parking spaces and the expansion of the lot will add 63 spaces for a total of 154 parking spaces. The Phase 1 building will be 79 units, requiring 158 parking spaces. Representatives of Senior Housing Partners have indicated that the number of employees that use the lot is minimal. The additional parking area will be more than adequate. Staff asked the Applicant to consider fewer parking stalls or if some of the parking could be shown as proof of parking that would be constructed later if needed. The new lot will be expanded with an additional 12 spaces when subsequent phases are constructed. As part of the General Plan, the Applicant has reduced the number of stalls and included landscaped islands to address urban heat island mitigation. The proposed parking plan is adequate for Phase 1. The reduction of spaces from the requirement is allowed under the General Plan approvals. The Planning Commission should comment. Lighting. A lighting plan has been provided. The photometric plan indicates the locations of the light fixtures. The light intensity will be compliant with Zoning Ordinance standards. The lighting fixtures proposed are all full cut off and are also compliant. Signage. The Applicant has not provided a sign plan. Any signage for the new building shall be consistent with the size and height requirements of the Zoning Ordinance and with residential housing development signage. The signage plans shall be subject to review and approval of City Staff. Mechanical Equipment. The mechanical equipment shall be located within the buildings or at ground level. If any mechanical equipment is ground mounted or visible from adjacent streets shall be screened as required by the Zoning Ordinance. Trash/Recycling. All the trash storage and recycling will be internal to the building. Building Height. The proposed building will be four stories and 49 feet, three inches to the midpoint of the gable roof. As indicated, a Conditional Use Permit is required for buildings that exceed three stories and 35 feet. The Planning Commission should comment. 5 Page 30 of 118 Architectural Design Guidelines/Site Plan. The application materials indicate elevations and perspective diagrams for the proposed building. The building will be a combination of brick, lap siding, fiber cement panels and asphalt shingles. Multiple family buildings are not reviewed under the commercial Design Guideline requirements but under the building and architectural appearance requirements of Section 401.15.C.8. of the Zoning Ordinance. The Planning Commission and City Council shall comment further on the building appearance and materials as part of the review. A review of the building requirements is as follows: Multiple Family Containing Six (6) Units or More For New Construction: 1) Mass and Scale a) Each multiple family building containing six (6) or more dwelling units shall feature a variety of massing proportions, wall plane proportions, roof proportions and other characteristics similar in scale to those of single family detached dwelling units, so that such larger buildings can be aesthetically integrated into a lower density neighborhood. The following specific standards shelf also apply to such multiple family dwellings: Comment: The mass of the building is adequately broken into segments by changes and recesses in the building wall and the use of three different wall building materials. (1) Roofs. Each multiple family building will feature a combination of primary and secondary roofs. Primary roofs will be articulated by at least one (1) of the following elements: (a) Changes in piano and elevation. (b) Dormers, gables or clerestories. (c) Transitions to secondary roofs over entrances, garages, porches, bay windows. Comment: The roofline is broken by the front entrance dormer and roofs over the brick elements of the structure. (2) Facades and Walls. Each multiple family dwelling shall be articulated with projections, recesses, covered doorways, balconies, covered box or bay windows or other similar features, dividing large Page 31 of 118 facades and walls into human scaled proportions similar to the adjacent single family dwellings, and shall not have repetitive, monotonous, undifferentiated wall planes. Comment: The facades of the building are broken by the projections and recesses as well as the building material types. b) Each multiple family building shall feature walls that are articulated by at least two (2) of the following elements within every thirty (30) foot length of the facade: (1) Recesses, projections or significant offsets in the wall plane of at least four (4) feet. (2) Distinct individualized entrances with functional porches or patios. (3) Chimneys made of masonry, or other contrasting material that projects from the wall plan. (4) Balconies. (5) Covered bay or box windows. Comment: The building walls are adequately varied. b) Variation Among Repeated Buildings. For any development containing at least twenty-four (24) and not more than forty- eight (48) dwelling units, there will be at least two (2) distinctly different building designs. For any such development containing more than forty-eight (48) dwelling units, there will be at least three (3) distinctly different building designs. For all developments, there will be no more than two (2) similar buildings placed next to each other along a street or major walkway spine_ Comment: Only one building proposed at this time. c) Distinctly different building designs shall provide significant variation in footprint size and shape, architectural elevations and entrance features, within a coordinated overall theme of roof forms, massing proportions and other characteristics. To meet this standard, such variation shall not consist solely of different combinations of the same building features. 7 Page 32 of 118 Comment: Only one building proposed at this time. B-4, Limited Business Standards. Section 401.301.E.9 and 10 of the Zoning Ordinance provides the CUP standards for allowing residential use in the B-4 District. The standards are as follows: 9. Two family, townhomes and multiple family dwellings provided that. a. At least two parking spaces per unit must be provided for on site, or proof is shown of arrangements for private parking nearby. The development, as part of Phase 1 will be slightly under the requirements. The City has emphasized fewer parking stalls for certain developments to reduce the amount of unnecessary parking. b. No physical improvements, either interior or exterior, may preclude future re -use for commercial purposes. The development could be converted to future office use, but highly unlikely. c. Unit floor areas must comply with Section 401. f 5.C.6. All but the alcove units meet the requirements. The Planning Commission should comment. d. Compliance with conditional use requirements of Section 401.03.A.8. The requirements will be complied with. e. The development does not conflict with existing or potential future commercial uses and activities. There would be no conflict. f. The density, setbacks, and building height standards imposed as part of the R-3 Zoning District are complied with. The building setback to the west is not consistent. The Planning Commission should comment on the setbacks. g. Adequate open space and recreational space is provided on site for the benefit of the occupants. There will be adequate open space provided. h. The development does not conflict or result in incompatible land use arrangements as related to abutting residential uses or commercial uses. 8 Page 33 of 118 No incompatible land use arrangements are created. L Residential use can be governed by all applicable standards of the Zoning Ordinance, Building Code, Housing Code and Fire Codes. All standards will be complied with or approved as part of the General Plan. j. Residential and non-residential uses shall not be contained on the same floor. Not applicable. k. Residential uses shall be provided with a separate entrance, and separately identified parking stalls. Not applicable. 1. The architectural appearance, design and building materials of residential structures shall be consistent with the Design Guidelines and subject to approval of the City Council. The Planning Commission should comment on the architectural appearance. 10. Buildings in excess of three (3) stories or thirty-five (35) feet, provided that: a. The site is capable of accommodating the increased intensity of use. The site and surrounding uses can accommodate the 4th story and the proposed height of the structure. b. The increased intensity of use does not cause an increase in traffic volumes beyond the capacity of the surrounding streets. The surrounding streets are capable of addressing the increase in traffic volume. c. Public utilities and services are adequate. Public utilities and service have been planned to address development in this area. d. For each additional story over three (3) stories or for each additional ten (10) feet above thirty-five (35) feet, front and side yard setback requirements shall be increased ten (10) feet. The west side yard setback will be 28 feet, where 30 feet is required to accommodate the 4th story. Based upon the surrounding uses, the reduced 9 Page 34 of 118 setback should not create any issues. The Planning Commission should comment. e. The project shall comply with the Minnesota Sustainable Building 2030 (SB2030) energy standards and Minnesota Sustainable Building Guidelines (B3) or as amended. The building will be required to comply with all building requirements. f. There shall be no parking in the yards facing adjacent rights of way. The master site plan shows a building that will be constructed between the Phase 1 building and 58t1 Street. g. On the third and upper floors, windows and/or architectural features that provide interest shall be included on all four sides of the building when permitted within the building code. The building design meets the requirements of the Zoning Ordinance. h. Abrupt changes in building heights and/or roof orientation shall be diminished by offsets of building form and mass. The building design meets the requirements of the Zoning Ordinance. I. Recesses and projections to visually divide building surfaces into smaller scale elements shall be included. There are adequate recesses and projections in the building facade to break up the mass of the building. j. Color shall be used to visually reduce the size, bulk and scale of the building. Different colors of brick, lap siding and fiber cement panels reduce the mass and scale of the building. k. Buildings forty (40) feet or over shall provide rooflines with articulated features. The roofline is broken by the entrance dormer and the roofs over the brick sections of the building. 