Loading...
HomeMy WebLinkAbout2007-04-24 CC Meeting Packet EnclosureMeeting Date April 24th, 2007 Time Required: Agenda Placement 5 Minutes Agenda Item Title: Valley Senior Services Alliance (VSSA) — General Plan Review / Planned Unit Development for Skilled Care Center Addition. New Busi ► - ss Originating Department/ Requester's Signature Action Requested A i pt Res quest Oak Park Heights Request for Council Action Background /Justification (Plea dicate if any previous action has been taken or if other public bodies have advised): Please See Attached from Scott Richards hnson, City Administrator 1 o Planner's Report -- dated April 4th, 2007 (attachments can be found in the April Planning Commission Packet) 2. Planning Commission Resolution (unsigned) 3. Proposed City Council Resolution 4. Please also see S. Richards' memo dated April 17 2007 discussing Building Heights /Parking Requirements. RE: BACKGROUND NORTHWEST ASSOCIATED CONSULTANTS, INC. 4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 Telephone: 763.23 .2555 Facsimile: 763.231 .2561 planners@nacplanning.com PLANNING REPORT TO: Eric Johnson FROM: Scott Richards DATE: April 4, 2007 FILE NO: 798.02 — 07.01 Oak Park Heights — Valley Senior Services Alliance (VSSA) General Plan Review, Planned Unit Development (PUD) — Care Center VSSA has made application for a general plan approval of the PUD for a 100 bed skilled care addition on the Boutwells Landing campus. The proposed general plan approval is consistent with the concept plan approvals of 2005 that included the following: O care center, 110 bed O Two level parking ramp and parking lot expansions • Historic village including school, band shell, and chapel • City park enhancements, park shelter • Memory care center, 28 unit, relocated adult and child care • Conservatory connection to existing Town Center O Tunnel to business district Concept plan approval, granted by the City Council at their November 22, 2005 meeting, allowed for approval to extend through December 31, 2008. At this time, only the care center will be processed as a general plan. The two level parking ramp has been removed as part of the overall plans and the park shelter in the Autumn Hills park is under construction. The other elements, including the historic village, memory care center, conservatory connection and tunnel will be considered at a later date. In December of 2005, the City Council approved a conditional use permit to move the historic school house into the Boutwells Landing campus. The final plans for the school house and the other buildings of the historic village will need to be reviewed as part of a general plan. Attached for reference: Exhibit 1: Exhibit 2: Exhibit 3: Exhibit 4: Exhibit 5: Exhibit 6: Exhibit 7: Exhibit 8: Exhibit 9: ISSUES ANALYSIS Project Narrative Existing Conditions Removal Plan Certificate of Survey Layout Plan Grading & Erosion Control Plan Utility Plan Lighting Plan Landscape Plan Exhibit 10: Exhibit 11: Exhibit 12: Exhibit 13: Exhibit 14: Exhibit 15: Exhibit 16: Exhibit 17: Exhibit 18: Landscape Details 58 Street Traffic Study Site Plan Lower Level Plan First Floor Plan Second Floor Plan Third Floor Plan Elevations Colored Elevations /Photos Project History /Existing Campus. Ten years ago, Lakeview Hospital recognized a need in the St. Croix Valley for additional older adult housing and services. Three organizations, Presbyterian Homes and Services; Lakeview Hospital; and Croixdale Residence, joined together to form Valley Senior Services Alliance (VSSA), a non - profit organization to meet the needs of older adults in the Valley. The organization envisioned a community that would provide a continuum of care that would meet the needs of older adults as they age in the community where they lived and worked. That vision became Boutwells Landing which now includes: • Fifty-six village homes (side --by -side townhomes), completed in 2000. • Ninety -four assisted living apartments in the Commons building, completed in October 2001 (since July 2004, 29 of these units are dedicated to memory care). • The Gathering at Boutwells Landing, a residential hospice service in the Commons, founded in 2004 in partnership between Lakeview Hospital and Boutwells Landing. • One hundred one units of independent living apartments in the Terrace, completed in February 2002. • A Town Center that links the Commons and the Terrace, and provides convenient services and opportunities for community, both for residents and members of the larger St. Croix Valley community. Features include a town hall /chapel, a general market, cafe, museum, bank, barber /beauty shop, educational classrooms, theater, library, fitness center, two pools, and locker rooms. • A Boutwells bus to transport residents within Boutwells and into town for shopping, medical appointments, and other activities. The bus provides more than 350 rides each month. • Seventy -eight brownstone units (one level independent living homes) six coach homes (detached single family homes), and 75 additional village homes (side-by side homes). 