HomeMy WebLinkAboutBP 2023-00178 Remodel - Lakeview EMS - SAC Determination Letter Reference: 240422A2 Address ID:742074 Payment ID:477846
2111k
METROPOLITAN Date of Determination:4/22/24 Determination Expiration::4/22/24
0 t t.
Greetings!
Please see the determination below.
Project Name: Lakeview EMS
Project Address: 14702 60th St N
Suite#/Campus: n/a
City Name: Oak Park Heights
Special Notes: The determination is the result of an MCES Community Review, permit#2023-00178, issued 7/10/23. *The
City will be charged no additional SAC Units for this project, as determined below. The rules allow for the 1 net credit,where
SAC was from a Non-Conforming Grandparent Demand,to be left site-specific. This net credit will be available for 5 years from
the date of permit issuance for future growth on this site.
Charge Calculation:
Vehicle Garage: 14,440 sq. ft. @ 4300 sq. ft./SAC= 3.36
Total Charge: 3.36
Credit Calculation:
Lakeview Hospital Covidl8 Testing Site (SAC 12/20)=3.79
Warehouse (Pre2009): 6283 sq.ft. @ 6950 sq. ft./SAC=0.90
Total Credit: 16.9
Net SAC: -1.33* = 0 SAC Due
The business information was provided to MCES by the City at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be
made. If you have any questions, email me at: Jessica.nye@metc.state.mn.us.
Thank you,
(,ems
Manager, SAC Program
Metropolitan Council Environmental Services
390 Robert Street North,Saint Paul, MN 55101-1805 An Equal Opportunity Employer
P 651.602 17701 F 651.602.10301 TTY 651.291.0904
www.met rocou ncil.orq/SACproaram
P
PHASE 1 RENOVATION NOTES HGA
• 1- General note'Provide(PT-1)finish at full perimeter of budding at concrete
block
__.. 1. Not usetl. "
/... 2 elevations
for
addrb/(RWS-Dano Wall)shade extensionscorinrefer to exterior
„..„,,,--4—.--y-,Y Y , elevations br atldiaonal information Wall assembly to continue to
41. r - approximately 2-0'above roof high point as parapet with sheet metal coping to
O / ---- � match(FCC 1).
.. . m f IIuIIYParY¢e
j 3 Install new(AFS 1)at opening.See elevations for additional information.
/ S (DI IIEALTMPNiTt�RS
//�� - �l , 4 Per Alternate A4,install new thermal exterior door,frame and sidelite as
�� w l
applicable See exterior elevations f error do information - W HOSPITAL
c.l /// �/ 4• • 5 Per Alternate A4 install new exterior insulated overhead sectional door. 147V1 60TH STREET
OAK PARK STREET
vi i� / " '///�%"��p pr r ) 6055002
'"� 6 Per Alternate A2,install new(AFS-1)
EMS GARAGE
7. Install new(FCC-Y)/(6W5-1)-refer to exterior elevations for additional RENOVATION
r ,7///..A 1 information. PHASE 1
Install new intenor partitions as indicated Partitions to consist of metal
I / 6
structure
�One 3 tt x 7 a solid-coreR stig Room to receive
with plowing metal framacoustical batt insulation,and 5/8"drywall,both sides,to extend e/ '.:'.• - One Twin XL bed(OFOI) continuously
OI °/. ( gg
X540,16 i
One wall-mounted television,opposite bed(OFCI)
/P..4" .0 ( 9. Install HR rated fire barrier to extend continuously to structure above. Fire
�p ba a to consist of 2-1/7'metal CH stud,two lay 516'drywall on one side,1 =.
S drywall shaft liner on other side.acoustical bait insulationInstall on 3'-0'x 7-0'
// �/ ! ,
hollow tai frame and door panel.Door and h to have a 60 minute fire
�/ /// rating Door hardware to be passage function with panic hardware on Resting
.., A 0 ;. / / �r/I1 mama and closer
_ _'..',..-...•
//
// .,-� c 10. Provide/install new 61reinforced cast-in-place concrete slab for mechanical t
daw 'I Y mor. :a- f o.m.�..« w
t r:43,34.
J/ R4a ,� 71. Provide new fence with painted steel support structure.See elevations and11
•�^`-" ma
t �� -- J.ij SI /f^ Ni 1 !O 1 details
IIIIIMINE
', iii a_ 101 momr
a / j j omaMIMI
.7—z - 1111111
1 4 �� f J 9arm
I el _ ,�1�;, I RENOVATION
lax x _ FLOOR PLAN
® e Q O CP wlsicon trtI-
1 ()P100RPLA MM
-LEVEL 01 aarW
1 `j ED A201