NOTICE OF CERTIFICATION
STATE OF MINNESOTA )
COUNTY OF WASHINGTON ) ss.
CITY OF OAK PARK HEIGHTS }
I, the undersigned being duly qualified and acting as City Administrator for the City of
Oak Park Heights, Minnesota DO THEREBY CERTIFY that I have compared the attached
document:
Conditional Use Pernut
Design Guidelines/Site Plan Review
,For
New Office Building and Warehouse
(Croixview Holdings, LLC}
At
54I6 Stagecoach Frail N.
with the original thereof on file at the offices of the City of Oak Park Heights, and that the same
is a full, true, and complete copy of said document within the files of the City of Oak Park
Heights.
WITNESS my hand and the seal of the City of Oak Park,14ei its,,kis 27th day of
January, 2023.
Eric Jgfinso
City �dmi istrator
CITY OF OAK PARK HEIGHTS
CONDITIONAL USE PERMIT AND DESIGN GUIDELINES/SITE PLAN REVIEW FOR A NEW
OFFICE BUILDING AND WAREHOUSE AT 5416 STAGECOACH TRAIL, NORTH, OAK PARK
HEIGHTS, MN
Planners File No.: 236.02 — 22.10 Date Issued: 1/12/23
City Council Approval November 14, 2022
Legal Description: (Washington County Geo. Code 03.029.20.31.0002)
THE SOUTH 262 FEET OF THE NORT 494 FEET OF THE EAST 233 FEET OF THE
NORTHEAST'/40F THE SOUTHWEST/40F SECTION 3, TOWNSHIP 29, RANGE 20,
EXCEPTING THEREFROM THAT PART TAKEN FOR HIGHWAY
AND
ALL THAT PART OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF
SECTION 3, TOWNSHIP 29 NORTH, RANGE 20 WEST AND RUNNING THENCE SOUTH 1
DEGREE OF 30' EAST ALONG THE CENTERLINE OF SAID SECTION 3 FOR A DISTANCE
OF 234 FEET SO THE POINT OF BEGINNING OF THE LAND HEREBY CONVEYED;
FROM SAID POINT OF BEGINNING CONTINUING SOUTH ON THE AFORESAID LINE
EXTENDED IN A STRAIGHT LINE TO THE POINT WHERE IT INTERSECTS THE WEST
BOUNDARY OF THE STILLWATER AND POINT DOUGLAS ROAD ALSO KNOWN AS
HIGHWAY 21; RUNNING THENCE NORTHEASTERLY ALONG THE WEST BOUNDARY
OF SAID STILLWATER AND POINT DOUGLAS ROAD TO A POINT WHERE IT
INTERSECTS A LINE PARALLEL TO AND 232 FEET SOUTH OF THE NORTH LINE OF
THE SOUTHEAST QUARTER OF SECTION 3, TOWNSHIP 29 NORTH, RANGE 20;
RUNNING THENCE WESTERLY IN A STRAIGHT LINE TO THE POINT OF BEGINNING,
BEING A TRIANGULAR PIECE OF AND ADJACENT TO EASTERLY OF AND HAVING AS
ITS NORTHERN BOUNDARY THE EXTENDED NORTH BOUNDARY OF THAT LAND
Owner: City of Oak Park Heights
14168 Oak Park BLVD N
Oak Park Heights, N1N 55082
Buyer: Croixview Holdings, LLC
415 Lakeside Drive South, P.O. Box 53
Bayport, N1N 55003
Applicant: Tim Siegfried of Croixview Holdings, LLC
415 Lakeside Drive South, P.O. Box 53
Bayport, N1N 55003
Site Address: 5416 STAGECOACH TRL N.
OAK PARK HEIGHTS, MN 50082
Present Zoning District: B -W BUSINESS WAREHOUSE DISTRICT
Permitted uses set forth in Ordinance 401 Section 401.31 E.
L CUP PERMIT FOR:
The City of Oak Park Heights approved an application from Croixview Holdings, LLC for a Conditional
Use Permit and Design Guideline Review in relation to Applicant's plans to build a new office building
and warehouse located on the site, a 1.45 acres parcel located at 5416 Stagecoach TRL N.
Purpose of this project is to construct a new office warehouse building to house a small general contracting
company. The site will have approximately 12,100 square feet of indoor heated warehouse space. It will
also have approximately 3,900 square feet of single -story office space to house office staff, provide a
conference room, break area and restrooms. In addition, Applicant requested a Conditional Use Permit to
use a portion of the site for screened and secured outdoor storage.
The warehouse building will be constructed of tip up panels to be tan or natural color with masonry
accents. The warehouse will also have (1) loading dock door to accommodate incidental straight truck or
semi -truck deliveries. The office portion will be single story with modular brick veneer, with possibly
two colors of brick and some architectural corbels and recesses.
Applicant intends to have compliant address numbers on the building and business signage will be on the
main entry doors. There is no intention for a monument sign or lighted business signage on the building.
Storm water management will be through a filtration type system, as this area does fall in the DOC
DWSMA, as shown in the source water protection web map that is included in this packet. Middle St
Croix Watershed Management Organization was contacted and discussed water quality goals and
submittal process for this project site. A Wetland Delineation Report completed by Bopray Environmental.
It was determined that there are no wetlands on this site.
Planning Staff prepared planning reports dated November 3, 2022, reviewing the request, and the Planning
Commission held a public hearing on November 10, 2022 and recommended approval with conditions.
The City Council considered all materials, staff reports, and recommendations on November 14, 2022 and
passed a Resolution approving the Conditional Use Permit, and site plan/design guidelines review subject
to conditions as follows:
IL ADDITIONAL RESTRICTIONS AND CONDITIONS.
1. Final plans shall be provided including details on screening, landscaping, grading, drainage,
utilities, lighting, mechanical screening, signage, and any site or building changes subject to review of the
Planning Commission and approval of the City Council.
2
2. The access points are subject to review and approval of Washington County.
3. The final grading, drainage and utility plans shall be subject to the review and approval of the City
Engineer. The drainage plans shall be subject to the review of the Middle St. Croix Watershed District.
4. All lighting fixtures shall be full cut off and installed in compliance with the lighting standards of
the Zoning Ordinance. The final plans shall be subject to City Staff
5. The outdoor lighting shall be turned off one hour after closing, except for approved security
lighting.
6. The final berming, landscape, fencing and tree removal/replacement plans are subject to review
and approval of the City Arborist.
7. All signage shall be subject to final review and approval of City Staff for conformance with Zoning
Ordinance standards.
8. All noise generated from the store shall be compliant with Section 401.15.B.11 of the Zoning
Ordinance. The service doors to the building shall be always closed except when vehicles are moved in
and out of the warehouse building.
9. Hours of operation shall be limited to 6:00 AM to 9:00 PM Monday through Friday, and 7:00 AM
to 5:00 PM Saturday and Sunday.
10. There shall be no parking of vehicles on the north driveway except for in designated parking stalls.
11. Mechanical equipment located on the roof shall be screened from view from street level and from
neighboring properties, with materials that blend harmoniously with the building facade materials and in
accordance with Section 401.15.E.10.e of the Zoning Ordinance.
12. The Planning Commission was favorable to, and the City Council approves the building design,
transparency of the front facade and compatibility with the Design Guidelines.
13. The Planning Commission was favorable to, and the City Council approves the building material
selection and colors.
14. The applicant shall be required to enter into a Development Agreement in a form acceptable to the
City Attorney and City Council.
15. The Applicant shall dedicate to the City at no cost an easement on the subject property, as required
by the City Engineer, to accommodate a six (6) foot trail as shown in the Conceptual Landscape Plan.
The timeline for such trail construction is unknown at this time and is anticipated to be in coordination
with a future Washington County regional trail project. This condition and easement may be voided by
the City in its related documentation in event Washington County does not provide two access points onto
Stagecoach Trail North as shown on the Site Plan.
III. Reference Attachment:
The reports of the City Planner dated Novernber 3, 2022, and all exhibits and site plans approved by
the City Council are annexed hereto by reference as Exhibit A.
IV. Abandonment: This permit requires continuous use in order to preserve the Conditional Uses granted
by the City Under the terms hereof. Any discontinuation or abandonment of the uses permitted
hereunder upon the site ,for a period of 12 continuous months shall void the permit.
V. Annual review: An annual review is not unposed as a condition of this permit.
IN WITNESS WHEREOF, the parties have set forth their hands and seals.
Date: `� ��
Date:
Date: �
This instrument drafted by:
Eckberg Lammers, P.C. (KSS)
1809 Northwestern Avenue
Stillwater, MN 55082
CITY OF OAK PARK HEIGHTS
By
M r cComber, Mayor
By
Er" Johnson, ity-Administrator
y
Croixview Holdings, ILC
By----
Tiinothy Siegfried
Title: President
EXHIBIT A -
To Conditional Use Permit
Tim Siegfried of Croixview Holdings, LLC
See attached
RESOLUTION NO. 22-11-37
CITY COUNCIL
CITY OF OAK PARK HEIGHTS
WASHING'T'ON COUNTY, MINNESOTA
RESOLUTIONA RESOLUTION ESTABLISHING FINDINGS OF FACT AND
OF ,
REQUEST BY TIM SIEGFRIED OF CROIXVIEW HOLDINGS, LLC
FOR CONDITIONAL USE PERMIT AND DESIGN
PLAN REVIEW ■
A NEW OFFICE
BUILDING AND WAREHOUSE AT 5416 STAGECOACH TRAIL
NORTH
■ ; APPROVED
, 1 1 ■
WHEREAS, the City of Oak Park Heights has received a request from Tim Siegfried of
Croixview Holdings for a Conditional Use Permit to allow for outdoor storage and
Design Guidelines/Site Plan review for construction of a new office building and
warehouse at 5416 Stagecoach Trail North, and after having conducted a public hearing
relative thereto, the Planning Commission of Oak Park Heights recommended that the
request be approved with conditions. The City Council of the City of Oak Park Heights
makes the following findings of fact and resolution.
1. The real property affected by said application is legally described as
follows, to wit:
SEE ATTACHMENT A
and
2. The applicant has submitted an application and supporting documentation
to the Community Development Department consisting of the following items:
SEE ATTACHMENT B
and
3. The property is zoned B -W, Business Warehouse District. Office
buildings and warehouses are a permitted use, and a Conditional Use Permit is required
to allow outdoor storage; and
4. The plans that have been submitted to date are in a preliminary format.
The Applicant has requested the Conditional Use Pen -nit review of conceptual plans so
that there is an assurance that the project can move forward prior to securing the property.
If the Conditional Use Pennit is approved, the final plans will be produced and reviewed
by the Planning Commission, with final approval by the City Council; and
5. Design Guideline/Site Plan approval is required for the new building and
site improvements; and
h. City staff prepared a planning report dated November 3, 2022, reviewing
the request; and
7. Said report recommended approval of the Conditional Use Pennit, and
Design Guidelines/Site Plan review subject to the fulfillment of conditions; and
S. The Planning Commission held a public hearing at their November 10,
2022, meeting, took comments from the applicants and public, closed the public hearing,
and recommended the application with conditions.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL FOR
THE CITY OF OAK PARK HEIGH'T'S THAT THE CITY COUNCIL APPROVES
THE FOLLOWING:
A. The application submitted by Tim Siegfried of Croixview Holdings for a
Conditional Use Pen -nit to allow for outdoor storage and Design Guidelines/Site Plan
review for construction of a new office building and warehouse at 5416 Stagecoach Trail
North and affecting the real property as follows:
SEE ATTACHMENT A
Be and the same as hereby approved by the City Council of the City of Oak Park Heights
the following, subject to the conditions as follows:
® Conditional Use Permit for Outdoor Storage
• Site Plan/Design Standards Review
1. Final plans shall be provided including details on screening, landscaping,
grading, drainage, utilities, lighting, mechanical screening, signage, and
any site or building changes subject to review of the Planning Commission
and approval of the City Council.
2. The access points are subject to review and approval of Washington
County.
3. The final grading, drainage and utility plans shall be subject to the review
and approval of the City Engineer. The drainage plans shall be subject to
the review of the Middle St. Croix Watershed District.
4. All lighting fixtures shall be full cut off and installed in compliance with
the lighting standards of the Zoning Ordinance. The final plans shall be
subject to City Staff.
2
5. The outdoor lighting shall be turned off one hour after closing, except for
approved security lighting.
6. The final benning, landscape, fencing and tree removal/replacement plans
are subject to review and approval of the City Arborist.
7. All signage shall be subject to final review and approval of City Staff for
conformance with Zoning Ordinance standards.
S. All noise generated from the store shall be compliant with Section
401.15.13.11 of the Zoning Ordinance. The service doors to the building
shall be always closed except when vehicles are moved in and out of the
warehouse building.
9. Hours of operation shall be limited to 6:00 AM to 9:00 PM Monday
through Friday, and 7:00 AM to 5.00 PM Saturday and Sunday,
10. There shall be no parking of vehicles on the north driveway except for in
designated parking stalls.
11. Mechanical equipment that is located on the roof or visible from street
level or from neighboring properties shall be screened with materials that
blend harmoniously with the building facade materials and in accordance
with Section 401.15.E.10.e of the Zoning Ordinance.
12. The Planning Commission was favorable to, and the City Council
approves the building design, transparency of the front facade and
compatibility with the Design Guidelines.
13. The Planning Commission was favorable to, and the City Council
approves the building material selection and colors.
I4. The applicant shall be required to enter into a Development Agreement.
The development agreement shall be subject to the review and approval of
the City Attorney and City Council.
15, The Applicant shall dedicate to the City at no cost an easement on the
subject property, as required by the City Engineer, to accommodate a six
(6) foot trail as shown in the Conceptual Landscape Plan. The timeline for
such trail construction is unknown at this time and is anticipated to be in
coordination with a future Washington County regional trail project. This
condition and easement may be voided by the City in its related
documentation in event Washington County does not provide two access
points onto Stagecoach Trail North as shown on the Site Plan.
3
Approved by the City Council of the City of Oak Park Heights this 14th day of
NnVPmhP.r ?0??
�p
Conditional Use Permit
For
Outside Storage
And
Design Guidelines/Site Plan Review
For
New Office Building & Warehouse
Croixview Holdings LLC
5416 Stagecoach Trail, N.
Washington County Property Identification Number: 03.029.20.31.0002
Physical Address: 541.6 Stagecoach Trail, N.
Conditional Use Permit
For
Outside Storage
And
Design Guidelines/Site Plan Review
For
New Office Building & Warehouse
Croixview Holdings LLC
5416 Stagecoach Trail, N.
Application Materials
• Application form
• Fees
• Plan Sets
• Written Narrative and Graphic Materials .Explaining Proposal
• Proof of Ownership or Authorization to Proceed
Planning Commission Review & Recommendation: November 10, 2022
Conditional Use Permit:
Unless the City Council specifically approves a different time when action is officially taken on
the request, the conditional use permit shall become null and void twelve (12) months after the
date of approval, unless the property owner or applicant has substantially started the construction
of any building, structure, addition or alteration, or use requested as part of the conditional use.
An application to extend the approval of a conditional use permit shall be submitted to the
Zoning Administrator not less than thirty (30) days before the expiration of said approval.
(401.03.C.4.a and b)
3601 Thurston Avenue N, Suite 100
Anoka, MN 55303
Phone: 763.231 .5840
Facsimile: 763.427.0620
TPCTPCgRanningCo-com
TO: Eric Johnson
FROM: Scott Richards
DATE: November 3, 2022
LL`s t�
RE: Oak Park Heights — Croixview Holdings, LLC — George Siegfried
Construction Company Office Building— Conditional Use Permit,
Outside Storage, Design Guidelines/Site Plan Review — 5416
Stagecoach Trail North
TPC FILE
BACKGROUND
236.02 — 22.10
Tim Siegfried of Croixview Holdings, LLC (Applicant) has made application for
construction of a new office building and warehouse building at 5416 Stagecoach Trail
North. The property is owned by the City and is located between the Minnesota
Correctional Facility Stillwater and Perro Pond. The application consists of requests for
a Conditional Use Permit to allow for outdoor storage and Site Plan/Design Guidelines
review. The property is currently undeveloped.
The site is 1.45 acres in size with partial tree cover and is zoned B -W Business
Warehouse District. The proposed building will have a 3..,900 square foot office and
12,100 square feet of indoor heated warehouse space for a general contracting
company.
EXHIBITS
The review is based upon the following submittals:
Exhibit 1:
Project Narrative — 10/11/2022
Exhibit 2:
Supplemental Narrative -- 10/31/2022
Exhibit 3:
Existing Conditions Survey
Exhibit 4:
Tree Survey
Exhibit 5.
Site Plan
Exhibit 6:
Conceptual Landscape Plan
Exhibit 7:
Concept Image 1
Exhibit 8:
Concept Image 2
Exhibit 9:
Overall Floor Plan (Al)
Exhibit 10:
Office Floor Plan (A2)
Exhibit 11:
Roof Plan (A3)
Exhibit 12:
Elevations (A4)
Exhibit 13:
Elevations (A5)
Exhibit 14:
Site/Building Elevations (CD4)
Exhibit 15:
Site/Building Elevations (CD5)
PROJECT DESCRIPTION
The Applicant has provided a project narrative that is found as Exhibit 1 of this report.
Purpose of this project is to construct a new office warehouse building to house a small
general contracting company. The site will have approximately 12,100 square feet of
indoor heated warehouse space. It will also have approximately 3,900 square feet of
single -story office space to house office staff, provide a conference room, break area
and restrooms. In addition, we will seek a Conditional Use Permit for a portion of
outdoor storage. The storage will be screened and secured.
The warehouse building will be constructed of tip up panels to be tan or natural color
with possibly some masonry accents. The warehouse will also have (1) loading dock
door to accommodate incidental straight truck or semi -truck deliveries. The office
portion will be single story with modular brick veneer, with possibly two colors of brick
and some architectural corbels and recesses. All roof top mechanical units will be
screened as required by city ordinance..
There is no intention of constructing a monument sign or lighted business signage on
the building. The owner's intent is to have compliant address numbers on the building
and business signage will be on the main entry doors. All site lighting will be full cut off
lighting as required by the city ordinance.
Storm water management will be through a filtration type system, as this area does fall
in the DOC DWSMA, as shown in the source water protection web map that is included
in this packet.
We have contacted the Middle St Croix Watershed Management Organization and
discussed water quality goals and submittal process for this project site.
We have also had a Wetland Delineation Report completed by Bopray Environmental.
It was determined that there are not wetlands on this site. We have provided the
document with this submittal package also.
Note: These are preliminary conceptual plans. Once this preliminary submittal is
approved and a developers agreement signed and the land is purchased from the City
of Oak Park Heights, we will proceed with final architectural drawings and site plans for
review and approval.
8
Surrounding Properties.
North — Three single family homes
East — State of Minnesota Correctional Facility Stillwater
South — Minnehaha Transportation Inc.
West — Perro Pond/Open Space
ISSUES ANALYSIS
Preliminary Plans. The plans that have been submitted to date are in a preliminary
format. The Applicant has requested the Conditional Use Permit review of conceptual
plans so that there is an assurance that the project can move forward prior to securing
the property. If the Conditional Use Permit is approved, the final plans will be produced
and reviewed by the Planning Commission, with final approval by the City Council. In
that the City is the property owner, the City Council will have the final decision in
approval of the land sale, developer's agreement, and plans.
Comprehensive Plan. The property is designated as Residential/Business Transitional
on the proposed Land Use Map. The proposed business, with most of the activity
located on the south side of the subject property will not create a significant impact to
the residential properties to the north. The proposed business will be consistent with
this land use designation.
Zoning. The property is zoned B -W Business Warehouse District. A Conditional Use
Permit is required to allow open and outdoor storage including the parking of
commercial vehicles. The Applicant has indicated that the commercial vehicles will be
stored inside the building most of the time, but on occasion a vehicle will be left in an
outdoor screened area.
Section 401.31.E.1 of the Zoning Ordinance lists criteria for review of open and outdoor
storage. A review of those criteria is found as follows in this report.
Setbacks. The B -W District requires a 50 -foot front yard setback, 20 -foot side yard
setback and 20 -foot rear yard setback. The building will have a setback of 50 feet on
the front at Stagecoach Trail, 50 feet to the north property line, 52 feet to the west, and
85 feet to the south. The setback requirement for parking is 10 feet from property lines.
The parking and driveway setbacks will be 20 feet at the front, 20 feet to the north, 20
feet to the west and 10 feet to the south. All the setbacks are compliant.
Building Height. The building height maximum in the B -W District is 35 feet. At its
highest point, the building will be 24 feet to the top of the parapet.
Access. The site will be accessed by two curb cuts to Stagecoach Trail North. The
curb cuts are subject to review and approval of Washington County. The County would
prefer one access to the site, at the north side of the property. Discussions with the
County will continue as the review process continues.
3
Pedestrian Access. The landscape plan shows a proposed trail on the subject
property along Stagecoach Trail. Currently there is no trail established along that
roadway. The trail could be constructed later as part of a County project. The Applicant
small provide area and an easement for the trail within the subject property.
Parking.. Section 401.15.F.9 of the Zoning Ordinance for offices requires three parking
spaces plus one additional space for each 200 square feet of floor area and for the
warehouse space, one space for each 1,500 square feet of floor area. The parking
calculation for this site is as follows:
3,900 square feet x .9 =
12,100 square feet x .9
Total Requirement
3,510 1200 + 3 = 21 spaces
10,890 / 1500 = 7 spaces
28 spaces
The site plan indicates that there are 25 exterior parking stalls planned for the
development, two of which are disability accessible. Additionally, there is more than
adequate space in the warehouse area that will accommodate the additional three
vehicles. The layout as designed will meet the required number of parking stalls and
disability accessible stalls.
The parking spaces and driveway aisles are sized in accordance with the Zoning
Ordinance. The parking area will be surrounded by curb and gutter. All the parking
areas are setback from the property lines at least 10 feet, in compliance with the
requirements. The parking areas are surrounded with landscaping.
Screening. The conceptual landscape plan includes berms, landscaping and fencing
surrounding the property to screen the driveways and loading areas. The fenced area
will be gated at both accesses to the rear of the property. Adequate screening will need
to be provided especially to the single family properties to the north of the site. Details
on this screening will be provided for final approval.
Loading Areas. The loading access to the building will be at the southwest side of the
building and will be in the area that is screened with landscaping and fence.
Trash/Recycling. Details on a trash/recycling storage area have not been included on
the plans, but it will be located within the fenced area of the lot. Additional details will
need to be provided for final review.
Grading/Drainage/Utilities. Grading, drainage, and utility plans have not been
provided yet with sufficient detail. The Applicant has indicated a preliminary review of
the stormwater and utilities has been done and the site can accommodate the building,
driveways and parking areas with adequate utilities and stormwater retention. The final
grading, drainage and utility plans shall be subject to review and approval of the City
Engineer and the Middle St. Croix Watershed District.
Lighting Plans. The Applicant has indicated that the lighting for the site will be full cut
off and designed to meet City requirements. The final lighting plan will need to show a
4
minimal amount of lighting on the north side of the site so as not to impact the
neighboring single family residences. A final lighting plan will be provided for review.
Landscaping. The project will require removal of existing trees and a tree preservation
plan. The preliminary landscape plan indicates plantings surrounding the parking lot
and drive aisles as well as the front of the property. The final landscape plan is subject
to the review and approval of the City Arborist.
Mechanical Screening. Any exterior mechanical equipment, either on the roof or
ground mounted will need to be screened in accordance with Section 401.15.E.10.e. of
the Zoning Ordinance. The final plans shall show the locations of mechanical
equipment and screening.
Signage. The Applicant has indicated that no monument sign is proposed for the site.
The only signage proposed at this time will be the business name on the main entry
door and required address signage.
Noise. Residential properties exist to the north of the proposed business. The service
doors for the business will face south, away from the residential properties. The service
doors to the building shall be required to remain closed except when vehicles are
moved in and out of the warehouse area. Limitations on hours of operation will be
included as a condition of approval.
Conditional Use Permit Review Criteria.
401.3'.E. Conditional Uses. The following are conditional uses in a B -W District
(Requires a conditional use permit based upon procedures set forth in and regulated by
Section 401.03 of this Ordinance):
1. Open and outdoor storage including the parking of commercial vehicles in excess
of that allowed as a permitted accessory use as and accessory use provided
that:
a. The storage area is landscaped, fenced, and screened from view of
neighboring uses and abutting residential districts.
Comment; The most active portion of the site will be shielded from the
residential properties by the proposed building. A final landscape plan will
be provided by the Applicant that provides a berm, landscaping, and a
fence.
b. Storage is landscaped and screened from view from the public right-of-
way.
Comment: The Applicant has indicated that most of the equipment and any
materials will be stored inside the building. A final landscape plan will be
provided by the Applicant that provides a berm, landscaping, and a fence.
5
C. Storage area is blacktopped, or concrete surfaced.
Comment: The storage area will be paved and surrounded by with concrete
curbs.
d. All lighting shall be hooded and so directed that the light source shall not
be visible from the public right-of-way or from neighboring residences.
Comment: A final lighting plan will be provided by the Applicant subject to
approval of the City Council.
e. The storage area does not take up parking space or loading space as
required for conformity to this Ordinance.
Comment: There is adequate parking provided onsite and in the building.
f. The provisions of Section 401.03 of this Ordinance are considered and
satisfactorily met.
Comment: The provisions are reviewed as follows.
Section 401.03.A.7 City Council and Planning Commission Considerations.
The Planning Commission and City Council should also consider the conditional use
permit criteria, found in Section 401.03.A.7 of the Zoning Ordinance, as follows:
I. Relationship to the specific policies and provisions of the municipal
comprehensive plan.
2. The conformity with present and future land uses in the area.
3. The environmental issues and geographic area involved..
4. Whether the use will tend to or actually depreciate the area in which it is
proposed.
5. The impact on character of the surrounding area.
6. The demonstrated need for such use.
7. Traffic generation by the use in relation to capabilities of streets serving the
property.
8. The impact upon existing public services and facilities including parks,
schools, streets, and utilities, and the City's service capacity.
9. The proposed use's conformity with al/ performance standards contained
herein (i.e., parking, loading, noise, etc.).
Comment: The Planning Commission and City Council should review the above criteria
regarding the request for the Conditional Use Permit. The business should not have an
adverse impact on the surrounding area or neighbors. There are residential properties
to the north of the proposed building, but most of the business activity will be to the
south. The Applicant has proposed significant landscaping, a berm, and a fence to
provide screening. City Staff sees no issues with the request as proposed but reserves
6
the right to request final plans for Planning Commission review and City Council
approval.
Design Guidelines.
Architectural Guidelines.
Facade Treatments
The building will have a variety of fagade detailing that will provide visual interest
on all sides of the building.
Ground Level Expression
This is a one-story building with a prominent front entrance facing Stagecoach
Trail.
Transparency
The building office has adequate transparency, but the warehouse, because of
the type of building will not. The Planning Commission should comment.
Entries
The building features a prominent entry into the office.
Roof Design
The roofline is broken by different roofline heights at the entry, office area and
warehouse area. The rooftop mechanical units will be screened. The Planning
Commission should comment.
Building Colors
The Design Guidelines indicate that building materials should accent, blend with,
or complement the surroundings. Warm toned colors are encouraged. The
building colors are of a warm tone. A building materials board will be provided
for review.
Building Materials
The Applicant has provided elevations with the building materials identified and
color elevations for review. The facades will be glass, brick, and concrete tip up
panels with inset brick. The Planning Commission should comment on the
acceptability of these materials
Franchise Architecture
The building is not a franchise design.
Site Design Guidelines
Building Placement
7
The proposed building has an entrance facing the access roadway.
Parking Areas
The parking area is landscaped with perimeter plantings.
.Stnrm wntpr
Storm water will be addressed by the City Engineer as part of the final plan
review.
Pedestrian and Common Space
Currently, there is no trail along Stagecoach Trail. The plans will show a trail
along Stagecoach Trail on the subject property.
Landscaping
The parking lot, storage area, and driveways are to be landscaped and screened.
Trees/Shrubs
The trees and shrubs used in the final landscape plan shall be subject to the
review and approval of the City Arborist. The preliminary plan indicates
extensive landscaping.
Fencing
A fence has been proposed with the design to be provided as part of the final
plan review
UtiIites/Service/Loading/Drive-Th rough/Storage Areas
Addressed elsewhere in the planning report.
Lighting
Addressed elsewhere in the planning report.
Signage
Addressed elsewhere in the planning report.
Pedestrian/ Bicycle Routes
The site will be designed to accommodate a future trail along Stagecoach Trail.
Development Agreement, The Applicant will be required to enter into a development
agreement with the City.. The development agreement shall be subject to review and
approval of the City Attorney and City Council with the final plan set.
CONCLUSION I RECOMMENDATION
Subject to the requests for a Conditional Use Permit, Site Plan and Design Guidelines
Review for construction of a new office building and warehouse building at 5416
M
Stagecoach Trail North. City Staff would recommend approval of the following listed
requests subject to the conditions as follows:
• Conditional Use Permit for Outdoor Storage
• Site Plan/Design Standards Review
1. Final plans shall be provided including details on screening, landscaping,
grading, drainage, utilities, lighting, mechanical screening, signage, and
any site or building changes subject to review of the Planning Commission
and approval of the City Council.
2. The access points are subject to review and approval of Washington
County.
3. The final grading, drainage and utility plans shall be subject to the review
and approval of the City Engineer. The drainage plans shall be subject to
the review of the Middle St. Croix Watershed District.
4. All lighting fixtures shall be full cut off and installed in compliance with the
lighting standards of the Zoning Ordinance. The final plans shall be
subject to City Staff.
5. The outdoor lighting shall be turned off one hour after closing, except for
approved security lighting.
6. The final berming, landscape, fencing and tree removal/replacement plans
are subject to review and approval of the City Arborist,
7. All signage shall be subject to final review and approval of City Staff for
conformance with Zoning Ordinance standards.
8. All noise generated from the store shall be compliant with Section
401.15.B.11 of the Zoning Ordinance. The service doors to the building
shall be always closed except when vehicles are moved in and out of the
warehouse building.
9. Hours of operation shall be limited to 6:00 AM to 9:00 PM Monday through
Friday, and 7:00 AM to 5:00 PM Saturday and Sunday
10. Mechanical equipment that is located on the roof or visible from street
level or from neighboring properties shall be screened with materials that
blend harmoniously with the building fapade materials and in accordance
with Section 401.15.E.10.e of the Zoning Ordinance.
11. The Planning Commission should discuss the building design,
transparency of the front facade and determine compatibility with the
Design Guidelines.
9
12. The Planning Commission should comment on the building material
selection and colors and the Applicant shall provide building material
samples for Planning Commission and City Council review.
13. The applicant shall be required to enter into a Development Agreement.
The development agreement shall be subject to the review and approval
of the City Attorney and City Council.
14. The Applicant shall dedicate to the City at no cost an easement on the
subject property, as required by the City Engineer, to accommodate a six
(6) foot trail as shown in the Conceptual Landscape Plan. The timeline for
such trail construction is unknown at this time and is anticipated to be in
coordination with a future Washington County regional trail project. This
condition and easement may be voided by the City in its related
documentation in event Washington County does not provide two access
points onto Stagecoach Trail North as shown on the Site Plan.
PC: Julie Hultman
10
GEORGE
IEGFRIED
CONSTRUCTION COMPANY
Commercial Industrial . Residential
510 Perro Cree!w Drive, Bayport, W1 5500_3 w +x,51.275.1112 office a 551.275.11 13 foo i e,,Pay.sieafriedconstruc�ion.conI
10/11/2022
City of Oak Park Heights
14168 Oak Park Blvd N
Oak Park, MN 55082
Re: Development Application for site 5416 Stagecoach Trail North, Oak Park Heights, MN
Project Narrative
Purpose of this project is to construct a new office warehouse building to house a small general
contracting company. The site will have approximately 12,100 square feet of indoor heated
warehouse space. It will also have approximately 3,900 square feet of single -story office space
to house office staff, provide a conference room, break area and restrooms. In addition, we will
seek a Conditional Use Permit for a portion of outdoor storage. The storage will be screened
and secured.
The warehouse building will be constructed out of tip up panels to be a tan or natural color with
possibly some masonry accents. The warehouse will also have (1) loading dock door to
accommodate incidental straight truck or semi -truck deliveries. The office portion will be single
story with a modular brick veneer, with possibly two colors of brick and some architectural
corbels and recesses. All roof top mechanical units will be screened as required by city
ordinance.
There is no intention of constructing a monument sign or lighted business signage on the
building. The owner's intent to have compliant address numbers on the building and business
signage will be on the main entry doors. All site lighting will be cut off lighting as required by the
city ordinance..
Storm water management will be through a filtration type system, as this area does fall in the
DOC DWSMA, as shown in the source water protection web map that is included in this packet.
We have contacted the Middle St Croix Watershed Management Organization and discussed
water quality goals and submittal process for this project site.
We have also had a Wetland Delineation Report completed by Bopray Environmental. It was
determined that there are no wetlands on this site. We have provided the document with this
submittal package also.
Note: These are preliminary conceptual plans. Once this preliminary submittal is approved and
a developers agreement signed and the land is purchased from the City of Oak Park Heights,
we will proceed with final architectural drawings and site plans for review and approval.
GEORGE
IEGFRIED
CONMUMONAW
Commercial @ Industrial - Residential
�c,, r ro C PcC.I ve :t`+LC t. - +sv. „lir co n5 t.w P .co,
10/31/2022
City of Oak Park Heights
14168 Oak Park Blvd N
Oak Park, MN 55082
Re: Development Application for site 5416 Stagecoach Trail North, Oak Park Heights, MN
Review Responses:
1) We have looked into site utilities and have determined that we can tie into the city sewer
and water supply, the civil drawings will locate the tie ins and detail the connections. in
regards to storm water management our team has determined that we will be able to
meet the requirements of the city and watershed district as required.
2) Washington County has reviewed the concept drawings and stated they typically only
approve one access to a site. Due to an existing turn lane, they are recommending
access to be located at the north end of the property. No final determination has been
made only recommended.
3) Lighting will be full cut off, wall mounted above the doors and parking lot lighting will be
the same. Lighting will be designed to meet the cities requirements and not be excessive
at the outside storage warehouse access area.
4) A tree inventory has been created and submitted. Once approved a landscape plan will
be created and all trees to be removed will be noted along with tree replacement
calculations. This plan will also note plant types and locations.
5) If retaining walls are needed there will be details and engineering notes for these. There
is no intent on creating any kind of free standing or monument type sign. There is no
intent on having lighted building signage. The proposed signage will be vinyl cut stickers
at the main entrance.
6) All roof mounted mechanical equipment will be screened.
7) Trash receptacles will be kept behind privacy fencing that will meet city requirements.
8) A building materials board will be provided.
Regards,
Tim Siegfried
Contact info for purchaser of property
Croixview Holdings, LLC
415 Lakeside Dr S
PO Box 53
Bayport, MN 55003
Tim Siegfried
651-303-7366
tim@siegfriedconstruction.com
N
N
Q
F
`i
y �
'gyp{
W}
U
a w LL
� `��N71�1 •{.LrV11C3'o.� ---�_
-
k
O
tit
L.j
v
o 3
to
Z�
F
`i
y �
'gyp{
W}
U
a w LL
� `��N71�1 •{.LrV11C3'o.� ---�_
-
k
a,Opp, Sl:y
u
LIli
a
�
�kS �
u rn
yt.
t .x Y
8
b
a 3v
� o
k
�
�
3
l
o
c o
s
a'❑
�v.
u
c
0
o-
�•
`•• a
,eos
r-�
a
\
a
c
o00
v
J v
F
`i
y �
'gyp{
._tea'__--�
� `��N71�1 •{.LrV11C3'o.� ---�_
-
k
a,Opp, Sl:y
u
LIli
a
�
�kS �
yt.
t .x Y
8
b
F
k
I
s
o06:0
u
c
0
I
!
c
o00
v
Al
1 s
z'
h
fry
E
�a
2
EERY
2
Ef
=
4
Iw
.,Sm•na
N
�
�ISEr
�y
IFg
�
e��X+�
��pg.�
Y
-
a
'��$,$
� �•5
�
a $
m n�3
3
a
.e.:.. �m
F
`i
y �
'gyp{
._tea'__--�
� `��N71�1 •{.LrV11C3'o.� ---�_
-
k
a,Opp, Sl:y
u
LIli
a
�
�kS �
yt.
`i
'gyp{
._tea'__--�
� `��N71�1 •{.LrV11C3'o.� ---�_
a,Opp, Sl:y
t .x Y
8
b
F
k
I
Al
1 s
z'
h
Ln
tr $`k
Tj UJ
2\k27 \.a-
! y
E
/}E�AJ��
Oz Fz
U ¢i a a r orad �o
i o+ U� a z
LU P
U tis
aE has MF^F 9gl € e3
Eiji
• -
11M,�r
N11131 12
� _ � �� s off. min
Y a �WIN
MEN
pig h
w
w
z F
�L �W �z
LLZ LLJ
LL
LLJ
LLI
----'b``----mss'
�JLLJ
N
o
C�
O
W
W
U
W
�W 4
S/
iV
IL
LU
U
Z
O
U
Q
W
Lxi
C.}
Ld
of
U
U
w
F-
V)
1-0C,
cv
C4
Lr) 0
Elm
N livul
(0
ui
o
LU
LLJ
C-)
LLI
(L
IL
QJ
X-777!t7m'
4.
-F
------------ - - - ------------- -- -
(i)
(7),
Now
0
�� \\��� `f CN
\,}` <
}� �� \ p / �� / I
�- -
� � ^®' �� E . p �\ : !
c
MKom 1141,10 a olelt
-
zeoss
NVJ'S-LH[)lBH)qUVd)IVO
'N IIV'dl
HOV003E)VIS
1
-10
LJ
M
ui
LU
ry
PH
ag!
MUCH
I a Z, I
Z
�� it i I�il
0
0
<
IIW al1
i J� I
K
Oil in,
-t
Pd,
N V,
1� —
1N3W3'JYNYW •. SN OIY31N13kH1J311H Jtlti
p w0'IUoss
omminsomm� Nw 's1HtiiaH >Iavd ado
N IIVU1 "� I
mr # dD li3V03'JV15 9m I I e
'^ry--1N3p3 �JYNYn • S801N31Ni a 381I1��1IpJNY
zBoss
m
NY1'SIH919H )quad kvo
'H1aoN 11"I HOU0030V
I
d s
I� rill'
: . .. .
��/} (/ (�� }
!\ ) / § t y \ \ \
/\\\§/ m !� !
. \ ) �� )
\. �\� ®�\
}}}\.}}}\}�
\\\� \}}\\{
�
§�
j�
�
�
��\
\
/!
�
■.
� �
g #!
�
,� � «
� � �
�� �
g!q
� s
p�
: . .. .
��/} (/ (�� }
!\ ) / § t y \ \ \
/\\\§/ m !� !
. \ ) �� )
\. �\� ®�\
}}}\.}}}\}�
\\\� \}}\\{
�
§�
j�
