Loading...
HomeMy WebLinkAbout2004-12-27 BRAA Ltr to OPH Re Concept Plan ReviewJA Bonestroo Rosene Anderlil(& Associates En & Architects December 27, 2004 2335 West Hi 36 v St. Paul, MN 55113 Office: 651-636--4600 m Fax: 651-636-1311 wwwbonestroo.coni Mr. Eric Johnson Cit Administrator Cit of Oak Park Hei 14168 Oak Park Blvd., P.O. Box 2007 Oak Park Hei MN 55082-2007 Re: Ackerman Estates Concept Plan Review BRA File No. 55-04-000 Dear Eric: We have reviewed the concept plans for the proposed Ackerman Estates development as submitted, on December 151, 20041 b Folz, Freeman, Erickson, Inc. Followin are our comments and/or recommendations. Plat 1. A 60 foot Ri is recommended at the entrance of the development. MNDOT Issues 1. In MNDOT's 1995 concept for Hi 36 the ali of Oak Avenue passes throu Lot I and Lot 2 in Block 1. In addition it is possible that the northern portion of Lot 3 and Lot 4, Block 1, will be affected b this ali .Grading and Drainage Plan 1. The house on Lot 3, Block I has a low openin elevation (LOE) of 938.5 and a basement floor elevation (BFE) of 935.0. The existin 934 contour is shown at the back of the structure. Is this the correct location for the 934 contour, particularl with the pond's HWL at 933.6? 2. The second cell of the pond (the wetland area) appears to have a NWL of 932.1. This would place the NWL of the pond 13' from the house on Lot 3, Block 1. Do y ou want the pond this close to the house? A wetland delineation is needed. If it is a wetland, the buffer zones must be maintained accordin to the Cit Wetland Ordinance. Is this a protected wetland? Are there an restrictions for raisin the elevation of this wetland? St. Paul, St. Cloud, Rochester, Willmar, MN ■ Milwaukee, Wl ■ Chica IL Affirmative Action/E Opportunit Emplo and Emplo Owned 3. Verify the connection of the proposed 942 contour with the existing contour on Lot 1, Block 1. 4. The pond discharges into a ditch along oakgreen Avenue. Does this water eventually discharge into the MNDOT drainage system? If so, are there any permits that must be obtained from MNDOT for the storm. water? S. This development is in the jurisdiction of the Middle St. Croix Water Management organization. The WMO should review the plans. 1. It is recommended that the water main be installed on the east side of oakgreen Avenue and connect to the existing 12" stub located approximately 300 feet south of Highway 36. 2. A fire hydrant will be required to service the development. 3. Further review is required on the sanitary sewer and water main. To be consistent with the comprehensive plans the City may require that the utilities are located in oakgreen Avenue. Bituminous Trail 1. It is recommended that bituminous radii be placed at the connection to the existing east /west bituminous trail. The plans submitted were concept plans for Ackerman Estates. When preliminary grading and utilities plans are submitted a more detail review will be completed for the development. If you have any questions or require additional information, please contact me at (651) 604 -4788 or Dennis Postler at (651) 604 -4815. Sincerely, BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. Karen S. Erickson, P.E. cc: Tom ozzello, Public works Director Jim Butler, Building official Scott Richards, City Planner Mark Vierling, City Attorney Kathy Widin, City Arborist Todd A. Erickson — Folz, Freeman, Erickson, Inc. DMP, DDH, File -- Bonestroo & Associates K:155�5504 00\Work In ProgresX lohpison_ KSEA A. ckermaryestittesconceptreview .doc