Loading...
HomeMy WebLinkAbout2004-08-14 OPH Ltr. to ApplicantAu 14". 2004 1-oo`' Mr. Rodne Bahr 3363 Oasis Ave Stillwater., MN 55082 ***ALSO VIA FACSIMILIE* * * RE: Home, movin project. There have been some concerns raised b the local communit relative to y our pendin pro Namel the, Cit has received reports of operations occurrin in the middle of ni and that there has been excavation on the where soils were removed and new fill brou back in that ma have been in excess of slab removal. Considerin these items and followin our conversation Frida mornin and evenin the Cit w ill re the followin to be completed. 1 . No excavation, demolition or earthwork of an kind ma be undertaken unless supervised b a licensed environmental specialist. The Cit must first approve such specialist. 2. A licensed environmental specialist shall perform the necessar investi includin takin soil samples, from the 3 area locations as marked upon the site b the Cit Prior to the issuance of a Buildin Permit, a report shall be prepared that provides an anal of an detrimental findin If no such conditions are found the specialist shall provide a report to the Cit that no such conditions were found. 3. A licensed environmental specialist shall perform the necessar investi includin takin appropriate soil samples, from the propert durin and earth movin activities and/or for the excavation of the footin foundations and service utilit laterals. A report shall be prepared that provides an anal of an detrimental findin If no such conditions exist the specialist shall provide a report that no such conditions were found. 4. Should detrimental conditions be found under items 2 and/or 3 above or in other areas, all further work shall cease and the environmental specialist shall immediatel notif the Cit recommend the appropriate a course of action to remediate such detrimental condition and coordinate with the Owner to correct such conditions. No further work or construction of an kind will be permitted unless and until the Cit receives documentation from the environmental specialist that no detrimental conditions were found, or that all such conditions have been appropriatel remediated. 5. The Owner shall post all permits, contact names and project timetables on an appropriate temporar sign. 6. The Owner shall provide the City a $5,000 escrow m via letter of credit or cash deposit that will ensure that all required elements are complied with and that the home movement is completed in a timely fashion. 7e The City recommends that that the Owner holds weekly meetings with neighborhood persons that may have concerns on their project. The Owner shall attempt in good -faith address any and all such reasonable concerts. I realize that these requirements may appear burdensome, but are necessary to ensure that your project succeeds in the long -term and maintains positive relationships with the local community. If these items are tackled in a timely manner your project should not be unnecessarily delayed. I believe that your project upon its completion will certainly be a positive asset to the area. S Yncer Eric A City A Cc: Jim Butler, Building Inspector Mark Vierling, City Attorney City Council Members -IND. MT .JOURNAL- DATE AUG-14-2004 * * ** * TIME 11:00 DATE/TIME .JOURNAL No. COMM . RESULT PAGE C E ) DURATION FILE No. MODE DESTINATION AUG -14 -2004 10:58 el OK 002/002 00:00'50 074 MEMORY TRANSMISSION 4390494 RECEIVED ID -- 6514390484 RESOLUTION = STIR -OAK PARK HEIGHTS CITY f y� r {r +l{Yi 1i�{r fT +rT�fF�f r • 1 • r � r fl�r r f - 65 1 439 05 74