2 VSSA has recognized from the beginning that to provide the continuum of care, a skilled nursing care facility would need to be part of the Boutwells Landing complex. The care center, as now proposed, would be 106 units to be located on the north side of the existing Town Center. The 28 bed memory care center would be part of a future phase. Unit Breakdown. The current submittal reflects slight changes to the numbers of units for each phase of development of the entire complex from the original PUD submittal. The current existing and proposed unit count is as follows: EXISTING 1 PROPOSED HOUSING UNITS Phase 1 (Existing) Independent Living 91 units Alzheimer /Dementia Care 12 units Assisted Living 89 units Duplexes 44 units Quadraplexes 8 units TOTAL 244 units Phase 11 (Existing) Independent Living 78 units Duplexes 81 units TOTAL 159 units Phase 111 (Proposed) Care Center (Current Request) 106 units Assisted /Memory Care 28 units TOTAL 134 units TOTAL PROJECT UNITS 537 units Proposed Project. The 106 unit care center will be connected to the Town Center, the Commons assisted living building, and the Terrace independent living building. The design will be start of the art, including private resident rooms with bathrooms, kitchenettes, and sitting areas. VSSA will be required to locate and purchase existing nursing home beds from areas of the State that have a surplus of beds. The State will need to approve the move of nursing home beds. It is recognized that the St. Croix Valley community has a shortage of this type of housing. The new care center would be Medicare /Medicaid certified, create 150 -170 new jobs, and provide Lakeview Hospital with a specialty unit for physical and occupational therapy and home care. The new facility will provide expanded education facilities to meet the growing needs for residential, staff and community based programs. There is a significant expansion of meeting room capacity for the City. The daycare facilities in the Town Center would be moved to the lower level of the new building. The plans should be revised to include the plans for the outdoor play area. The plans also show the future underground tunnel that will provide access from the lower level under 58 Street to the future parking lots and 3 retail areas adjacent to Highway 36. The tunnel has already been conceptually approved and final approvals would be considered at a later date. The building is three stories and would match the architecture of the existing Town Center, Commons and Terrace buildings. At the highest point, a tower element of the building will be 60 feet. The midpoint of the highest roof gable of the main structure will be at 42 feet. A variance from building height is being requested as part of this process. Zoning. The area has been zoned PUD District. When zoning property as PUD, the City designates an underlying district as the basis for compliance with the ordinance. In that the principal use is a mixture of residential and business use, the appropriate underlying zoning has been designated as R-B, Residential Business Transitional District. Within that district, multiple family dwellings are allowed as a permitted use and nursing homes and similar group housing is allowed as conditional. The Boutwells Landing project will comply with the conditions set forth in Section 401.28.E.3 related to care centers and similar group housing. Subdivision. The final plat for Boutwells Landing has been approved and is filed with Washington County. The main campus area is designated as Lot 1, Block 2. The adjacent park area is designated as Lot 2, Block 2. The Haase Nature Preserve area is designated as Lot 2, Block 3. There are no changes to the property description as a result of this new development. Lot Area. The area of the main campus lot is 694,393 square feet. The Zoning Ordinance requires at least 1 ,000 square feet of lot area per unit of elderly housing. The lot could support 694 units of housing. At complete build out of all phases of the main campus, 404 total units are proposed. Setbacks. The Zoning Ordinance under the R-B District requires 30 foot front and rear yards and 10 foot side yard setbacks. Additionally, one of the conditions for approval of care centers and other similar housing requires a doubling of the setback requirements. As such, the front and rear yard setbacks would be 60 feet and the side yards 20 feet. The care center will be set back approximately 90 feet from the 58 Street right -of -way. A setback of ten feet is required for all parking areas from the right -of -way. All of the proposed parking areas for the care center are at least 20 to 30 feet from adjacent rig hts -of -way. Parking. Currently, 290 standard stalls and 17 accessible stalls have been constructed for the Boutwells Landing main campus. The approved PUD also included an additional 55 stalls that would be held as proof of parking to be constructed with subsequent plans. The Zoning Ordinance includes parking requirements for the category of sanitariums, convalescent home, rest home, nursing home, or day nurseries, for elderly housing and for offices. The parking requirements for each aspect of the project is as follows: 4 Existing Units (Phase 1) Independent Living Elderly Housing — one stall required per unit 91 X 1 = 91 Existing Units (Phase 1) Assisted