Loading...
HomeMy WebLinkAbout2010-05-19 Applicant Ltr to NACFARIBAULT MADISON MANKATO 1415 Town S Ln 2090 Research Park Dr, Ste H 1409 N' Riverfront Dr Faribault, MN 55021 Madison W1 53711 Mankato MN 56001 )GROUP PH: 507,331.1500 PH: 608,442.9500 P11: 507.381.6651 One firm - start to finish T11 FX: S470331.1501 FX: 60&442.9501 FX: 507.387.3583 ARCHITECTS ENGINEERS - PLANNERS , LAND SURVEYORS - SOENTISTS Ma 19, 2010 Mr. Scott D. Richards, AICP Senior Planner Cit of Oak Park Hei c/o Northwest Associated Consultants, Inc. 4800 Olson Memorial Hi Suite 202 Golden Valle MN 55422 RE: Oak Park Hei — Aldi Grocer Store — 601h Street North and Nova Scotia Avenue File No. 798.02 — 10.01 Dear Mr.Richards: This letter is in response to y our re for information and review letter dated Ma 13, 2010. - In order to address comments or re for information re specific items, each pertinent checklist item will be stated and numbered [-)elow in correspondence to the ori letter. 1. Provide an ownership and encumbrance report as re b the Cit Attorne The current title commitment accompanies this letter which provides all of the information in an ownership and encumbrance report but more detailed. 2. Provide an additional $200.00 for the preliminar plat application. With the subn1ittal, $200.00 was provided for a minor subdivision. The fee for major subdivision is $400.0+0.. The additional fie e is attached alon with the fee and escrow for the varia ice application that accompanies this letter as well. 3. Produce the draina calculations for the site and j ustification that the poild to the south had been desi to accommodate the subject propert runoff. Stormwater calculations for the proposed storm draina s seii)in the Aldl lot accompan this letter. In addition to this there is also a stormwater model showin the existin and proposed stormwater run from this site. I&S Group has been workin with the Cit En Chris Lon to obtain the calculations that were done for• the existin story water pond, upon receivin this information ) GROUP f- nl the proposed Alcli stormwater model will he compared to that which the pond was designed . for and ' more detailed determination of the stormwate r management will he provided to the City of oak Park Heights. 4. Provide the easement documentation for the City utilities adjacent to 60 "' Street North, Our research, cis ivell as that of'the se ller's engineer did n ot reveal r there to be an easement currentl in place over the utilities ad 'acent to bo Street North. As such, per conversations with Chris Long as well as review of the platted properties to the west, it was determined that a 3S' drainage and utility easement should he recorded to encompass these utilities its conjunction with this prq ect. Thus the prel iminary and final nal plat drawings that accompany this submittal have hee n oclifieel to r(- fleet this easement. 5 . P the current purchase aRreement for the sut�ject. property This Information will be used as the basis for calculating park dedication The current purchase ag reem.ent f )r this prope accompanies this letter. 6. Provide plans :poi- wall. signs that comply with the Zoning Ordinance requirements or a variance application with appropriate fees. A narr ative shall he included with the justification for hardship. The building elevations that accompany this letter Flo show the wall 4 ignage for the proposed Aldi building. [riven tli.e prol)osed nitil'iher of sigtls that Aldi is proposing, a variance a,vNication, fee and narrative also accompany this submittal. 7. A revised landscape plan is requested with additional parking lot medians that are sized adequately to support trees and vegetation. The site plan has been updated to include additional parking lot medians and al..so increase the size ref those that were. originally proposed Along with this the landscape plan was updated to include additional landscaping as we ll as satisfy the comments that were provided by the City Arborlst, Kathy Widin, in her Allay 12, 2010 email. Response Letter for oak Park Heights — Aldi Grocery Store — 60th Street North and Nova Scotia Avenue — Pile No. 708.02 --• 10.01 May 19, 2010 Page 2 of 4 One firm - Strut to finish "` S. Provide a crosswalk that will. connect the existing trail system to the front entrance of the building. The site plan has been updated to inc a cross wa connecting the existing bituminous trail on the north side of the Aldi site to thefront entrance to the Aldi building. 9. Provide plans for mechanical screening of equipment that will be placed on the side of the building or on the roof. The owner will provide frill screening of all iiiechanical equips ent that is to be placed of or around this building. The roof screening spec U ation as well as manufacturers cut sheets of the rooftop screening products acconipanies this letter. It is typical of Aldi to use �lnvisoip3 screening b CityScapes .International as shown on the attached cut sheets and they - will in this instance cis well. 7'he building screeni`nc ivill include panel design and color to snatch the remainder of the Aldi building as shown on the building elevations. . o. All lighting on the building is required to be full cut off fixtures. The wall mounted fixtures on the building are not compliant. Provide specifications for all light fixtures. The lighting Galan fior thi's project has been updated and included only fall cut o fj-' fixtures. I'he light plan along with cut sheets,for all li ght, f ixtur es accompanies this submittal. 1. l . Provide a photometric plan that complies wi th the Zoning ordinance regU firemen t s of a 0.4. foot candles at a property l ine or not to exceed one foot candle at the centerline of an adjacent street. All pole mounted light fixtures shall not exceed 25 feet to the top of the fixture and/or pole. The lighting Gal for this project has been updated and now meets the city requirements outlined above. The lighting plan along with cut sheets for all light fixtures accomp this submittal. 12. Staff commented that the facades of the building facing the two streets lacked architectural interest and detailing. The facades should be redesigned with additional detailing and differences in building materials to enhance the Response Letter for oak Park Heights — Aldi Grocery Store — 60 Street North and Nova Scotia Avenue -- File No. 798.02 --10.0 1 1 May 19, 2010 Page 3 of 4 G RO U.P One firin - start to finish" appearance of the building. Please consult the oak Park Heights Design Guidelines as a reference. T he b facades have been updated to tncolI)orate more architectural interest and detailing per the Oak Park Heights Design Guidelines. This can be seen on the uI)dated color building elevations that acconilmny this subn1ittal. Please contact one at 507-331-1500 with any questions or further requests for inforr - nation. Sincerely, a tlx t 61�k Andrew T. Bfandel, PE Engineer A TB /saw Enclosures Response Letter for Oak Park Heights — Aldi Grocery Store -- 60th Street North and Nova Scotia Avenue — File No. 798.02 - -10.01 May 19, 2010 Page 4 of 4