1. Location of back flow prevention devices and the Fre sprinkler riser shall be Identified on project plans submitted for site and design review and shall be located inside the building. The plans for building permit review shall address these issues. 10 Page 35 of 118 1 m. The provisions of Section 401.03.A.7 of this Ordinance are considered and satisfactorily met. The criteria are reviewed as follows. Conditional Use Permit Criteria. The conditional use permit criteria, found in Section 401.03.A.7 of the Zoning Ordinance, are found as follows: 1. Relationship to the specific policies and provisions of the municipal comprehensive plan. 2. The conformity with present and future land uses in the area. 3. The environmental issues and geographic area involved. 4. Whether the use will tend to or actually depreciate the area in which it is proposed. 5. The impact on character of the surrounding area. 6. The demonstrated need for such use. 7. Traffic generation by the use in relation to capabilities of streets serving the property. 8. The impact upon existing public services and facilities including parks, schools, streets, and utilities, and the City's service capacity. 9. The proposed use's conformity with all performance standards contained herein (i.e., parking, loading, noise, etc.). Comment: The Planning Commission should review the above criteria regarding the request for the conditional use permits with this application. City Staff sees no issues with the requests as proposed. Development Agreement. The Applicant shall be required to enter into an amended development agreement with the City should approval of the General Plan be granted. The development agreement shall be subject to review and approval of the City Attorney. CONCLUSION / RECOMMENDATION Subject to the preceding review, City staff recommends approval of the following listed requests for the development of the area north of 58"' Street at Norwich Avenue which includes a 79 -unit multiple family apartment building, subject to the conditions that follow: ® Planned Unit Development (PUD) General Plan ® Preliminary and Final Plat ® Conditional Use Permit for Multiple Family Development ® Conditional Use for Building Height ® Architectural Design Guidelines and Site Plan The Final Plat for Boutwells Second Addition, as well as the dedication and vacation of any easements, shall be subject to the review and approval of the City Engineer and City Attorney. A Preliminary Plat for Boutwells Second Addition shall be submitted subject to approval of the City Engineer and City Attorney. 11 Page 36 of 118 3. The Planning Commission and City Council should discuss the proposed east building setback of 28 feet, where 30 feet is required, and whether to allow this variation through the General Plan approvals. 4. The Planning Commission and City Council should discuss the proposed alcove units at 487 square feet, where 600 square feet is required, and whether to allow this variation through the General Plan approvals. 5. The tree removal, tree replacement and landscape plan shall be subject to review and approval of the City Arborist. 6. The grading and drainage plans shall be subject to City Engineer and the Middle St. Croix Watershed Management Organization approval. 7. All utility plans shall be subject to review and approval of the City Engineer. 8. The Planning Commission and City Council should discuss the reduction of parking spaces, where 154 spaces are provided and 158 spaces are required, and whether to allow this variation through the General Plan approvals. 9. The Fire Chief and Police Chief should review and approve the final plans to determine the accessibility of emergency vehicles throughout the development. 10. Any mechanical equipment that is ground mounted or visible from adjacent streets shall be screened as required by the Zoning Ordinance. 11. All trash and recycling storage shall be internal to the building. 12.The Planning Commission and City Council shall comment on the proposed building height. 13.The Planning Commission and City Council shall comment on the building appearance, colors, materials, and the variety between buildings. The Applicant shall provide a materials board for the buildings to be discussed at the Planning Commission and City Council meeting. 14.The Applicant shall be required to enter into an amended development agreement with the City should approval of the General Plan be granted. The development agreement shall be subject to review and approval of the City Attorney and City Council. 12 Page 37 of 118 SENIOR HOUSING ! PARTNERS PROJECT NARRATIVE DATE: July 12, 2022Tuesday, July 12, 2022 To: City of Oak Park Heights FROM: Kevin Lohry SUBJECT: Oak Park Heights Workforce Housing PROJECT SUMMARY AND PROPERTY DESCRIPTION Presbyterian Homes and Services (PHS) is excited and enthusiastic to apply for the development of a 63,000 SF, 79 -unit multi -family housing building just north of the intersection of 581 St. North and Norwich Ave Notch. The proposed development would take place on parcel 05.029.20.13.0010. PHS currently owns this parcel, which is north of the Boutwells Landing Senior Living Community. The site encompasses approximately 9.8 acres. The site currently holds a 36,000 SF parking lot, an entry road, sidewalks, and a 600 SF covered entry to an underground tunnel leading to Boutwells Landing Senior Living Community. A wetland is located on the west end of the property, which will be left untouched. The proposed multi- family housing building is primarily intended to provide workforce housing for PHS employees and the greater Oak Park Heights community. The development of workforce housing is an essential need for not only PHS employees, but community members as well. This mission behind this development is a brainchild of PHS working to mitigate the effects of an increasing gap between the affordability of housing and the wages earned by frontline workers. The lack of housing affordability can impact frontline workers' quality of life, potentially leading to lower morale and frequent turnover in search of even small increases in compensation. The housing will not be limited to PHS employees and is open to all applicants who may need alternative options to typical market rate housing, and are attracted to the beauty and opportunities that Oak Park Heights provides its residents. The site redevelopment will also contain related site amenities and improvements including increased parking, lighting, landscaping, sidewalks, tree planting and utilities. The site is currently zoned as B-4 — Limited Business District. PHS intends to keep the site zoned as B-4, and will apply for a Conditional Use permit to allow this multi -family project per 401.301.E of the Oak Park Heights Zoning Ordinance. PHS also owns the cast adjacent parcel 05.029.20.14.0128, which is not planned to be worked on during this project, but may be utilized for future projects. Page 38 of 118 SENIOR HOUSING PARTNERS PROJECT NARRATIVE The site is phenomenally located within the city of Oak Park Heights, providing residents and families with immediate walking access to retail shopping, grocery, and restaurants. Sidewalk connectivity will be emphasized to these retail areas, while also providing walkability to the natural landscapes of the wetland to the west, and to Autumn Hills Park to the southwest, This will help to provide residents with easy access to everyday necessities, while still offering a connection to the natural scenery of Oak Park Heights. Easy access to Highway 36 also provides potential residents ways to commute to and from work in the Twin Cities metro, but desire to five in the Oak Park Heights community. The design of the proposed 79 -unit development aims to tie into the design of the neighborhood, by creating similar color schemes, gables, and bays to those of Boutwells Landing Senior Living Campus to the south. This design is intended to create harmony with existing structures of the neighborhood, while also providing an attractive, modern, and enviable living experience for its residents. The proposed building and extended parking lot would replace a vacant, grassy field, and therefore does not create immediate impact on any existing, nearby structures, DEVELOPMENT DESCRIPTION The building will consist of stories of wood framed construction atop a concrete slab -on -grade. Each of the 4 levels will consist of approximately 15,750 SF. In order to achieve a mix of affordable price points, we are proposing a mix of housing options across unit size and affordability. The current unit mix proposed will include 26 studios, 