HomeMy WebLinkAbout2000-02-08 BCWD Preliminary Revewiew Communication f
C
B R OVVN'S C R R
WA RSH D DIS RICT
1825 Curve Crest Blvd. Stillwater MN 55082 l; 651 - 430 -8300 `,X: 651-430-6819
February 8, Zoo
Donald K. Shaffer
I f 1.
l
KS Associates Inc. k
21 Raymond Avenue, Suite 100
St. Paul, NIN 55114
RE: Ameriel .n Motel & Suites Development Proposal
Dear Mr. Shaffer:
The Brown's Creek Watershed District performed a preliminary review of the Amerieffin Motel & Suites
proposed development for conformance to their rules. We understand this development may have received
preliminary approval f rom the City of oak Park Heights and therefore may not be required to comply with the
current Brown's Creek Watershed District Rules. However, we would ask that you comply with the following
for this project.
Provide documentation that this development has received preliminary approval (prior to January 1,
2000 ) from the City of oak 'ark Heights and the conditions of that approval (letter of approval, Council
minutes, etc.)
Implement reasonable measures proposed by the District listed below that increases the lever of
compliance with applicable District rules.
The development does not propose any local quality,, quantity or volume control facility. It appears that the
development is utilizing downstream regional facilities to meet f CWD Stormwater Management Rule
requirements. The City of oak 'ark Heights and the Brown's Creek Watershed District will be discussing this
issue in the future.
We have determined that the erosion control and temporary BMPs shown in the proposed aradinor plan are
enerally appropriate for the development. The implementation .tatio of the following recommendations is
encouraged to increase the level of compliance with applicable isti -.ct rules:
1. Special restoration efforts should be taken to insure the slope above the storm sever line extending to
the pond does not erode. wood Fiber blanket and seed should be placed on all slopes :1 or greater.
2. It is recommended that some method of ever ' dissipation be con tnrcted at S# I to prevent erosion
and h1 h discharcre velocities, such as a drop manhole with a flatter, bi er pipe t the outlet. Special attention
shoul l be paid to the sanitary sewer crossing.
Managers:
Craig Leiser, President Karen Kilberg, vice - President Dan Potter, Secretary E . I Gordon, Treasurer Dan Peterson
r
I
t
Mr. Donald K. Shaffer
February 8, A2000
Page Two
.o foot sump should be constructed in C M -f7. This sump will collect parking lot sand and
minimize pored sedimentation. This sump should be cleaned as often necessary by owner.
4 Some type of catch basin inlet sedimentation protection should be installed and maintained until the site
is stabilized.
5 . The entire site drains to the southeast corner. Some type of overland stabilized drainaae swale should be
constructed from the parking lot corner to the pond. This will transfer flogs in the event of an obstructed
stormsewer.
If you have any questions please feel free to contact me at 1/430 -6826.
since ely,
Mark Do neux, Administrator
cc: Jerry Tumquist, Co ncilmem er, City of al Park Heights
Tom Naha,, Administrator, City of l 'ark Heights
Ceillo Olivier, Emmons Olivier Resources, Inc.
Brown"s Creek Watershed District Board of M na ears