HomeMy WebLinkAboutPL 2004-00474 New Construction "City of Oak Park Heigh METER NO:
14168 Oak Park Blvd. N. #2007
Oak Park Heights, MN 55082-2007 PERMIT N0. : 0400474
651/439-4439 FAX: 651/439-0574DATE ISSUED: 10/26/2004
Address : 13341 60th St N
PIN : TO-040-12
Legal Desc : Subdivision THE SHOPPES OF OAK PARK HEIGHTS 2ND
: Lot 03- Block 001 Parcel
Permit Type : Plumbing
Property Type : Commercial
Construction Type : New Construction
Activity
Value Of Plumbing 37500
NOTE: CONSTRUCT PER APPROVED PLANS. MUST COMPLY WITH ALL MN STATE BUILDING AND
PLUMBING CODE REQUIREMENTS. 3/4" WATER METER HAS BEEN CHARGED TO GENERAL
CONTRACTORS PERMIT. IF AN IRRIGATION SYSTEM IS BEING INSTALLED A PERMIT
MUST BE PULLED FOR THE SAME AND A SEPARATE METER INSTALLED.
OWNER PLUMBING-COMMERCIAL $375.00
Halle Properties Llc PLUMBING STATE SURCHARGE COM $0.50
20225 N Scottsdale Rd Total $375.50
Scottsdale, AZ 55337- Paid with check # 72767
APPLICANT (651/464-2988)
COMMERCIAL PLUMBING & HEATING INC
24428 Greenway Ave
Forest Lake, MN 55025
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be
performed according to : (1) the conditions of this
permit; (2)the approval plans and specifications; (3)the
applicable city approvals,Ordinances,and Codes; and,
(4) the State Building Code.This permit is for only the
work described, and does not grant permission for
additional or related work which requires separate
permits.This permit will expire and become null and
void if work is not started within 180 days,or if work
is suspended or abandoned for a period of 180 days any
time after work has commenced. The applicant is
responsible for assuring all required inspections are
requested in conformance with the Minnesota State Building
Code.
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CONTRACTORS MATERIAL &TEST CERTIFICATE FOR ABOVEGROUND PIPING
PROCEDURE:
Upon completion or work,inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall
be left in service before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners,and contractor. It is understood
the owner's representative's signature in no way prejudices any claim for faulty material,poor workmanship,or failure to comply with approving authority's
requirements or local ordinances.
PROPERTY NAME: Discount Tire DATE: 12-23-04
PROPERTY ADDRESS: 13341 60th Street N
ACCEPTED BY APPROVING AUTHORITIES(NAMES)
City of Oak Park Heights
PLANS ADDRESS:
INSTALLATION CONFORMS TO ACCEPTED PLANS YES 0 NO
EQUIPMENT USED IS APPROVED YES p NO
IF NO,EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT V] YES ❑ NO
IF NO,EXPLAIN
INSTRUCTIONS
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: YES ❑ NO
t SYSTEM COMPONENTS INSTRUCTIONS YES ❑ NO
2.CARE AND MAINTENANCE INSTRUCTIONS YES ❑ NO
3.NFPA 13 YES ❑ NO
LOCATION OF SUPPLIES BUILDINGS
SYSTEM ENTIRE BUILDING
DESCRIPTION MODEL YEAR ORIFICE SIZE TEMPERATURE QUANTITY
Tyco TY-FRB 2004 12" 155 23
Tyco ESFR K-25 2004 1, 165 40
Reliable FIFR 2004 1/2" 155 56
SPRINKLERS
1 to 2 inch Allied XL with 300#Class Ductile iron fittings
PIPE&FITTINGS 2h to 4 inch Allied Dyna Flow with 175#class malleable iron fittings
6"Allied Sch 10 with 175#class malleable iron fittings
ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST
ALARM VALVE GUNNEL: ION
OR FLOW TYPE MAKE MODEL MINUTES SECONDS
INDICATOR Vane Potter VSF-R
DRY VALVE 0.0.D.
MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO.