Living l Alzheimer Five spaces plus one for each three beds 101 ÷ 3 + 5 = 39 Existing Units (Phase 1) Town Center Three spaces plus one space for each 200 square feet 27,923 -- 10% = 25,131 ÷ 3 = 129 Existing Units (Phase 11 Constructed) Independent Living Elderly Housing — one stall required per unit 78 X 1 = 78 Proposed Units (Phase 111 Proposed) Care Center - five spaces plus one for each three beds 106±3 +5 = 40 Total Requirement for All Main Campus 377 The proposed plans include a total of 334 standard stalls, 22 accessible stalls and 14 proof of parking stalls for a total of 370. Although the proposed stalls are slightly less than the requirements, the office space requirement has been applied to the Town Center to establish a parking standard. This requirement is likely higher than what is required for the Town Center element of the complex. There is adequate space on site to require additional stalls, but staff would not support increasing the number of constructed or proof of parking stalls. The overall parking requirements will be reviewed with the final phase which includes the memory care center and adjustments to the parking will be required to meet the overall needs of the complex. The parking deficit can be addressed within the PUD approvals. A parking ramp had been proposed as part of the concept plan review for this portion of the Boutwells Landing campus. With the current unit count and the parking that would be provided on site, it does not appear that the ramp will be necessary. The plans also show the possibility of a tunnel under 58 Street and the addition of parking to the north if the need arises. Access. As part of the parking lot changes, the access drive from 58 Street into the north side of the main campus will be moved approximately 40 feet to the west of the current driveway location. The City Engineer has reviewed the proposed driveway location and does not see a traffic or sight line issue. Traffic. As part of the general plan submittals, the project engineer provided a traffic study indicating the increase in vehicle traffic visibility from the campus expansion. The findings shown by AM peak hour and PM peak hour are as follows: 5 Vehicle Count: AM Peak Hour Existing total peak hour volume from site Estimated future volume to 58 Street from site Estimated increase to 58 Street from site Vehicle Count: PM Peak Hour Existing total peak hour volume from site Estimated future volume to 58 Street from site Estimated increase to 58 Street from site 45 vehicles 68 vehicles 23 vehicles 71 vehicles 119 vehicles 48 vehicles The increase resulting from the expansion does not appear to be substantial. The City Engineer should comment on the traffic study and potential impact to 58th Street and Oakgreen Avenue. Loading Dock /Trash Handling. The loading dock and trash handling area for the campus will not be changed from the current location. The addition of a generator and enclosure adjacent to the loading dock will significantly screen the area. Additionally, the berm area between 58 Street and the loading dock area will be re- landscaped with pine, spruce, and existing trees. The generator enclosure is shown with the building elevation plan. Mechanical Screening. The existing chiller of the heating and air conditioning system will be removed from the parking lot area and incorporated into the new building roof structure. As indicated, the existing generator will be moved and enclosed with a brick structure to match the building. The plans also show three electrical transformers and four propane tanks between the new building and the new generator location. The propane tanks will no longer be needed and will not be placed underground in this location as first proposed. The transformers will be screened by landscaping. Landscaping. A landscape plan has been submitted as part of the application. The plan indicates extensive landscaping along the north edge of the site on the berms adjacent to 58 Street. The parking lot islands and areas in front of the building will also be heavily landscaped. The landscape plans will be subject to review and approval of the City Arborist. As part of the conceptual landscape plan, the area between the main campus building and the pond within the City park is shown to be re- graded and planted in prairie grasses. VSSA representatives have requested to pay for the conversion of these areas into prairie plantings and to establish a more definitive edge between the mowed grass areas and the area that slopes to the pond. VSSA will need to submit a detailed plan and work with the City Engineer on the re-grading and the City Arborist in establishing the prairie grass area. Grading and Drainage. Grading and drainage plans have been submitted for the general plan of development review. As part of the plan, a rainwater garden has been established on a large parking lot island northeast of the new building. The grading and 5 drainage plans shall be subject to review and approval of the City Engineer and Browns Creek Watershed District. Utility Plans. The utility plans shalt be subject to review and approval of the City Engineer. Sidewalks /Trails. The plans indicate the addition