29 1 -bedroom units, and 24 2 -bedroom units, for a total of 79 units. In order to provide price points more suited to the workforce demographic, we are continuing to optimize a unit mix that aims to include a certain percentage of units at either 60% AMI or 80% AMI (area median income). Building amenities currently include a fitness room, club room, outdoor patio, lobby, and a back of house area for employees. Page 39 of 118 SENIOR HOUSING PARTNERS PROJECT NARRATIVE The existing parking lot on the site includes 105 parking spaces, which seldom, if ever, reaches capacity. On-site reconnaissance and remarks from Boutwell's management show that the parking lot is rarely mote 1/3 full at peak hours. Therefore, we plan on adding 45 parking spaces to the existing parking lot for a total of 150 parking spaces. We anticipate that parking will fluctuate fairly evenly throughout the day, as employees park there during the day, and parking is planneresidents park there doting the evening/night. No underground d Stubs for water lines and sanitary sewers are already located on the south side of the site, while gas will be tapped from the east end of the site. Careful and meticulous planning has already gone into stormwater management, which will include a new stormwater basin east of the proposed building, and refrains from disturbing the wetland area. Future stormwater basins are also strategically planned for should any other development be proposed in the future. LOCATION AND PHASING The building was strategically placed on the north end of the site for several reasons. This particular area best utilizes the layout of the site while maintaining as much green space as possible. Any future work included on the site can then be more easily adapted and altered to make optimal use of utilities, parking, sidewalks, stormwater maintenance, and natural resources. The approximate 15,750 SF floor plate also lends itself to fit squarely inside the northern "notch" of the property, helping to efficiently utilize the layout of the property and its optimal connectivity and green space. There are no plans for any future development or master site plans. However, the design team has worked diligently to provide a proof of con eft for potential development options in the future. The idea behind this was to provide a plan to best utilize the natural landscaping, parking, utilities, etc, as discussed, but also to show why the northern location for our proposed project fits perfectly within the function and vision of the site. X01 Page 40 of 118 SENIOR HOUSING PARTNERS PROJECT NARRATIVE CONCLUSION Senior Housing Partners takes pride in its work and believes this workforce housing project will be a great benefit for those residents who wish to contribute to the Oak Park Heights community, but may be priced out of typical market rate living options. The building and site will provide an aesthetically attractive feature for the community while filling a need for many current and aspiring Oak Park Heights residents. Thank You For Your Consideration, Kevin Lohry Page 41 of 118 w U 7 Page 42 of 118 oma°OC N comE �c LU NZ fV ri A NO m� iGEm ty=�—^S = a U o, > N ii c E o 2IS:2 E `G K Op C� f414 mo Page 43 of 118 re I Ifs Ir trl �llfz- , 2 41V re I Ifs Page 45 of 118 �� � a J c 3: Zn a) m » L h C L a a� 3 r Do a) £°L _ d ° _a o omi n > mmUa 4) ) ° oc °Q o c ` EII° a'N roots ENm £ m c c •ov p0 EE2 £ m °morn rn� maE c°imc £ o oc 3'0 s3 mom£ V 7 C 10 a m 0.0 w '0 v v am- oEm E a o QL -0 3� Epp o�c� o m w A m0E 0c °md L m O U U > 3£ a) d :C .c L L O o3td c �o�o m c ° c o g m m m m tom mta 0)'o o� o a) m a°c �� ocz o o m a o °_p E c c am E m>c " p v �Ern'k O° Esc' m 0) m m e rum m °�mL c -`a ° £ °wmoo �G on£ c o o U o h 3 °° 3 3 y m o oz o c � m c m E m•- i) m m �a me �m o 0 0£ O crnrn m a x N a— a 7 'p C p N C £ m cw o Z E u ° CL �- O m 7 m C ° "a O d o 'R c C � L� Eo c > m °oma y� -° c3 o°m.mo co mm0 m m m +- pF a - Q m •R' t m mC E £ - CL cy p � O 0 �wc0 Q c000 .fig' cap QOU °"'3 .L -.L a '^ pm cmm uo 3 m a �a CO 3 ° 'a0a) > }_ C°§, 00 x075 oo � m° Ono mOp)o tz4£ Ec v3'c i5u PpNc memo 'ore o ° o m 0).40) 0 0 a i k E E £Omc c C3 cu .°mc£O tU'C 0oN a0 pE ccW 9) >r °°mc o mm m7 > C 'w C C a= 0�0� cp �O CL -0 � M�Um3Cc�N 0'�£O p Ea) � m 0 0 0 - a-0 CD Q on1616 o °`c »m omUa' 300�r W im 'Zadm 00 tiv 00 aE00 .3: micE>3 y.X�oc` c0 0a 0.- o°a°i£-a�°iQOyt.-mo m C "�i9�° �10c O)>w 4)m O0Oc�-y 3yaL 'E Wa� maw C 4) ��'OL U'O�b�c ��m6 0 z -p o•� ° o � o c E a>i 6 m C p o 2 i m£�O go 0am}3car stU ait LmmmmWma;m$) 3 oapi sa') o• No. �o. o. EO m0 a` O �� �U a 32 C U t co--; Page 47 of 118 co d H a 0 lw: N M3A.H]IMtlOn i Page 48 of 118 8 Mil r R w I I ! U C HI I Z I`Ir..r w z 0 : FZ- vS i CL W U =Z V5 0 a = Ir U Q O se W �/ �/ IJP en r Page 49 of 118 !✓��i�ld /��ELd I I ! HI I a, I`Ir..r Page 49 of 118 U_ Fg�t 5,9 �y'v GOA IIet9 $$ ! $ F--- — — Q Page 50 of 118 N _ 5 a z W 0 1n ( El � �a� � Enid 11,11,1 2 �W tlWEE tai SEE gfEWE Page 51 of 118 w E1 > c \Ica c 1 r C I lg4.li F 19i lI`P' I iff P '.u"1 f 11 III. ` 'PPI 1 e I alai$ fill lip! {�f ju �Psi, ° $RF B'` l willh jsf gf�! p 4 I EE 8l!�t��jti[j' a 4 p PI I1I(' it Eyj�°€S! t glli�pp p!f` g f ' ItPP ll6tp E 1s1 III � I�j'�1 EiI � � E6 P iPtE4 atiPii P� ill i�:4F I! ES� IE�'! 111 it Il { �$ R6 !3 i�i 'i� II f 1'$ �l irl Hil 1€I i $I ill ;$ Ill °;l I � ! I � P { fl P if in .!F I l11 og g� H11 !ri iii E��Eii �i I!I ill Ei I i�� i e ill I � i@ M� `E'jp 6�° i;� Ei i P I� if �1 $ $ ;li$ $i� °al; ! o i� P i •i i $ Ij E� f ;I 4�1 E 99 �f 4f� gg 11 �j' of I :. ttp �f$,!;, ,it �� I I�yI � $'�Il, � � ?! $� i I $l,$i �i 9 B�i ��$I I'Ei'r I If l ll f{ Nif if 1 I iFe O [ e � ! 1 411 � alfi i¢ '''! Itii°ir! f?,ryI9$ ii�I fP `IE�Eit�,e�r4li al4d [I�If .ai�$�sfal$!! aFP it aPP iEl aE tPl$if 14� s� s.ti 4�e '. ii .4� .� iNe alP e� e' Page 52 of 118 E 1i Page 53 of 118 Ali we aao Page 54 of 118 x, y , ;*1y, 1 we aao Page 54 of 118 Page 54 of 118 (t o ca a!"al, ! �it Sb h! iiuit 't Iii .t4 i fill Ewi@ fttls�lsilf.li JJ Ift!H I f i 1 m -- E ; �� —_—� .X1YOx y1xaRYy}StIJo -vn °x . )I� 0 �w {I JI I I I I I I I I I I i I I I I JII 1 I I I I I L_ 99if i� a Page 55 of 118 � I ,I 0 �w {I JI I I I I I I I I I I i I I I I JII 1 I I I I I L_ 99if i� a Page 55 of 118 s mefaa i�1# sej46? 99 iii =_ 1 ��aaaaaasgaaaaaaaaaaola u�oeaaao0a0o 0000000000 010:1:1111:8:1111::111 03CMDue ���98��889000a6 nn00000n00000n0000 ono 08909�11018�88 J0100900990808110000 00000 0000 0 ago 000000o00a0o0ao 99999999999Pi99999199999999999999999 ocoeoc00000000c0000cc00000c0000ne000 1' 0018�Oa0aa�0 OONOa0aa8a8899000aaa08a 000 00000 00000000o000h0o000000a0o0 00:00000 :11100::11011::::11111111: G9d99999999999�999999999999999ONE aoon000coocoocc000cnnnoccooncooccoco 010008: 00000009OaB0888000000 DOOM g008aa0000 (O 0000000000000000 0 u::1011:111::1::1::::1111::1:111:1:1 �IGOG61GIaBBGICIG019QIMIB0OEM [&a .0o0oa o[ala9aaa8888araN0��0auannn Mg ool000000e000o0 0000000�0 h999V2999999999999999999999999999999 ooncn0000000concannnooconovoon0000c IIGI�GIIGIGI�G�III�IC��GB81G��GI�9�BG 0000000001000o0o0a00o0a0a0100o00000 0111:111111111111110:1111111111:1 �� 18�11�9BB819V6B996011B��Q0�0097�09E - IGI991B9EG6EIi�81� fl�9611�GGIB��8�06 m0oaa0o0o000000000000010000000o:000 0111111111110111:1111:1:1:1:11:::0:1 99�999999999VH999999999 p189999�99 nocoeoA o000000nooc000000ce.c 300 1998@8@888989'8811198810888889888188 coo gal 011111:111111111111111111111:1111111 GNfll!BBIIIII1081fl1f10900B998B80B1111110809900 Jill noeoaooe000neon0000000enccoocc000coo i ■-�g77ulI m I Page 56 of 118 > i a iii! ��CD!■85�5�� ( �f�' � oa �' f6ieU.... Ge•67fe(�� Vol illIII Iii Page 57 of 118 yYe W�Qir i�l` I'i ;. A' _ �YL til L .� • �. iyj�. •^ i,) ` i het � ((,' �� •} l I A • II I ._ __. mix Imo. \ —Mn.7f'ifyll Page 57 of 118 A' Page 57 of 118 i 1v Page 58 of 118 C" 7 W Page 59 of 118 Ed z �[° g j814 1 jr 11,111/1119 , all W ` 9� i 0 Page 60 of 118 N o'i CO Page 61 of 118 a I wm I 11 If L sl Page 62 of 118 N '33 Ell Page 63 of 118 C> f IO liffifill E I U i 4 ! A' 1j I,I'-.1 1 !/!!! /\ -\\\ t =� i 1 • It rye` . ` ',' y�lil il�iii�i�ii��(����i� i i �;•�'' '1= „�'' J' `1 - E ! _ - ✓ _ ' 1 ` c I .Q. �AIB19A�1 q k ���,+/ — - — - — fir.-��x~• I, '1•' j k. S I: � i Ti bl ",i a f If, ° x _ a 1 L n I!C1 e 1�J0 . II . ti � CtS.Illlll Illllltll R. \ j� r i .l P L 1 hill IMTll1ill L" �4AL lllllltll lllllll 11 1 'r', /I 1i ' I L i � � 1f ✓� � l ll na `' ' �� II�i' Page 64 of 118 Page 65 of 118 .N Page 66 of 118 Eli = i= 111 an, fill] Page 67 of 118 rQ z 3 v m� f13i sBF#PF P P x p, 'F11 111 , 'list 1 1 ! i 411,11 I' i i g 1 ff li Jill YY Yip QbCD 0 oy Page 68 of 118 CN Yo asp �j yY y R �p� W °g LED o Yoysy � g' J E � 3911 aaa . � .wee ei Page 70 of 118 Page 71 of 118 i Ti g Page 71 of 118 Page 72 of 118 \= CN 5(j f 4 :p�gf� N Cu 5243 aCES J s �i i Page 72 of 118 Yw�vrr+rrwi��r..w..wwwrww Page 73 of 118 r W m =� m$ i Yw�vrr+rrwi��r..w..wwwrww Page 73 of 118 LUMINIS® TYPE UW QUANTn"e _ PRoaflcT: OAK PARK HEIGHTS `"TALO°NUMBER: LUMINIS-SY600-LIL25•R30 x367 -5-6-7 optional MATERIALS Sydos LED Is made of corrosion resistant 356 aluminum alloy with a copper (Cil) consent of less than 0.1%. The main housing Is made of seamless extruded aluminium, with an Integrally sealed LED light module designed for optimal heat disalpation, and igMing performance. Syrlos LED Is standard with a unique proprietary deslgn allowing the sealed LED module to Olt within the cylindrical housing. The top cast aluminum cover Includes ventilatlon slots allowing air circulation and cooling of assembly. Syrlos LW SY600 series Is standard with 302 optic. See options section for alternate selection ELECTRICAL DNVER Standard driver Is 0-10V dimming -ready (dims to 10%) with: 120-277 multi -wk compatibility (5(1301-1z), operating temperature, range of-4(rV-402F to 55°CA310F output over voltage Protection output over current protection and output short circuit protection with auto -recovery. LED Standard 4000K/SOCRI. Optional 2700K, 3000K 8 35001C Optional Amber LED for turtle sensitive areas. Wavelengths: 584Snm to 597nm. LIFE 60,000hrs L.B. (based on IESNA TM -21 Test Method and LM -80 data). Up to 70,000hre LB. (calculated projection from LM -80 data). FINISH Five -stage preparation process including preheating of cast aluminum parts for air extraction, and an environmentally friendly alloy sealant Polyester powder coating is applied through an electrostatic process and oven cured for Torg term finish SY600 SERIES SYRIOS - LED 6' WALL UP OR DOWN LIGHT I- Cast aluminum driver housing. Includes galvanized steel wall mount pressure plata. 