TIME TO TRIP' WATER AIR TRIP POINT TIME WATER REACHED ALARM OPERATED
THROUGH TEST CONNECTION PRESSURE PRESSURE AIR PRESSURE TEST OUTLET" PROPERLY
MINUTES SECONDS PSI PSI PSI MINUTES SECONDS YES NO
DRY PIPE WITHOUT
OPERATING Q.O.D.
TEST WITH
Q.O.D.
IF N0,EXPLAIN
'MEASURED FROM THE TIME THE INSPECTOR'S TEST CONNECTION IS OPENED.
OPERATION
0 PNEUMATIC El ELECTRIC El HYDRAULIC
PIPING SUPERVISED 0 YES =I NO DETECTING MEDIA SUPERVISED El YES NO
DELUGE
&PREATION DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS Q YES El NO
VALVES IS THERE AN ACCESSIBLE FACILITY IN EACH CURCUIT FOR TESTING IF NO EXPLAIN
El YES E NO
MAKE MODEL DOES EACH CURCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO OPERATE
SUPERVISION LOSS ALARM OPERATE VALVE RELEASE RELEASE
YES NO YES NO MINUTES SECONDS
HYDROSTATIC: HYDROSTATIC TEST SHALL BE MADE AT NOT LESS THAIL460 PS)3.6 BAR)FOR TWO HOURS OR 50 PSI(3.4 BAR)ABOVE
STATIC PRESSURE IN EXCESS OF 150 PSI(10.2 BAR)FOR TWO HOURS. DIFFERENTIAL DRY-PIPE VALVE CLAPPERS SHALL BE LEFT OPEN DURING TEST TO
TEST PREVENT DAMAGE. All ABOVEGROUND PIPING LEAKAGE SHALL BE STOPPED.
DESCRIPTION PNEUMATIC: ESTABLISH 40 PSI(2.7BAR)AIR PRESSURE AND MEASURE DROP WHICH SHALL NOT EXCEED 1-1/2 PSI(0.1 BAR)IN 24 HOURS.
TEST PRESSURE TANKS AT NORMAL WATER LEVEL AND AIR PRESSURE AND MEASURE AIR PRESSURE DROP WHICH SHALL NOT EXCEED 1-1/2 PSI(0.1 BAR)
IN 24 HOURS.
ALL PIPING HYDROSTATICALLY TESTED AT!�VL../ PSI FOR HRS. IF NO,STATE REASON
DRY PIPING PNEUMATICALLY TESTED04 El YES EI NO
EQUIPMENT OPERATES PROPERLY (Z]YES El NO
TESTS DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS,SODIUM SILICATE OR DERIVATIVES OR
SODIUM SILICATES,BRINE,OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS?
g]YES I]NO
DRAIN TEST READING OF GAUGE LOCATED NEAR WATER SUPPLY TEST PIPE: RESIDUAL PRESSURE WITH VALVE IN TEST PIPE OPEN WIDE
STATIC PRESSURE: PSI PSI
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFOR CONNECTION MADE TO SPRINKLER PIPING.
VERIFIED BY COPY OF THE U FORM NO.85B ca YES 0 NO OTHER EXPLAIN:
FLUSHED BY INSTALLATER OF UNDERGROUND X]YES 0 NO
SPRINKLER PIPING
BLANK TESTING NUMBER USED LOCATIONS NUMBER REMOVED
GASKETS
WELDED PIPING Xl YES El NO
IF YES........
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY ]YES Q NO
WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3
WELDING
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED LZI YES 0 NO
IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A ®YES J NO
DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE
RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH,THAT SLAG AND OTHER
WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF
PIPING ARE NOT PENETRATED.
CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL CUTOUTS ]YES J NO
(DISKS) (DISKS)ARE RETRIEVED 7�
HYDRAULIC NAMEPLATE PROVIDED IF NO,EXPLAIN
DATA m
NAMEPLATES / ' YES I]NO
REMARKS DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
Q^ ^C'�
NAME OF SPRINKLER CONTRACTOR: SUMMIT FIRE PROTECTION
SIGNATURES
TEST WITNESSED BY
FOR PROPERTY OWNER(SIGNED) TITLE DATE:
r. D i.A. Q Fdi4 Com Z^
SUMMIT
FOR SPJIN3LERJfO0ZACTe' .IGNED) TITLE DATE: