Loading...
HomeMy WebLinkAbout2022-11-10 TPC Planning Report - Following PC TP 3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231.5840 Facsimile: 763.427.0520 TPC@PlanningCo.com PLANNING REPORT TO: Eric Johnson FROM: Scott Richards DATE: November 10, 2022 RE: Oak Park Heights — Croixview Holdings, LLC — George Siegfried Construction Company Office Building — Conditional Use Permit, Outside Storage, Design Guidelines/Site Plan Review— 5416 Stagecoach Trail North TPC FILE: 236.02 — 22.10 BACKGROUND Tim Siegfried of Croixview Holdings, LLC (Applicant) has made an application for construction of a new office building and warehouse building at 5416 Stagecoach Trail North. The property is owned by the City and is located between the Minnesota Correctional Facility Stillwater and Perro Pond. The application consists of requests for a Conditional Use Permit to allow for outdoor storage and Site Plan/Design Guidelines review. The property is currently undeveloped. The site is 1.45 acres in size with partial tree cover and is zoned B-W Business Warehouse District. The proposed building will have a 3,900 square foot office and 12,100 square feet of indoor heated warehouse space for a general contracting company. The Planning Commission at their November 10, 2022, meeting held a public hearing, took the Applicant's and public's testimony, and after consideration of the application, unanimously recommended approval with conditions. The recommended conditions are found below and in the City Council resolution. Note: The plans that have been submitted to date are in a preliminary format. The Applicant has requested the Conditional Use Permit review of conceptual plans so that there is an assurance that the project can move forward prior to securing the property. If the Conditional Use Permit is approved, the final plans will be produced and reviewed by the Planning Commission, with final approval by the City Council. In that the City is the property owner, the City Council will have the final decision in approval of the land sale, developer's agreement, and plans. EXHIBITS The review is based upon the following submittals: Exhibit 1: Planning Report with Exhibits — November 3, 2022 CONCLUSION / RECOMMENDATION Subject to their review, the Planning Commission recommended approval of the following listed requests for construction of a new office building and warehouse building at 5416 Stagecoach Trail North. A resolution has been provided to the City Council for their consideration. • Conditional Use Permit for Outdoor Storage • Site Plan/Design Standards Review 1. Final plans shall be provided including details on screening, landscaping, grading, drainage, utilities, lighting, mechanical screening, signage, and any site or building changes subject to review of the Planning Commission and approval of the City Council. 2. The access points are subject to review and approval of Washington County. 3. The final grading, drainage and utility plans shall be subject to the review and approval of the City Engineer. The drainage plans shall be subject to the review of the Middle St. Croix Watershed District. 4. All lighting fixtures shall be full cut off and installed in compliance with the lighting standards of the Zoning Ordinance. The final plans shall be subject to City Staff. 5. The outdoor lighting shall be turned off one hour after closing, except for approved security lighting. 6. The final berming, landscape, fencing and tree removal/replacement plans are subject to review and approval of the City Arborist. 7. All signage shall be subject to final review and approval of City Staff for conformance with Zoning Ordinance standards. 8. All noise generated from the store shall be compliant with Section 401.15.6.11 of the Zoning Ordinance. The service doors to the building shall be always closed except when vehicles are moved in and out of the warehouse building. 2 9. Hours of operation shall be limited to 6:00 AM to 9:00 PM Monday through Friday, and 7:00 AM to 5:00 PM Saturday and Sunday 10. Mechanical equipment that is located on the roof or visible from street level or from neighboring properties shall be screened with materials that blend harmoniously with the building façade materials and in accordance with Section 401.15.E.10.e of the Zoning Ordinance. 11. The Planning Commission was favorable to the building design, transparency of the front facade and compatibility with the Design Guidelines. 12. The Planning Commission was favorable to the building material selection and colors and the Applicant shall provide building material samples for Planning Commission and City Council review. 13. The applicant shall be required to enter into a Development Agreement. The development agreement shall be subject to the review and approval of the City Attorney and City Council. 14. The Applicant shall dedicate to the City at no cost an easement on the subject property, as required by the City Engineer, to accommodate a six (6) foot trail as shown in the Conceptual Landscape Plan. The timeline for such trail construction is unknown at this time and is anticipated to be in coordination with a future Washington County regional trail project. This condition and easement may be voided by the City in its related documentation in event Washington County does not provide two access points onto Stagecoach Trail North as shown on the Site Plan. PC: Julie Hultman 3