2- Cast alumlrwm ventllated top cover. 3 -Seamless extruded aluminum cylindrical Musing. 4 -Fully sealed cast aluminum light assembly. 5 -Sealed cast aluminum lens frame. 6 -Clear tempered glass lens. 7- Faceted specular aluminum reflector. 8- Optional 380s adjustable rotation. All stainless steel hardware Syria LED light module Is designed with a tilting mechanism allowing forward and back light adjustability. The kW directional module allows to aim the light beam In the desired cilrection, without disturbing the hlminaire mounting. The module an be secured using the bulli In locking mechanism. Fully adjustable 3602 rotation also avallable, see option A360. Other adjustment factory set positions are avallable. Please consult factory. MOUNTING Maximum weight 91bs (4.1 kg) The mounting plate Is designed to fit on a 4" (102mm) octagonal electrical Mx using 31/2' (89mm) C/C mounting holes. Additional mounting holes am provided as per site requirements. CERTIFICATION Certified and Approved as per CSA C22.2 No_ 250.0 standard and ANSVUL 1598 standard, for wet location Rated IPS6. 5• j (127mm) I _ / 3.Z5• (152m0") (B2mn0 LUMINIS Toll free: 866.586.4647 Fax: 514583.8872 Email: info@luminis.com 260 Labrosse, Pointe -Claim (OC) Canada H9R 51-5 8.75' (222mm) 03E n• Qa6mm) L 11• J (26emrN Luminaires may be altered ter design improvumced of d1Lioe21nu.e13 Without prior notice B (OSIS Mounting LUMIMIS.COM Page 74 of 1118 1 got h a m' i E v 00 Multiple Layers of Light I Feature Set - Bounding Ray" optical design 2.5 SDCM; 95 CRI typical, 90+ CRI optional • Unitisd optics mechanically attach the light Fixtures am wet location, tweed telling engine to the Iowa reflector for complete Opti- cal alignment Available with 10% dimming, l%Owning, or dim to dark 45° cutoff to source and source image Batwing distribution with feathered edges • Fully serviDoWe and upgradeable lensed LED pmWdes even illminatlon on hor'vnntal and light engine vertical surfaces • 70% lumen maintenance at 60,000 hours ENERGY STARO certified product Distribution 3DDO w unanvvr mrroN When e1461NMa BW 65 SO 031101 OJUR 19S:W 1230 Superior Performance Luminalre Type: XD Catalog Number: 0 7C_tti 6AR. MYYD_l55 �4ra siac ._-- 250-I,O0luaea JUND-17,500 ae14N Naelaal hums 250 500 750 1000 1500 2000 2500 3DDO 3500 4000 4500 5000 60(X1 8000 10.00^ 12,000 15,000 17.50'1 Oe4rAed 297 519 778 "1 1471 home 2006 2537 3077 3542 4027 4533 5256 637: RM 10637 12332 15714 17x01 WAUP 3A 62 92 99 Ill J67 24.7 203 333 31.0 47.3 467 57.6 71.9 97.1 IMO 1509 175.3 Ln 87A 833 91.6 103.5 1001 Per Wait 193,1 1021 1013 1069 I03.3 953 1073 I10.6 1161 1093 1072 104.5 iC15 Coordinated Apertures I Multiple layers of Light General Illumination Layer 1 EVO Core Healthcare Special Applications EV06.OM pap 1 x69 IHigh Center Beare Layer I incite 1 Pownlek A*Ibbk It uuw Droner W. sh wdwag F" A. 1491 Srek91 hW9tkn Eu EVO+Intim —Multiple Layers or UgM r am 1`411911 Bevel Wfiwauk E__1 Illemp 07euk In"Seelta 9andd/hmper Clap Raw shm Satofto GMMARCHI1EtBMDQMagtlf M i 140OIaur Rmd Cx5va,&300121 POD-708S6arp371111 I Pdanow ngmm 02014-2MAcOBandrlaMl lac.AORlphhaned. RK05713Q2 Ra91a9+11am malmtu9WPwRMlnoNm Page 75 of 118 D -Series I Ak Aw DSXB_LED_16C_530 40K_SYM LED Bollard I "°`" OAK PARK HEIGHTS �f ► ggm + T ° x6 I dnser4es Specifications SllppedlnrteDed "pedbutalled Disrmt B' RoundH mouD 127' r: 012 O DS1®55 146nM11t M dD6h Az° 30K 3000K (106.7 on) iX I71®s' w.lghe 27 n7: r4o1( 1 4n W: (12..25kO DF DoM Am Accessories A"U AedWh hWU1' Introduction The D -Series LED Bollard is a stylish, energy- saving, long4ife solution designed to perform the way a bollard should—with zero uplight An optical leap forward, this full art -off luminaire will meet the most stringent of lighting codes. The D -Series LED Bollard's rugged construction, durable finish and long-lasting LEDs will provide years of maintenance -free service. EXAMPLE: DSXB LED 16C 700 40K SYM MVOLT DDBXD Will', SllppedlnrteDed "pedbutalled W= mouD 127' PE RCEWBt DS1®55 146nM11t 330 3507A 30K 3000K ASY fig iX I71®s' 430 Onju r4o1( 4U3K sYA DF DoM Am B 53 "M 5OR 5000iC D1116 go -low Rn,74MV 700 70OW ANBPC knbapherphm W24 16C MLD)d amnd kd E? "fatn H30 30"aea1l FqE: D�llm AMBLW AnbulknW W� H36 36'mall MqM D31BIm TatW:d yrmeknp7" t1rOK Accessories A"U AedWh hWU1' Introduction The D -Series LED Bollard is a stylish, energy- saving, long4ife solution designed to perform the way a bollard should—with zero uplight An optical leap forward, this full art -off luminaire will meet the most stringent of lighting codes. The D -Series LED Bollard's rugged construction, durable finish and long-lasting LEDs will provide years of maintenance -free service. EXAMPLE: DSXB LED 16C 700 40K SYM MVOLT DDBXD Will', SllppedlnrteDed "pedbutalled W= Whk 127' PE RCEWBt SP AA�Nkehae OXA3m NOM Zp. MUM llt2 7,34Mv A nk" 7.40' DF DoM Am D= D1R baeu D1116 go -low Rn,74MV WW BW Z77' W24 74'maa8 he!g6t 347` kd E? "fatn H30 30"aea1l FqE: D�llm TwwddaA le= W� H36 36'mall MqM D31BIm TatW:d t1rOK Ib eme-7uk NZI.k Wield miWmk: DWM iaamd WE*) UAB Wbmmadm 9" EL(W Fnagemy Aahs ahpnkam baQ°Y VAB4 4•hoftrMflbax DWHGXD barred badWd wltlamambf whhe bola' No36 1 Ody awYhb tithe 12C,/SY waun. 2 Qibbbdr rwtlw� 3 O .hh R)AMRYN d Nm&kkxdheCww. 5 MVOLT dmv apemta an Va veltW Gam 12P27NMM 6 Nataaah 34M t4atay.l.VewWh/u.ip. Not ewASM wMd50A1•ffllW. 7 SYgIa Wl�Nr 720, 2T1, aa0q w�gaaptlon.pgAa. Art .V. i08n2400,! p.apeo e hPABUnata.aWNewM VAtN apern ArA L/THO/V/A OnaVth.M.Way • Cnnymd,Gamala3012 • Phone:800.274.&N1 L/Gf/T/NG e2012 -=A ?ty8nod.VphW,h,c Alldpta..d. Page 76 of 118 - D -Series Size 1 LED Area Luminaire /n refteries a buy Amwi.n Spedfications EPA: 1.01 ft. Wa3W Lena h. M. 3K 700CA WW Widtla: 13' 1L`�'�y1 N' F7' 03Dag Hdylat Ht: 7-112' suen�ph map&* 7(mrnhadeed wrm)" nuw HaVi Hi 3-1/2• R77V4$M''u RM Rocdpalf=919s 27 lbs (rr830: IWI* 11,11 M hm r DSX1-LED_P1-40K_T2M_MVOLT-HS OAK PARK HEIGHTS XP2 Introduction The modem styling of the D -Series is striking yet unobtrusive - making a bold, progressive statement even as it blends seamlessly with its environment The D -Series distills the benefits of the latest in LED technology into a high performance, high efficacy, long -life luminaire. The outstanding photometric performance results in sites with excellent uniformity, greater pole s acing and lower power density. It is ideal for replacing up to 7513W metal halide in pedestrian and area lighting applications with typical energy sav ngs of 65% and expected service life of over 103,000 hours. • . - EXAMPLE: DSX1 LED P7 40K T3M MVOLT SPA NLTAIR2 PIRHN DDB)aD om u 021(1ll9 RrrWle)hh 3K 700CA TTS Fgelshm }I} IM TypeV3Dyshal' i 1 shlppedi"dwed WiLT PER 1L`�'�y1 N' F7' PMB VNIDNIVR) I T55 *Vdws AVDLT 1W 5WffP=kmmutlng suen�ph map&* 7(mrnhadeed wrm)" F2 PS' PB SDK SOMA TSM a...yme&n3 R77V4$M''u RM Rocdpalf=919s P3 F/' PR' Rdda#w*maptt"' lAM [itmSDn I TSIN yWVVAI' 120' WW WABnde4l MRaWyan 735 'rypeBl92-1 I W Bad#tomdol' 2M' 5PU N Share Pple Wks-a)nwm0Vadapd�' P103 PW 73M T EIMBA.enI LCCO Left a aW 210' WMW is d pokmde0al3namiting adapmr' Plia Pliu 741 TARNM IM I RDMgldranrrW' 2T1' SWppedfgeoteM WIN famdthm I 34' m/MOM0 MaalM=rdingbadretXWW nwi n I 480' opwU fnhh) ° shipped Imn MQMR2 011#IURgW9t ZMabW PBOPI Wtw *Am mWwhiiMeHsc. 4 PER RLMA1wBNa*wvmda 0 Imnols evel epamm)" PMB Fice-d0moxit 000 obaidedsmaam)"a PBR7 suen�ph map&* 7(mrnhadeed wrm)" DIX I-iov *tmpukdea efbr YvmwXhm as Di•13w0d3hq %°Y PIA ID 1111 maUzJarHe¢xrw1B-15-WAghdA Lp0 anhk+Y3ewraiaMdrtsk=" PM IAgblev,mdhJa�krtur1S-ID'mun6gldglt RA amdmiRamnmekdnSE•° MOM flgA*w,nmdeWn&MAYW8-15'.70" WA Sbrp/d Rwr�h wbimgm vmbinlatlt" PAW1F(3V &*AffowVwiEftum 15-0nmm2g Mgld, bmwWgl 40dd FAO Rdda#w*maptt"' DF D0UWfiWMk2(0k4pV)' Lp0 Lefinow pim' B90 Rghtict WWta' RA Mxflblm **craw AAA kkneUWAC1QW ant Sbrp/d Rwr�h BS ad3pOax tfis bmwWgl 40dd Um Dutblow DBiAD Bhd DNW Matwaldmiun DM W%e MW 1WwddakkM MW TatvMW DRUAD Radwdimoeal i i:.n,Iii'eTY'Ctn. 7 f L/jff/(7/I//iQ One ud m Way • Cwym GmVA 30012 • Phone: 14M705-SERV(7371)• w hthonia.com ii _(_ L/Ot/T/NL; 02Mn-2021 nary a a t„m Ug�q,in ar4n r...m& Pada l ofe c WRCM OUTDOOR Page 77 of 118 Specifications ePk 1.01 Tta 301: 3930K (mpo Length: 33" Stars aW 1A9drh: 13" ART Ma Height Ht: 7-1/2" 50K 50,1K (19Am) Height HL. 3-1/2" IIV&W 27 ibs (rno)l (WW D -Series Size 1 LED Area Luminaire v n a.J�'ialTfif�c!. L i r- - X' lit DSX1_LED_P140K_T5W_MVOLT OAK PARK HEIGHTS XP5 Introduction The modem styling of the D -Series is striking yet unobtrusive - making a bold, progressive statement even as It blends seamlessly with its environment The D -Series distills the benefits of the latest in LED technology into a high performance, high efficacy, long -life luminaire. The outstanding photometric performance results in sites with excellent uniformity, greater pole spacing and lower power dens'Ity. It is ideal for replacing up to 75OW metal halide in pedestrian and area lighting applications with typical energy savings of 65% and expected service life of over 100,000 hours. • EXAMPLE: DSX1 LED P7 40K T3M MVOLT SPA NLTAIR2 PIRHN DDB)(D Mae SMpmllrggd WMR2 rdghtAplgenmMnntmu:a� PIRHN NdwakAgNA9waaaaa7HnMBkstmtt" PER HEMAMIp-Idd:RaWdronHlmoadsoNertd sryrarate7x PERS Rse�DlmaP�amd/lmlhgsardeMscyarare7:x• PERI ie9mP maWea*jaRftBmdelawpmmel'+', DMD alml " rdmdpMspwmw elapse FmlBewMlan DS Dudswkd1ingan9a COMMERCIAL OUTDOOR PIR Fewardopeto 301: 3930K TIS TSVelshml TM (AVQI.T' R11PR lKluded Stars P1: P4' F7' 40K 70:113, (Ado"?l T55 tMVdmns ART 10 SQMPokmomahg P0H1FT3V P2 PS' PR 50K 50,1K TTS Ta Rshal TSM -Vlredg n, am -44801'1"` RPA Roo;dp91emw*gc TWeeddarkhm P3 Pd' P91 ftltrWedorW nm Tallman a TSW ;ypeVvi<'e' liBa Wu Wdltraaa 5Q%;mbWgWA1nm' Artintdepars Tedured rAW T3S-Mlshon BLL iu 41.1m19ml' M SPIM 50.empdaudwadmm Nalim" aHmilmm P10' P12' DWRW lgl TypegllRdm lCO) ieY¢merate" I40' IFOMRA PardpoklMmlmantNadtpie' Pf1' P131s 74M TMIYNWmn FRO agMmWQW' TT7' Shlppedaepnaety WN fmwdgm 1 W IaWDDBKBO 1h9almnmWnghraMadWffl M" 480' Dpedf2dnhWu SMpmllrggd WMR2 rdghtAplgenmMnntmu:a� PIRHN NdwakAgNA9waaaaa7HnMBkstmtt" PER HEMAMIp-Idd:RaWdronHlmoadsoNertd sryrarate7x PERS Rse�DlmaP�amd/lmlhgsardeMscyarare7:x• PERI ie9mP maWea*jaRftBmdelawpmmel'+', DMD alml " rdmdpMspwmw elapse FmlBewMlan DS Dudswkd1ingan9a COMMERCIAL OUTDOOR PIR HyMow motloldamhlmtsanaSbli'mau"WA DAIRM a111Mmtv4twrmabla d Nc1°P PAH Mgk1lew,nmdo 0101INN 15-30(moonghel9ht Stars alBtemsemaellabkd a[Sk10" PRIFf3V Ww,mgk*AbWt R-IS'mamlMghJgh Natmldwrkmm 15D4 P0H1FT3V %4r4m0ftVkMm WK 15.37mantN h9A Wlte mntdwtsemvwuMNdm lta" MO Fldda 4tkouWm Shipped Whited MXD DAIRM HS Hm "deshldda OMND Stars SF SmgleW(120.277,347V)' DRAXD Natmldwrkmm DF Dothlefine(M,2A 48M DWMW Wlte L90 ARMtedapdaa NOW TWeeddarkhm R90 ftltrWedorW ORIRXD Tenred Mack HR 5Q%;mbWgWA1nm' OWN) Tedured rAW RAA 8WAmaW"&n:#ti aHmilmm Shipped aepeatehl DWRW Tettered whla RS Mvinu Efd 6mmlglWSM One lAhonia Way • Conyen, Georgie 30012 • Phone: 1AD0.70SSERV(7378) htl-nma cnm n 2011- Acuay Brands U&ng, Inc All rlghh mored DSX14.ED R.07/19M Pegs 1 ora Page 78 of 118 D -Series Size 1 LED Area Luminaire d°S:er7es n Ih11 Al11NICt1�. Specifications EPA: 1.01 fe T)•p:IfaoM1 Pae) Vague. ® ShlppedWakd reeve width: 13" TSS DUN tf•I•hl Ht: 7-1(2° P2 PSI Pe SPK SDWK MD04 H.19 e H& 3-1/2' WOT(jee 27 The (ma* (law I •---�. an4irIZTrMla _' DSX1 LED P1 40K RCCO MVOLT OAK PARK HEIGHT'S XPR Introduction The modem styling of the D -Series is striking yet unobtrusive - making a bold, progressive statement even as it blends seamlessly with its environment. The D -Series distills the benefits of the latest in LED technology into a high performance, high efficacy, long -life luminaire. The outstanding photometric performance results in sites with excellent uniformity, greater pole spacing and lower power density. R is ideal for replacing up to 75ON metal halide in pedestrian and area lighting applications with typical energy savings of 65% and expected service life of over 100,000 hours. • EXAMPLE: DSX1 LED P7 40K T3M MVOLT SPA NLTAIR2 PIRHN DDBXD WHO am IID faauds"s apt 300A TIS T)•p:IfaoM1 Ts" I Txvv ysitnI ® ShlppedWakd Pt Pt' PT l` K' PMirt3V 141:=ft) TSS fMVdW' %VOLT M"• SWP*Mm" P2 PSI Pe SPK SDWK Tis 13719Pu 15M Tgp mddm' wn-om' APA hWPdene "- P3 Pd' P9t 12M Toelmedlen I TSW IMVW&! IN' WMA VAllaeded' Wow epic M Tjp osimm a� Bt( Badww ml' 200' RUMBA Slim p* owml nmv.Onyadapfmn MO. P12' TIM W11 melm ! IeRm =& X0a BrUG!BA bWWPakWMr'dnmmlhga*tVP PIt' P73D THA fa4e NmrdXpn I �Lat � �� SYppedseparatey hlM faz.•ri!'•:nz '30 N.dBDDBXDu MaatarmnlwntlgbDMadapm mdam 1 t 490,4etlfyfineh) = SBTp/ed3al"W IATTA192 rd*AWgeoeadm2erob'aV P11N xdWmkti�llkWlodim/mEleX>eDel' M MaAAmBNeh'mpadeanblwa*Wdartd WNW PO ( H�rcjK hWDtleee11Yi SecmFolsmdDads�etaRl0.e PW m* map* m*(mmwA mdhmd9pM)Yl DMG o-amn alm�maLo�ideed�aWDvWhffnUnftm*Ohm DS DW WWXg° PM FBgMav,mamJPrAlmwnocdHS'nPutlnghd�iL lbme-radedidd' andhXa�eahhlaz5(cm" MY 9lghMalnadWm3MmVis-3PmmeY3ghdA DoLNefx1(M,MD,40n' an5ima amar ellab� P5R a" PMirt3V motlmVmiia[aasH &7rmDeaDiyKd�A ��Stl19YEDh�ldai 4MANdop0o' Pf tH:IT PIRH1ft3V &kYd,nnSaNan5mt>msglL3DlmraeXght�A aDAndla(�ArtCwphnl mA!P/ smsmaut�al tftSn'I FAD Peld4laaebkwpldn" SNpped brWW 95 lbme-radedidd' SF SAgkAe VAZ77,WV)' DF DoLNefx1(M,MD,40n' L90 left muted 0"' FN 4MANdop0o' HA SOYanbkmeperailm, MAA aDAndla(�ArtCwphnl BS BbdsplG" EGGS GRmal SdmeaMaM DO= Datillm D&%D Nd MW MaoMlA11111m DWHXD Wilk WM TahedMOM DRUID Tam1blad: DMMMI kftdNmd AMA DWR W3 %moedWMu fLIr"27N/A onabthowWay o Co,ge,s,Geallpa30012 • Phom:1-000.705-SERV(737e) • w lithanamm DSM' L/GN77AL; 010 I-2021 A uh &and. Ligh ng c A l dg n rose ud. RM 0711921 Papal are mMraepaALoanpoort Page 79 of 118 Spec fications Luminalre HMgpt: 7-1/4" (18.4 eN yry& n0" K.. aW Dwh: 9• (22ecm� WSR LED Architectural Wall Sconce ft hwmtedm11ab1wtth WW optbn ona. Optional Back Bax (SSW) Ne%h4 4. (10.2 cM YVWth: s1i2• (14.004 Depth: 14/2" tdecm) WSR_LED_P2_SR3 40K_MVOLT Na.. OAK PARK HEIGHTS Gassic Architectural Wall Sconce with the LED technology. Long -life, maintenance -free product with typical energy savings of 80% compared to metal halide versions. The integral battery backup option provides emergency egress lighting, without the use of a bads -box or remote gear, so installations maintain their aesthetic integrity. The WSR LED is ideal for replacing existing 50- 17 lbs 25OW metal halide wall -mounted products. The V..? AW - WW cid WO O' expected service life is 20+ years of nighttime use. ��® p V H condkit Ns 1 L—W • EXAMPLE: WSR LED P2 40K SR3 MVOLT DDBTXD WULN SOK SU Tjpdg MWLT 5hlpprdledud4d AAppw1rhulktl t5A3.._P9, 120 @Imo 5BI(a@T.0cl PE Pholo+o*oAWmntype'J SRA JpcY 208 5Mpprdxpmae1p1 SF 5mg1efa(120,272,HM' The b.lewy wW pawwtM lwiWni.ra MNnwm dwabn of 90 nbadw Owednrwn durWon aetlraa llul,�kwrtlMOma 240 86W SuOeinWlted OF Osiulehrse{20E, 2AD.4E0'il' 5 27T battba DMG 0OBdmeduseWA ��u4ANRW Th. nwnwl..b.bw chew lllumlanc. oflkarw•0•.rd0.ikmlMmum ddw Pl paws padOpe Type NproduRMamerpangmode. 6 mh eemmlmrmd CMH IYAN W *dd do th. Plll, wf.-b w.?'tlWy r.wIR •MmhaP' oedcledsepw*) 480 WSR PI LED 44KSR4 NVOV FIDWC �• .• V 10'x 1V GHdlinu `�\c\ ��,' EWWC Emsm,7rtrryNatlmybNklp, (1BUJ,-20°Q, Ml. 1 6 OMy mlbbbwhh Wm Aa�d�pd Pledda SB/SD IumhWnopwabn vb twa indymdwd dd wdlight.rp��, entwo upwta deM. Nm m9.M. wth E2MC E10w WW, SE e'end lz'Maunbn Hei M w. (ergs H(ATIOe20WSBSa 4wwar anb th. prknwy W'9 b. .m I.d. EIOWHr4'bammryryba"VU'N,SY), 9 Seeekmc la knon pug. tis nnn d.” ". lL * llrNVAMA Om Liehonu way • Cwtywa, Gaagla 3OD12 • PhDw: B00.2290D41 •www. Nhonia cum A WblG78Ie20MAEMI wsrt-LPD 1/G/sfYN6 0MI i0VA fty Br ndr NghWG be N600m wwd. WW WekasNdWfauposlmaW1 Page 80 of 118 Pa MoVDnhmbAntlghtsmw' DS Dwlsw"' SPD SepaeamSwge Prlsmaims VG @rdal guard WG nmgumd a DOW DA brmE am owd PHUD mlwxlalumh m DIWOa Whk OWO SaNbbm DDOW TtrUddashbmw DO= TBBlrelbW OIWID Temrtd naMal Aft= DWWD Twadwhhe D5FM Tat*wndsmne Emergency Battery Operation I NO7FS 1 MVOLTd,h.I�agraaon.nyI...o gef.m llw omwpwwy b.wryb.ekrp�2qYc 6EtONIH apelorr4b Mb0ralto 0i. hanirnhe-ro waMmlhwdn9 rwauh.dl Thb design pmNda 2 2044 Na.a&b1.whh4WV p&. reASl..nrnpwmy ap.Mon wh7b m.ErWkng lM eedMBce oetthh• pndacL 3 PE NEWMe dElOWconf%ureCan McbdamhrdapwduRumMuydf rWthmkAynlmlyt humclady dabat ACp 1w 4 An�M_�DM.,. ulmpl NAN v34N The b.lewy wW pawwtM lwiWni.ra MNnwm dwabn of 90 nbadw Owednrwn durWon aetlraa llul,�kwrtlMOma fw (DF)r ub. 20W,, 240V bhp„�SaaWon�O1Coda5Mbn7.9. Pradd•d 4onlrx4n an 5 wiN 364 a4BQle Na awVcbb ��u4ANRW Th. nwnwl..b.bw chew lllumlanc. oflkarw•0•.rd0.ikmlMmum ddw Pl paws padOpe Type NproduRMamerpangmode. 6 VAl)na avtlbhbwRh PrL F20WCaE1WM. CMH IYAN 7 *dd do th. Plll, wf.-b w.?'tlWy r.wIR •MmhaP' cpbl S "f ."d ky. b da uh a Prole wfth WSR PI LED 44KSR4 NVOV FIDWC �• .• V 10'x 1V GHdlinu `�\c\ ��,' B Ml. 1 6 OMy mlbbbwhh Wm Aa�d�pd Pledda SB/SD IumhWnopwabn vb twa indymdwd dd wdlight.rp��, entwo upwta deM. Nm m9.M. wth E2MC E10w WW, SE e'end lz'Maunbn Hei M w. OR N.ardw.d Wth aaA��ae tamed. agpawwee lea& M 4wwar anb th. prknwy W'9 b. .m I.d. 9 Seeekmc la knon pug. tis nnn d.” ". lL * llrNVAMA Om Liehonu way • Cwtywa, Gaagla 3OD12 • PhDw: B00.2290D41 •www. Nhonia cum A wsrt-LPD 1/G/sfYN6 0MI i0VA fty Br ndr NghWG be N600m wwd. Aev. OMW Page 80 of 118 Page 81 of 118 �-0.36 Kidep0orn MEMORANDUM To: City of Oak Park Heights From: Jacob Rojer, P.E., PTOE Kimley-Hom and Associates, Inc. Date: August 3, 2022 Subject Traffic Memo—Oak Park Heights Apartment Building 589, SL N. Oak Park Heights, MN INTRODUCTION Senior Housing Partners is proposing a new apartment building located along 581° Street N approximately one quarter of a mile east of the 589, Street N & Norell Avenue N in Oak Park Heights, Minnesota. The proposed building is phase 1 of a future three building site plan. This building will include 79 residential units. This memorandum documents the anticipated trip generation of the proposed apartment building and how this is expelled to Impact operations along 589, Street. TRIP GENERATION COMPARISON The trip generation for the proposed apartment building was calculated based on the Institute of Transportation Engineers (ITE) Trip Generation Manual, 119, Edition. For the proposed building, ITE Land Use Code (LUC) 221 (Multifamily Housing Mid -Rise) was used as it accurately represents the type of residential housing being proposed. The trip generation can be calculated using the number of residential units. Table 1 provides the proposed apartment building traffic generation. The proposed building is anticipated to generate 29 trips in the AM peak hour, 31 trips In the PM peak hour, and 359 daily trips. Table 1 - Trip Generation Comparison Land Use Description ITE Code Intensity/ Units Dally AM Peak Hour PM Peak Hour In Out Total In Total Proposed Multifamily 221 79 Unita 359 6 23 29 19 7127 31 Housing (Mid -Rise) PLANNING LEVEL ROADWAY CAPACITY The Highway Capacity Manual (HCM), 69, Edition provides a Level of Service (LOS) estimate based on roadway characteristics and the Average Annual Dally Traffic (AADT). LOS ranges from A to F, with LOS A as the highest (best traffic flow and least delay), LOS E as saturated or at -capacity conditions, and LOS F as the lowest (oversaturated conditions). o Page 82 of 118 Kimley»> Horn Page 2 The proposed apartment building will maintain the same site access as the existing conditions, with the one site access along 581h Street The site currently functions as an overflow parking lot for the senior living community across 58^ Street Trip generation from the existing parking lot can be assumed to be accounted for by daily traffic data. There is not historic daily traffic data available for 580, Street and due to the reconstruction on Norell Avenue, current traffic patterns would not be representative of typical conditions. However, the adjacent roadway AADTs for Norall Avenue and Oakgreen Avenue are less than 10,000 vehicles per day. Therefore, it is anticipated that 581h Street, a fouraane undivided urban roadway, would maintain an acceptable level of service with the addition on the proposed development based on the roadway capacities shown in Table 2 and that there would be minimal impacts on operations and safety. No changes to the roadway geometry at the site access are recommended. Table 2 — Planning Level Roadway Capacity CONCLUSION The proposed apartment building is anticipated to generate an additional 359 daily trips, 29 AM peak hour trips, and 31 PM peak hour trips. With the proposed apartment building, 58"' Street is expected to operate within the capacity of the roadway and have minimal impacts on operations and safety. No changes to the roadway geometry at the site access are recommended. Page 83 of 118 Under Capacity Approaching Over Facility Type Planning Levet Daily Capacity Capacity A 8 C D E F Capacity Ranges (AADT) 0.2 0.4 0.5 0.85 1.0 >1.0 Four -lane undivided !4,400 urban 18,000.22,000 8,800 13,200 1$700 22,000 >22,000 CONCLUSION The proposed apartment building is anticipated to generate an additional 359 daily trips, 29 AM peak hour trips, and 31 PM peak hour trips. With the proposed apartment building, 58"' Street is expected to operate within the capacity of the roadway and have minimal impacts on operations and safety. No changes to the roadway geometry at the site access are recommended. Page 83 of 118 � M z �= N g9 �I in o fay([limil n Page 84 of 118 i > �m� N O } a€ Y �a mi t oil# Page 85 of 118 d- Ti Page 86 of 118 Q - i I 13: Page 86 of 118 ar=%t mo r F� ✓p2z0 `� a Q s y I i I c `• pp�— i - AX I I V V v O V Page 87 of 118 ti. >' i f "Lc y, If Co.4jp I1u fill 911311Eqs 1 Page 88 of 118 Page 89 of 118 qLe� {U Page 89 of 118 Page 90 of 118 & qq 0 City of Oak Park Heights 14168 Oak Park Blvd N. a Oak Park Heights, MN 55082 • Phone (651) 439-4439 a Fax 439-0574 Memorandum To: Eric Johnson, City Administrator Cc: Scott Richards, City Planner, Julie Hultman, Building Official From: Lisa Danielson, City Arborist Date: 9/29/2022 Itm VSSA-Presbyterian Homes Workforce Housing Landscape Plan Review I have reviewed the landscape plans submitted for the VSSA-Presbyterian Homes Workforce Housing dated 7/12/2022 (received by the City on 9/19/2022). The following includes my comments and/or recommendations: Landscape Tftle Sheet (Sheet Number L001) General Notes -(Planting Notesl The landscape notes and planting detail submitted is incomplete. Please Include the following items/edits on the final plans: 1. All trees must be landscape grade trees of good form and structure not Park Grade trees. Trees with poor form will be more prone to storm damage and failure in the future. Please include this in the planting notes. 2. All trees must be straight and not need staking after planting. Contractor shall stake trees only if the tree(s) begin to lean within the guarantee period, please include this in the final planting notes. 3. The landscape contractor Is required to plant trees and shrubs according to the approved planting detail diagrams and landscape notes submitted with the final approved landscape plan. This will be checked after planting and any deviations from the plans must be corrected before the landscaping will be approved by the City, this needs to be noted in the final plans. 4. Contractors doing any type of tree work must secure a City of Oak Park Heights Tree Worker's License (annual license) from the City of Oak Park Heights Building Department. All required documents must be submitted with the application. Page 91 of 118 B. The City Arborist will conduct an Initial Landscape Inspection after all plants/trees, mulch, act. have been installed. 6. The City Arborist will conduct a Final Landscape Inspection typically (1) year after installation, at the end of the plant guarantee period. For Final Acceptance of Installation and Landscape Plants the specified planting procedures must have been followed and all plants must be alive and in good condition at the end of the plant guarantee period. Tree Removals and Tree Protection Plan (Sheet Number L002 and 1-003) A total of (7) seven trees (77 total caliper Inches) are planned to be removed. The tree replacement requirement will be met with proposed plantings. The recommendations and edits I have for this plan sheet are as follows: 1. Please edit the tree replacement calculation on Sheet Number L002 to 77 caliper inches as being lost not 79 caliper inches. 2. A tree protection plan was not included. This must be submitted with the final plan set. 3. Please designate on the Tree Inventory Table exactly which trees were included in the tree replacement calculation. 4. Include the trees being removed in the Tree Inventory Table. Overall Landscape Plan (Sheet Number L100) The plan includes an array of species and varieties to be planted. There are (10) ten deciduous tree species, (2) two evergreen tree species, (10) ten shrub species and (4) four perennial species proposed to be planted. The plants included are acceptable and will complement the overall site well. Proposed Plant Schedule (Sheet Number 1-002, L100, L101 and L150) The proposed plant schedule Includes a good selection of species diversity with some native or improved cultivars of native plants. Most of the trees and plants chosen are hardy under local growing conditions, relatively insect and disease free and fairly low maintenance. The plant sizes included conform to the zoning ordinance requirements. The recommendations and edits I have for this plan sheet are listed below: The Proposed Plant Schedule should not Include the Tree Removals. Please remove this from the Proposed Plant Schedules included on Sheet Numbers 1-002, 1-100, L101 and L150. 2. The Proposed Plant Schedule on Sheet Number L101 includes (8) eight hockberry trees to be planted. There are (18) eighteen included on Sheet Numbers 1-002, L100 and 1-150. Please edit this. Landscape Details (Sheet Number L300) The planting detail diagrams submitted are acceptable, no changes need to be made. Page 2 of 3 Page 92 of 118 Additional Resources If you are in need of some further information on the City of OPH Ordinances and Other Resources in Regards to Trees, Planting and Landscaping please reference the following Items: o City of OPH Ordinances 0 401 (see 401.16 Design Guidelines Ordinance) 0 1302 (Shade Tree Diseases and Pests) 0 1304 (Tree Ordinance) 0 1305 (Shade Tree Program) 0 1307 (Tree Protection) o City of OPH Development Application Packet (see Pages 10-12) o City of OPH Design Guidelines Packet (see Pages 26 & 26) o City of OPH Tree Species List o City of OPH Tree Workers License Application o American Standard for Nursery Stook (ANSI 260.1-2014 is the most recent version) published by AmencanHort Please contact me if you have any questions regarding this landscape plan review. Please feel free to forward my comments to the development team for this project. Page 3 of 3 Page 93 of 118 ;ng Services 1, Stantec 733 Maquelle Monte Sub 1000, Minneapolis MN 55402-2309 October 8, 2022 File: 193800151 Attention: Mr. Eric Johnson City of Oak Park Heights 14188 Oak Park Blvd. Oak Park Height, MN 55082 Reference: Oak Park Heights Housing - Preliminary Plan Review Dear Eric: As requested, we have reviewed the information submitted regarding the proposed Oak Park Housing project. The information reviewed includes preliminary, not for construction engineering drawings dated 9- 15-2022, and stormwater related documents dated 7-29-2022. Further review will be forthcoming when construction plans are submitted. Following are our preliminary comments and/or recommendations: Sheat C200 — Demolition Plan 1. No comments at this time. Sheets C300.302 — Erosion and Sediment Control 2. Include sift fence detail. 3. Utilize City detail plates where applicable. The City's detail plates are available upon request. 4. The City reserves the right to require additional erosion control measures as determined/necessary during the construction of the project Sheet C400-401 —Site Plans 1. Clearly delineate the phases on the overall site plan. There is a parking lot shown on the overall site plan that is east of the improvements shown on the site plan phase 1 sheet that is shown to be built but is likely pad of a future phase? 2. Include all applicable City Detail Plates. 3. Refer to the Fire Department review of fire lanes and circulation. Page 94 of 118 October 8, 2022 Mr. Eric Johnson Page 2 of 5 Reference: Oak Park Heights Horsing - Preliminary Plan Review Sheet CSW -601 - Grading Plans 1. Refer to the stormwater comments below. The Owner will need to comply with all related requirements of the NPDES Construction Stomrwater Permit and Middle St. Croix Watershed Management Organization. 2. Clearly delineate phase 1 versus future phase improvements 3. Include all applicable City Detail Plates. 4. Label emergency overflow (EOF) locations and elevation for each stormwater basin. S. Label 100 -yr highwater levels (HWL) for each stormwater basin. Sheet C800.601 - Utility Pian 1. Connections to the City's sewer and water systems shall be per City standards and detail plates. The City or its designee will be present for water and sewer service connections to the City's systems. 2. Label water line material. Ductile Iron Pipe will be required. 3. Provide details for the sewer and water service connections. 4. Clearly delineate improvements for future phases. 5. The waternain, sanitary sewer lines, and storm sewer facilities that serve the site will be private and maintained by the owner. B. The plan indicates a Wet Tap in Future Phases to the west of the proposed southerly building. A wet tap will not be allowed. 7. Include all applicable City Detail Plates. 8. Provide proposed details for the drain tile layouts for each filtration basin. Sheets C700 - Details 1. Utilize City Detail plates where applicable. 2. Update details Band 9 to confirm HWL's for filtration basins and rim elevations for OCS's are consistent between plans and HydroCAD model Page 95 of 118 October 8, 2022 Mr. Eric Johnson Page 3 of 5 Reference., Oak Park Heights Horsing - Preliminary Plan Review Stone Sewer/Storm Water Management 1. The stormwater report should be signed by the engineer responsible for its preparation. 2. The current design is proposing lined filtration BMP's and is therefore meeting the City's requirement of no infiltration within the City's High Vulnerability Drinking Water Supply Management Area (DWSMA). 3. Water quality calculations were not submitted with stomowater report. Design must meet Middle St Croix Watershed Management Organization (MSCWMO) water quality rules. 4. Change storm distribution to MSE 3 instead of Type Il in the HydroCAD model. 5. Provide HydroCAD calculations that demonstrate that rate control requirements will be net for Phase 1 of the project. 6. Update proposed drainage map to show the sperate three areas that make up DA -3 in the HydroCAD model (i.e., 3 (DA -3 All pervious), 3A (DA -3 Half Pavement), 3B (DA -3 Half Pavement)). 7. Proposed drainage areas DA -2, DA -7 and DA -9 appear to drain offsite and are not routed to either of the proposed stormwater basins. Either update the HydroCAD model to reflect this or provide information to shows these areas will be routed to an on-site stonnwater BMP. 8. Confirm that proposed flow rates to adjacent properties do not increase, specifically to the properties to the north (i.e., Wahnart, Lowe's). It appears that a portion of the existing drainage area DA -1 may flow offsite to the north. Flows from this area will need to be quantified and compared to proposed conditions. 9. Include the existing pond (i.e., storage and outlet) in the HydroCAD model to assess potential impacts to the pond (e.g., high water levels, pond outflows, etc). 10. The proposed drainage area map, C400 and C500 indicate there is a third stormwater BMP located near the center of the site west of Proposed Building 3. This BMP does not appear to be included in the HydroCAD calculations. Please confirm If there is a stormwater BMP in this location, and if there is, include in the HydroCAD calculations. 11. Provide outlet control structure details for each stormwater basin. Page 96 of 118 October 8, 2022 Mr. Eric Johnson Page 4 of 5 Reference: Oak Park Heights Housing - Preliminary Plan Review Traffic Memorandum 1. The trip generation totals are correct for 79 apartment units 2. The traffic impact of the trips generated by Phase 1 of the development is minimal on 58e, Street operations. 3. A full Traffic Impact Analysis should be required for all phases of the development. The study should include data collection and traffic forecasts at the following intersections: a. UP Street/Norwich Avenue b. 58th Streef/Norell Avenue c. 58° Street/Oakgreen Avenue d. 5811 Strest/exisfing and proposed access points 4. The intersection sight distance at the proposed access points on 58'^ Street should be documented to confirm that they meet standards. General Comments 1. The City reserves the right to Inspect the construction of the project The City or its designee shall be present for water and sanitary sewer service connections. 2. The Owner will need to comply with all requirements of the NPDES Construction Stormwater Permit and Middle St Croix Watershed Management Organization. The City reserves the right to require additional erosion control measures as determined/necessary during the construction of the project. 3. Review of issues related to parking, lighting, landscaping, fire department access or the buildings is by others. 4. The Owner shall be responsible for obtaining all required permits. 5. Utility construction and improvements in the right-of-way need to conform to the City's Standard Detail Plates. Include all applicable City detail plates on the plans. The City's details can be provided upon request. If you have any questions or require further information, please do not hesitate to contact me. Page 97 of 118 October 8, 2022 Mr. Erle Johnson Page 5 of 5 Reference: Oak Park Heights Housing • Preliminary Plan Review Regards, Consulting Services Inc. Lee M. Mania, MN, WI, CA Principal Phone: 612-712-2085 Lee.Menn@stenteo.com a file Jute Hultman, Building Official Andrew Kegley, Director of Public Works Scott Richards, City Planner Kevin Sandstrom, City Atlomsy Page 98 of 118 PLANNING REPORT TO: Eric Johnson FROM: Scott Richards DATE: October 20, 2022 RE: Oak Park Heights — Senior Housing Partners/Valley Senior Service Alliance — Planned Unit Development — General Plan, Conditional Use Permit, Subdivision, and Architectural Design Guideline/Site Plan Review TPC FILE: 236.02 — 22.07 BACKGROUND Kevin Lohry, representing Senior Housing Partners/Valley Senior Service Alliance (VSSA), has submitted an application for Planned Unit Development (PUD) General Plan, Conditional Use Permits for multiple family development and building height, Preliminary and Final plat, and Architectural Design Guidelines/Site Plan Review for the development of the area north of 58th Street at Norwich Avenue North. The General Plan application includes the first phase of the development, a 79 -unit multiple family apartment building that will be constructed just north of existing parking lot on the subject property. The PUD General Plan, Preliminary and Final Plat and design review for the McKean Square Historic Village and the 58th Street tunnel and parking was approved by the City Council on May 27, 2008. The remaining portion of the subject property was not part of Concept or General Plan approvals. The Concept Plan of the area north of 58th Street for the three phase development was approved by the City Council at their August 23, 2022, meeting. The Planning Commission at their October 13, 2022, meeting held a public hearing, took the Applicant's and public's testimony, and after consideration of the application, unanimously recommended approval with conditions. The recommended conditions are found below and in the City Council resolution. The review is based upon the following submittals: Exhibit 1: Planning Report with Exhibits — October 6, 2022 Page 99 of 118 CONCLUSION / RECOMMENDATION Subject to the preceding review, the Planning Commission recommended approval of the following listed requests for the development of the area north of 58t" Street at Norwich Avenue which includes a 79 -unit multiple family apartment building, subject to the conditions that follow: • Planned Unit Development (PUD) General Plan • Preliminary and Final Plat • Conditional Use Permit for Multiple Family Development • Conditional Use Permit for Building Height • Architectural Design Guidelines and Site Plan 1. The Final Plat for Boutwells Second Addition, as well as the dedication and vacation of any easements, shall be subject to the review and approval of the City Engineer and City Attorney. 2. A Preliminary Plat for Boutwells Second Addition shall be submitted subject to approval of the City Engineer and City Attorney. 3. The Planning Commission was favorable to, and City Council approves the east building setback of 28 feet, where 30 feet is required. 4. The Planning Commission was favorable to, and City Council approves the alcove units at 487 square feet, where 600 square feet is required. 5. The tree removal, tree replacement and landscape plan shall be subject to review and approval of the City Arborist. 6. The grading and drainage plans shall be subject to City Engineer and the Middle St. Croix Watershed Management Organization approval. 7. All utility plans shall be subject to review and approval of the City Engineer. 8. The Planning Commission was favorable to, and City Council approves the reduction of parking spaces, where 154 spaces are provided and 158 spaces are required, and whether to allow this variation through the General Plan approvals. 9. The Fire Chief and Police Chief shall review and approve the final plans to determine the accessibility of emergency vehicles throughout the development. 10. Any mechanical equipment that is ground mounted or visible from adjacent streets shall be screened as required by the Zoning Ordinance. 11. All trash and recycling storage shall be internal to the building. Page 100 of 118 12.The Planning Commission was favorable to, and City Council approves the proposed building height. 13.The Planning Commission was favorable to, and City Council approves the building appearance, colors, and materials. The Applicant shall provide a materials board for the buildings to be discussed at the City Council meeting. 14.The Applicant shall be required to enter into an amended development agreement with the City should approval of the General Plan be granted. The development agreement shall be subject to review and approval of the City Attorney and City Council. Pc: Julie Hultman Page 101 of 118 RESOLUTION NO. CITY COUNCIL CITY OF OAK PARK HEIGHTS WASHINGTON COUNTY, MINNESOTA A RESOLUTION ESTABLISHING FINDINGS OF FACT AND RESOLUTION OF THE CITY COUNCIL THAT THE REQUEST BY KEVIN LOHRY, REPRESENTING SENIOR HOUSING PARTNERS/VALLEY SENIOR SERVICE ALLIANCE (VSSA) FOR PLANNED UNIT DEVELOPMENT GENERAL PLAN, CONDITIONAL USE PERMITS, PRELIMINARY AND FINAL PLAT, AND ARCHITECTURAL DESIGN GUIDELINES/SITE PLAN REVIEW OF THE AREA NORTH OF 58TH STREET AT NORWICH AVENUE BE APPROVED WITH CONDITIONS WHEREAS, the City of Oak Park Heights has received a request from Kevin Lohry representing Senior Housing Partners/Valley Senior Service Alliance (VSSA) for Planned Unit Development General Plan, Conditional Use Permits for multiple family development, and building height, Preliminary and Final Plat, and Architectural Design Guidelines /Site Plan Review for a 79 unit multiple family apartment building of the area north of 58th Street at Norwich Avenue; and after having conducted a public hearing relative thereto, the Planning Commission of Oak Park Heights recommended that the request be approved with conditions. The City Council of the City of Oak Park Heights makes the following findings of fact and resolution: 1. The real property affected by said application is legally described as follows, to wit: SEE ATTACHMENT A and 2. The applicant has submitted an application and supporting documentation to the Community Development Department consisting of the following items: SEE ATTACHMENT B and 3. The subject property is zoned B-4, Limited Business District which allows multiple family development with a Conditional Use Permit. As such, the underlying base zoning district is B-4, Limited Business District with a PUD overlay. The performance standards of the R-3 Multiple Family District must be complied with for residential development in the B-4 Limited Business District; and 4. The three phase development consists of phase one with a 79 unit multi- family housing building at the north end of the subject property, and two other phases, one a brownstone senior living facility and the other mixed use with senior living. The plans and Page 102 of 118 potential uses for phase two and three have not been determined by Senior Housing PartnersNSSA; and 5. The PUD General Plan, Preliminary and Final Plat and design review for the McKean Square Historic Village and the 581i Street tunnel and parking was approved by the City Council on May 27, 2008. The remaining portion of the subject property, north of 581i Street was not part of Concept or General Plan approvals. A Planned Unit Development Concept Plan has been requested at this time for the three phase development; and 6. The application requests approval of a Planned Unit Development General Plan, Conditional Use Permits for multiple family development, and building height, Preliminary and Final Plat, and Architectural Design Guidelines /Site Plan Review; and 7. City staff prepared a planning report dated October 6, 2022, reviewing the request for the application; and 8. Said report recommended approval of the application subject to the fulfillment of conditions; and 9. The Planning Commission held a public hearing at their October 13, 2022, meeting, took comments from the applicants and public, closed the public hearing, and recommended the application with conditions. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL FOR THE CITY OF OAK PARK HEIGHTS THAT THE CITY COUNCIL APPROVES THE FOLLOWING: A. The application submitted by Kevin Lohry representing Senior Housing Partners/Valley Senior Service Alliance (VSSA) for Planned Unit Development General Plan, Conditional Use Permits for multiple family development, and building height, Preliminary and Final Plat, and Architectural Design Guidelines /Site Plan Review for a 79 unit multiple family apartment building of the area north of 58h Street at Norwich Avenue of the area north of 581h Street at Norwich Avenue affecting the real property as follows: SEE ATTACHMENT A Be and the same as hereby approved by the City Council of the City of Oak Park Heights the following, subject to the conditions as follows: • Planned Unit Development (PUD) General Plan • Preliminary and Final Plat • Conditional Use Permit for Multiple Family Development • Conditional Use Permit for Building Height • Architectural Design Guidelines and Site Plan 1. The Final Plat for Boutwells Second Addition, as well as the dedication and vacation of any easements, shall be subject to the review and approval of the City Engineer and City Attorney. Page 103 of 118 2. A Preliminary Plat for Boutwells Second Addition shall be submitted subject to approval of the City Engineer and City Attorney. 3. The Planning Commission was favorable to, and City Council approves the east building setback of 28 feet, where 30 feet is required. 4. The Planning Commission was favorable to, and City Council approves the alcove units at 487 square feet, where 600 square feet is required. 5. The tree removal, tree replacement and landscape plan shall be subject to review and approval of the City Arborist. 6. The grading and drainage plans shall be subject to City Engineer and the Middle St. Croix Watershed Management Organization approval. 7. All utility plans shall be subject to review and approval of the City Engineer. 8. The Planning Commission was favorable to, and City Council approves the reduction of parking spaces, where 154 spaces are provided and 158 spaces are required, and whether to allow this variation through the General Plan approvals. 9. The Fire Chief and Police Chief shall review and approve the final plans to determine the accessibility of emergency vehicles throughout the development. 10. Any mechanical equipment that is ground mounted or visible from adjacent streets shall be screened as required by the Zoning Ordinance. 11. All trash and recycling storage shall be internal to the building. 12. The Planning Commission was favorable to, and City Council approves the proposed building height. 13. The Planning Commission was favorable to, and City Council approves the building appearance, colors, and materials. The Applicant shall provide a materials board for the buildings to be discussed at the City Council meeting. 2022. 14. The Applicant shall be required to enter into an amended development agreement with the City should approval of the General Plan be granted. The development agreement shall be subject to review and approval of the City Attorney and City Council. The Development Agreement shall include provisions similar to past VSSA developments related to payment in lieu of taxes and fire/emergency service costs Approved by the City Council of the City of Oak Park Heights this 25th day of October Page 104 of 118 Mary McComber, Mayor ATTEST: Eric A. Johnson, City Administrator Page 105 of 118 ATTACHMENT A Planned Unit Development — General Plan, Conditional Use Permits For Multiple Family Development & Building Height, Subdivision and Design Guidelines / Site Plan Review To Allow Construction of A 79 Unit, Multiple Family Apartment Building Valley Senior Services Alliance/Senior Housing Partners Washington County Properly Identification Number: 05.029.20.13.0010 Legal Description: Lot C SubdivisionCd 02095 SubdivisionName OAK PARK COMMONS Physical Address: Unassigned Page 106 of 118 ATTACHMENT B Planned Unit Development — General Plan, Conditional Use Permits For Multiple Family Development & Building Height, Subdivision and Design Guidelines / Site Plan Review To Allow Construction of A 79 Unit, Multiple Family Apartment Building Application Materials • Application Form • Fees • Plan Sets • Written Narrative and Graphic Materials Explaining Proposal • Proof of Ownership or Authorization to Proceed Planning Commission Review & Recommendation: October 13, 2022 PUD: Unless a General Plan of Development covering the area designated as in the General Concept Plan as the first stage of the PUD has been filed within twelve (12) months from the date Council grants General Concept Plan approval, or in any case where the applicant fails to file General Plan of Development Stage and Final Plans and to proceed with development in accordance with the provisions of this Ordinance and of an approved General Concept Plan, the approval may be revoked by Council action. (401.06.C.2.e) Conditional Use Permit: Unless the City Council specifically approves a different time when action is officially taken on the request, the conditional use permit shall become null and void twelve (12) months after the date of approval, unless the property owner or applicant has substantially started the construction of any building, structure, addition or alteration, or use requested as part of the conditional use. An application to extend the approval of a conditional use permit shall be submitted to the Zoning Administrator not less than thirty (30) days before the expiration of said approval. (401.03.C.4.a and b) Page 107 of 118 THIS PAGE INTENTIONALLY LEFT BLANK Page 108 of 118