HomeMy WebLinkAbout2003-01-14 Fire Guard Sprinkler Service Inspection Report PG. 0X- PGS. NlgE-GUAIeD '}, -GUARD -� INSPECTION
CONTRCT NO.
INSPECTION - ; In� SPROji.ER SERVICE,INC.
REPORT NO._,
•y.Fj z L'~ 205 White Bear Ave.No.,Suite C MN LICENSE NO: BUREAU
CONFIRMED 44' cia St.Paul,Minnesota 55109 C00018 FILE NO.
WITH PH:651.7489499 • FAX:651-748-9143
REPORT TO: BLDG.NAME: its C j;ml
STREET: ADDRESS: 5-'2. es-- r/'' L 4`/ T4— •
CITY,STATE,ZIP: CITY,STATE,ZIP:
CiA /t / , ,../C rk •
TECHNICIAN: `'1� LICENSE NO. .Jo /SIS DATE: /400._...
OWNER'S SECTION(To be answered by owner or occupant)
A.Explain any occupancy hazard changes since the previous inspection, IVO.0°/e)
B.Describe fire protection modifications made since last inspection. R/U A/C'-
C.Describe any fires since last inspection. #10 ',/c • ,
D.When was the system piping last checked for stoppage,corrosion or foreign material? 44/710.
E.When was the dry-piping system last checked for proper pitch? $./" ti7
F. Are dry valves adequately protected from freezing { S
-.4.-,. n.a. no yes n.a. no
INSPECTOR'S SECTION(All responses reference current inspection) c.Has the operation of the air or nitrogen supply been tested? a
1. GENERAL : Is it in service?
a.Is the building occupied? -10111L.4.4 d.Were low points drained during this inspection? ,
b.Are all systems in service? e.Did quick-opening devices operate satisfactorily?
c.Is there a minimum of 18 in.(457 mm)clearance between the top f. Did the dry valve trip properly during the trip pressure test? Q
of the storage and the sprinkler deflector? g.Did the heating equipment in the dry-pipe valve room operate
d. In areas protected by wet system,does the building appear to be,: i
, at the time of inspection?
properly heated in all areas,including blind attics and perimeter •„
areas,were accessible?Do all exterior openings appear to be ' 7. SPECIAL SYSTEMS(See Item 16)
protected against freezing? a.Did the deluge or pre-action valves operate properly during testing?..
e. Does the hand hose on the sprinkler system appear satisfactory? b.Did the heat-responsive devices operate properly during testing?
c.Did the supervisory devices operate during testing? a"
2. CONTROL VALVES(See item 14)
a. Are.311 sprinkler system control valves all all other valves in the � 8. ALARMS
rrt
appropriate open or closed position? a.Did water motor and gong test satisfactorily?
b.Are all control valves in the open position and locked,sealed or t� b.Did electric alarm test satisfactorily? Pt
equipped with a tamper switch? �L c.Did supervisory alarm service test satisfactorily?
3. WATER SUPPLIES(See item 15) 9. SPRINKLERS
a.Was a water flow test of main drain made at the sprinkler riser? k a.Are all sprinklers free from corrosion,loading or obstruction to spray k
discharge?
4. TANKS,PUMPS,FIRE DEPARTMENT CONNECTIONS b.Are sprinklers over 50 years old,thus requiring sample testing?
a. Are fire pumps,gravity tanks,reservoirs and pressure tanks in 0 c. Is stock of spare sprinklers available?
good condition and properly maintained? 1 d.Does the interior condition of sprinkler system appear to be A,
b. Are fire department connections in satisfactory condition, satisfactory?
couplings free,caps in place,and check valves tight?Are
they accessible and visible? 10. Date dry-pipe valve trip tested(control valve partially open) �,
(see trip test which follows) i /171
5. WET SYSTEMS(See item 13)
a. Are cold weather valves(O.S.&Y.)in the appropriate open a 11. Date dry-pipe valve trip tested(control valve fully open) q,
or closed position? (see trip test which follows)
b. Have antifreeze systems solutions been tested? pt
c. Were the antifreeze test results satisfactory? a 12. Date quick-opening device tested(see ASCOA trip test report) 1
6. DRY SYSTEMS(See items 10 to 14 and attached report) 011. 13. Date deluge or preaction valve tested es
a.Is the dry valve in service?
b. Are the air pressure and priming water level in accordance q 14. See Control Valve Maintenance Table.
with the manufacturer's instructions?
CONTROL MAINTENANCE TABLE
Control Valves Number Type Open`. Secured Closed Signs Explain Abnormal Condition
System Control Valves f Z city y e..5$ z @v y ,--
Other Control Valves
15.WATER FLOW TEST
Test Pipe Size Pressure Flow Pressure Test Pipe Size Pressure Flow Pressure
Located Test Pipe Before Pressure After Located Test Pipe Before Pressure After
"Y/s'" cat-n ti- 2 y G e 9 v e C
16.Type of Equipment y 4 y/ S y c)< /Pa- s Condition: 4..®*e
Manufacturer: /2 C ,/r /?.e.r Model:
Auxiliary Equipment:No? Type? Location? Test-Result?
17.Explain any"No"answers and comments:
18.Adjustments or corrections made during this inspection:
19.Although these comments are not the result of an engineering review,the following desirable improvements are recommended:
WHITE:CLIENT YELLOW:OFFICE PINK:INSURANCE AUTHORITY
PG. OF PGS. FARE GUARD �'1 INSPECTION
FIRE-GUARD CONTRACT NO.
INSPECTION HSERVICE,SPRINKLER INC.
REPORT NO. r2 ? v4,-
¢� 205 Whiff Bear Ave.No.,sults c MN LICENSE NO: BUREAU
CONFIRMED ',4 5 St.Path,Minnesota 55109
WITH PH:651"748.®499 • FAX:651-748-9143 C00018 FILE NO.
REPORT TO: BLDG.NAME: i 0e ,�- 4. `4 / re/v`0
f ' '
STREET: ADDRESS: `rZ $e 7 Q e-h `
a- a`f ri_
CITY,STATE,ZIP:—_ CITY,STATE,ZIP: C'P' k /op.- K /r1 $. rS/
TECHNICIAN: ._ IC)'AI LICENSE NO. a /4641 DATE //>94) 3'
OWNER'S SECTION;To be ar•swered by owner or occupant) " � /C
A.Explain any occup :icy hazard changes since the previous inspection. Alc,
B.Describe fire prote ion moc fications made since last inspection. mai€.•We
C.Describe any fires° -ice last inspection. /y 4a ,tie
D.When was the sysY< 1 pipin,i last checked for stoppage,corrosion o tenial?
'y! i
E.When was the dry-p'ping system last checked for proper pitch? /A
F. Are dry valves adeq,ately rrotected from freezing' /ti ,,i
a
no yes
INSPECTOR'S SECTION(All responses reference current inspection) ® c.Has the operation of the air or nitrogen supply been tested? n.a. no
1. GENERAL
a.Is the buildingoccupied? Is it in service?
d.Were lownts drained during rlttg this inspection?
b.Are E.:systems in service? a`'` e.Did quick-opening devices operate satisfactorily? a
c.Is there a minimum of 18 in.(457 mm)clearance between the top Q f. Did the dry valve trip properly during the trip pressure test? Y
of the storage and the sprinkler deflector? g.Did the heating equipment in the dry-pipe valve roan operate
d. In areas protected by wet system,does the building appear to be at the time of inspection?
properly heated in all areas,including blind attics and perimeter
areas,were accessible?Do all exterior openings appear to be 7. SPECIAL SYSTEMS(See item 16)
ek
protected against freezing? a.Did the deluge or pre-action valves operate properly during testing?..
e. Does the hand hose on the sprinkler system appear satisfactory? L1 b.Did the heat-responsive devices operate properly during testing? "t
c. Did the supervisory devices operate during testing? h
2. CONTROL VALVES(See item 14)
a.Are all sprinkler system control valves all all other valves in the k 8. ALARMS
appropriateopen or closed position? a.Did water motor and gong test satisfactorily? Of
b.Are all control valves in the open position and locked,sealed orOp'' b.Did electric alarm test satisfactorily?
equii_ped with a tamper switch? c.Did supervisory alarm service test satisfactorily? a
3. WATER SUPPLIES(See item 15) M. 9. SPRINKLERS
a.Was a water flow test of main drain made at the sprinkler riser? a.Are all sprinklers free from corrosion,loading or obstruction to spray
discharge? A.
`
4. TANKS,PUMPS,FIRE DEPARTMENT CONNECTIONS b.Are sprinklers over 50 years old,thus requiring sample testing?
a.Are fire pumps,cavity tanks,reservoirs and pressure tanks in (F c.Is stock of spare sprinklers available? 11
good condition r d properly maintained? ' d.Does the interior condition of sprinkler system appear to be a
b. Are f:;a departs:<it connections in-satisfactory condition, ® satisfactory?
#coup.ngs free,,::ps in place,and check valves tight?Are
they accessible ,d visible? 10. Date dry-pipe valve trip tested(control valve partially open) pj
•
(see trip test which follows)
5. WET SYSTEMS(&se item 13)
a. Are cold weather valves(O.S.&Y.)in the appropriate open , ,.= 11. Date dry-pipe valve trip tested(control valve fully open) Q
or closed position? (see trip test which follows)
b. Have antifreeze systems solutions been tested? ;. IKA 4
c. Were the antifreeze test results satisfactory? 12. Date quick-opening device tested(see ASCOA trip test report)
Of
6. DRY SYSTEMS(See items 10 to 14 and attached report) 13. Date deluge or preaction valve tested
a.Is the dry valve in service?
b. Are the air pressure and priming water level in accordance a 14. See Control Valve Maintenance Table. -i
with the manufacturer's instructions?
( VIOL MAINTENANCE TABLE
Control Valves Number Type Open ' red Closed Signs Explain Abnormal Condition •
System Control Valves a $y "Oita" f,8,r [/. $
Other Control Valves 2 �." i,/, y ftf u/ C3
15.WATER FL TEST
Test Pipe Size Pressure Flow Pressure Test Pipe Size Pressure Flow Pressure
Located Test Pipe Before Pressure After Located Test Pipe Before Pressure After
&� s ;Glc 2.'' G C 3 d ,e-e-
16.
d16.Type of Equipment tiv G I // S J y s rg-./"'"I Condition: l,-"e g-el
Manufacturer: _ _ Model:
Auxiliary Equipment:No? Type? Location? Test Result?
17.Explain any"No"answers and comments: x
18.Adjustrrants or corrections made during this inspection: -/VA r(t '
19.Althoug these comments are not the result of an engineering review,the-following desirable improvements are recommended:
WHITE:CLIENT YELLOW:OFFICE PINK:INSURANCE AUTHORITY
,ei
1tE-GUS , . 2055L'A.-.9 Bear Ave.No.,Suite C
J _ f IRE-Gl H St. . ,cul,Minnesota 55109
4..., 11�' - w SPRINKLER SERVICE, ° '' . PH:651-748-9499 • FAX:651-748-9143
� Z.6 ��' MN License No.C00018
5 DRYrr VALVE TEST
NAME OF PROPERTY: lye/c-1- �'LLe4 DATE: i/i y/o2
ADDRESS: .s2 re-Si S 7- 2 c, C•-a °� 1-4.... ISO FILE NO.
CiA is /tear1t i / r_s
DRY"PIPE VALES
NO. 1 NO.2 NO.3
SIZE, MAKE,MODEL&YEAR 41" tett/A.4/c.
OF MANUFACTURER Mc O 0 Ar of 9
CONTROL SPRINKLERS IN 1-1'/.. A /.3 er
PRESSURE(LB.) AIR 3 2.
BEFORE TESTS WATER `ie
CONTROL VALVE WIDE OPEN?
(IF NOT,HOW MANY TURNS?) rt.,y,n
OPERATED AT:
AIR PRESSURE(LB.) / O r s/
TIME(MIN.,SEC.)
OPERATION INDICATE:
(SATISFACTORY,PARTLY S.f f l s If"e<'•i
SATISFACTORY,OR FAILED)
REASON FOR FAILURE OR
PARTLY SATISFACTORY
VALVE RESET DRY? e
jv
LIST REPAIRS MADE bra .../C
CONDITION: - a C.' f
INTERIOR OF BODY
WATER FROM.TEST PIPE
MOVING PARTS
SEALS
RUBBER FACING
ALARMS OPERATED? /.mss
a.
MG DEVICES
MAKE,MODEL,YEAR
OPERATION INDICATE:- :'' -
SATISFACTORY,FAILED OR SHUT OFFr, `,)
MO .f t
SIGNRTIIRE AND TITLE OF PAF" NG TESTS COMPANY NAME AND '.'
WITNESS(OWNER OR LEASEE OF THE PROPERTY) DATE / TALI
WHITE:CLIENT YELLOW:-OFFICE PINK:INSURANCEAUTHORrTY