of trails and sidewalks as part of the project. A sidewalk connection from the parking lot on the west side of the site will be extended to the existing bituminous trail in the Autumn Hills park. Sidewalks will be constructed in front of the building to assist in providing connections into the entrances from the parking lots. A trail will be constructed on the east side of the campus to connect the 58 Street trail to the existing sidewalk on the south side of the site. Lighting. A lighting plan has been submitted with the locations of fixtures on the building and in the parking lots. The same parking lot fixtures will be utilized that features a lens that does not meet City standards. As part of the PUD, the fixture will be allowed. The photometric plan for the site would meet all City requirements. The plan does not indicate fixture styles for the building mounted lights. Alt building fixtures shall meet City lighting standards and be approved by City staff before installation. Signage. The plans indicate one new site sign to be located at the new entry drive. The sign would match the existing monument sign. The sign would be allowed by the Zoning Ordinance. No wall signage is proposed for the building expansion. Building Design. The Boutwells Landing project would be subject to Design Guidelines requirements in that it is a residential /commercial use within a PUD. The building design and materials are identical to the existing campus building which features a combination of brick, EIFS, large window areas, and metal balcony railings. The building will be capped off with pitched roofs, a tower at the entrance, and a clock tower. A porte cochere will also be provided at the building entrance to provide a covered loading and unloading area for residents and their guests. The construction of the care center will complete the primary view of the campus from 58th Street. This portion of the complex will no longer be the back door, but rather provide an inviting entrance to the campus. The building architecture and materials will be consistent with the City's Design Guidelines. With the construction of the care center, an internal court yard will be created in the center of the campus. Access to the yard for maintenance purposes will be made by a corridor on the east side of the building. A trash room and areas for loading and unloading is provided adjacent to the corridor. Depending upon funding, VSSA plans to completely cover the internal court yard area to make a conservatory in this area. That will be subject to a future general plan review and approval. 7 Building Height. The elevation diagrams indicate the building heights for the buildings and tower elements. The height to the center point of the highest roof is proposed at 42 feet. The building height requirement is 35 feet. A variance is required to exceed the building height of the roof. The tower feature is proposed at a maximum height of 59 feet, 6 inches. The Zoning Ordinance allows exceptions for towers, although they are not permitted to exceed 45 feet in total height or exceed the maximum height of the building by more than five feet. Exceptions to this maximum are made by conditional use permit, The City may consider the tower exception as part of the PUD. A variance was granted for the existing Boutwells Landing buildings. For comparison, the midpoint of the highest roof is at 49 feet, 8 inches on the northeast elevation of the existing building. Variance. Variance criteria is provided in Section 401.04 of the Oak Park Heights Zoning Ordinance. The Planning Commission and city Council should review the following criteria and conditions to determine if the variance is justified. Review Criteria. The Planning Commission and City Council shall make a finding of fact that the proposed action will not: a. impair an adequate supply of light and air to adjacent property. b. Unreasonably increase the congestion in the public street. 0. Have the effect of allowing any district uses prohibited therein, permit a lesser degree of flood protection than the flood protection elevation for the particular area, or permit standards which are lower than those required by State law. d. Increase the danger of fire or endanger the public safety. e. Unreasonably diminish or impair established property values within the neighborhood, or in any way be contrary to the intent of this ordinance. f. Violate the intent and purpose of the Comprehensive Plan. g• Violate any of the terms or conditions of Item 5, below. Conditions for Approval. A variance from the terms of this ordinance shall not be granted unless it can be demonstrated that: a. Undue hardship will result if the variance is denied due to the existence of special conditions and circumstances which are peculiar to the land, structure, or building involved and which are not applicable to other lands, structures or buildings in the same district. 1) Special conditions may include exceptional topographic or water conditions or, in the case of an existing lot or parcel of record, narrowness, shallowness, insufficient area or shape of the property. 8 2) Undue hardship caused by the special conditions and circumstances may not be solely economic in nature, if a reasonable use of the property exists under the terms of this Title. 3) Special conditions and circumstances causing undue hardship shall not be a result of lot size or building location when the lot qualifies as a buildable parcel. b. Literal interpretation of the provisions of this Ordinance would deprive the applicant of rights commonly enjoyed by other properties in the same district under the terms of this Ordinance or deny the applicant the ability to put the property in question to a reasonable use. c. The special conditions and circumstances causing the undue hardship do not result from the actions of the applicant. d. Granting the variance requested will not confer on the applicant any special privilege that is denied by this Ordinance to other lands, structures or buildings in the same district under the same conditions. e. The request is not a result of non-conforming lands, structures or buildings in the same district. f. The request is not a use variance. g. The variance requested is the minimum variance necessary to accomplish the intended purpose of the applicant. h The request does not create an inconvenience to neighboring properties and uses. Comment. in response to the criteria and conditions listed above, the primary hardship to this variance is that three story institutional buildings, with what is required for space needs and construction, cannot fit within a building height requirement of 35 feet. Additionally, the mass of the buildings requires gabled roofs, dormers, and tower elements to break up the facades and make the buildings more visually pleasing. A variance was granted previously for other portions of the campus. The care center will be at a lower height than the existing building. City planning staff recommends that the building height variance be approved. 911 Calls. At City staff request, VSSA was asked to provide information on 911 calls and how the addition of the care center will impact that call volume. The response from VSSA representatives is as follows: 1) In December of 2006, Presbyterian Homes changed the dial "9" program on our telephone system and eliminated this dialing requirement. The goal was to reduce accidental calls made by residents to 911. We tracked 911 calls for the three months prior to the change and subsequent three months after the change. Our 9 data indicates a reduction from 61 to 40 calls, a 34 percent reduction in 911 calls. 2) In relation to our new skilled project application, we have examined our most recent new skilled facility in Bloomington. This is a facility of similar size (700 beds) and our records indicate the facility generates an average of 16 calls per month. We are continuing to analyze data logs from other facilities to confirm this rate. Development Contract. A development contract amendment will be required as part of this PUD approval. The issue of payment in lieu of taxes for the care center will need to be addressed in the contract. The contract shall be subject to review and approval of the City Attorney. CONCLUSION /RECOMMENDATION Based upon the submittals and review herein, City staff recommends approval of the general plan of developmentlPUD and a building height variance for the addition of a care center to the Boutwells Landing campus. The general plan approvals are recommended with the following conditions: 1. The approvals allow for 14 proof of parking spaces and an allowance of a seven parking stall deficit from Zoning Ordinance requirements. 2. The City Engineer shall approve all driveway locations from 58 Street. 3. The City Engineer shall comment on the traffic study and potential impact of the expansion on 58 Street and Oakgreen Avenue. 4. The four propane tanks shall be removed from the site plans and not be installed unless approved by the City. 5. The landscape plan is subject to review and approval of the City Arborist. 6 The site plan shall be revised to include plans for the outdoor play area subject to review and approval of City staff. 7. The applicant shall provide additional plans for the grading and installation of prairie grasses on the east side the Autumn Hills park. The plans shall be subject to review and approval of the City Engineer and City Arborist. 8. The grading and drainage plans shall be subject to review and approval of the City Engineer and Browns Creek Watershed District. 9. The utility plans shall be subject to review and approval of the City Engineer. 10 10. The applicant shall be allowed to install freestanding light fixtures that include a non - conforming lens to match the existing site fixtures on site. A detailed lighting plan for the building light fixtures shall be submitted for City staff approval prior to installation. 11. Alt signage installed on site shall comply with the requirements of the Zoning Ordinance. 12. The Planning Commission and City Council should comment on the building architecture and materials. 13. The Planning Commission recommends and City Council approves a building height variance to the mid point of the highest roof of 42 feet. 14. As part of the PUD approvals, the Planning Commission recommends and the City Council approves the allowance for tower elements that do not exceed 60 feet in height. 