Loading...
HomeMy WebLinkAbout2002-08-05 Engineer Email to Building OfficialKris Danielson To: FILE Subject: FW- Americinn - - - -- Ori Messa -s_ -- From- 'ostler, Dennis M [mailto:dpostler@bonestroo.com] Sent- Monda Au 05, 2002 4:43 PIVI To: Jim Butler (E-mail)- Kris Danielson (E-mail) Cc: Scott Richards (E- ail); Ja Johnson (E-mail'); Kimberl Kamper (E-mail) Jud Holst (E-mail) Mark Berlin g (E-mail) Subject Americinn Jim- As a follow-up to the developer meetin held this afternoon at cit hall, followin is a summar of the en issues remainin An as-built g radin g plan still needs to be submitted accountin for the latest g radin g revisions performed (last week?) b the developer's contractor. This updated as-built should, at a minimum, show the revisions alon the west side of the buildin to reshape the draina swale and the slopes above the retainin wall adjacent to Stillwater Ford. The as-built should also accuratel show the locations and depths of all the utilities installed with this project (storm sewer, sanitar sewer and water main and all appurtenant structures) -- some where missin on the cop the developer had at the meetin toda (dated Au of 2001) Additionall the as-built g radin g plan should show easements for the storm sewer and sanitar sewer crossin the adjacent propert to the east if not on the g radin g plan, these should definitel show up on the final plat). Dennis M. hostler Bonestroo, Rosene, Anderlik & Associates 2335 West Hi 36, St. Paul, MN 55113 Direct: (651) 604-4815 Office- (651) 636-4600, x4815 Fax: (651) 636-1311 Cellular- (612) 865-9187 E-mail: dpostler@bonestroo-com