15. The city Council should comment on the frequency of 911 calls generated by the Boutwells Landing campus. 16. A snow removal and storage plan shall be submitted by the applicant. 17. The Police Chief and Fire Chief should comment on any safety vehicle access issues of the access points, driveways, or of the general site plan. 18. A development contract amendment shall be executed subject to review and approval of the City Attorney. 11 and A RECOMMENDING RESOLUTION OF THE PLANNING COMMISSION CITY OF OAK PARK HEIGHTS WASHINGTON COUNTY, MINNESOTA A RESOLUTION ESTABLISHING FINDINGS OF FACT AND RECOMMENDING TO THE CITY COUNCIL THAT THE REQUEST BY VALLEY SENIOR SERVICES ALLIANCE FOR A GENERAL PLAN PUD APPROVAL FOR A SKILLED CARE CENTER ADDITION AT BOUTWELLS LANDING LOCATED AT 58 STREET AND NORWICH AVENUE SHOULD BE APPROVED WITH CONDITIONS WHEREAS, the City of Oak Park Heights has received a request from Valley Senior Services Alliance for a general plan PUD approval for a skilled care center addition at Boutwells Landing located at 58 Street and Norwich Avenue; and after having conducted a public hearing relative thereto, the Planning Commission of Oak Park Heights makes the following findings of fact: 1. The real property affected by said application is legally described as SEE ATTACHMENT A and 2. The applicant has submitted an application and supporting documentation to the Community Development Department consisting of the following items: follows, to wit: 3. Concept plan approval for the care center was approved by the City Council at the November 22, 2006 meeting; and 4. The property is zoned PUD District with an underlying zoning of R--B, Residential Business. Care centers are a conditional use in the R -B District; and PUD; and SEE ATTACHMENT B 5. City staff prepared a planning report dated April 4, 2007 reviewing the 6. City staff recommends in the April 4, 2007 planning report that the request be approved with conditions; and 7. The Planning Commission held a public hearing at their April 12, 2007 meeting, took comments from the applicants and public, closed the public hearing, and made the following recommendation: NOW, THEREFORE, BE IT RESOLVED BY THE PLANNING COMMISSION FOR THE CITY OF OAK PARK HEIGHTS THAT THE PLANNING COMMISSION RECOMMENDS THE FOLLOWING: A. The application submitted by Valley Senior Services Alliance for a general plan PUD approval for a skilled care center addition at Boutwells Landing located at 58 Street and Norwich Avenue and affecting the real property as follows: SEE ATTACHMENT A Be and the same as hereby recommended to the City Council of the City of Oak Park Heights for approval with the following conditions: 1. The City Engineer shall approve all driveway locations from 58 Street. 2. The City Engineer shall comment on the traffic study and potential impact of the expansion on 58 Street and Oakgreen Avenue. 3. The four propane tanks shall be removed from the site plans and not be installed unless approved by the City. 4. The landscape plan is subject to review and approval of the City Arborist. 5. The site plan shall be revised to include plans for the outdoor play area subject to review and approval of City staff. 6. The applicant shall provide additional plans for the grading and installation of prairie grasses on the east side the Autumn fills park. The plans shall be subject to review and approval of the City Engineer and City Arborist. 7. The grading and drainage plans shall be subject to review and approval of the City Engineer and Middle St. Croix Watershed District. 8. The utility plans shall be subject to review and approval of the City Engineer. 9. All newly installed freestanding light fixtures shall include a conforming full cut off lens. A detailed lighting plan for the building light fixtures shall be submitted for City staff approval prior to installation. All new light fixtures shall comply with the requirements of the Zoning Ordinance. 10. All signage installed on site shall comply with the requirements of the Zoning Ordinance. A plan, subject to approval by City staff, shall be submitted by the applicant indicating appropriate directional signage. 2 11. The Planning Commission is favorable to the proposed building architecture and materials. 12. The Planning Commission recommends and City Council approves a building height variance to the mid point of the highest roof of 42 feet. 13. As part of the PUD approvals, the Planning Commission recommends and the City Council approves a conditional use permit allowance for tower elements to not exceed 60 feet in height. 14. The City reserves the right to address the issue of 911 calls and potential emergency vehicle siting on campus at a later date. 15. A snow removal and storage plan shall be submitted by the applicant. 16. The Police Chief and Fire Chief should comment on any safety vehicle access issues of the access points, driveways, or of the general site plan. 17. A development contract amendment shall be executed subject to review and approval of the City Attorney. The issue of payment in lieu of taxes will be addressed as part of the contract. Recommended b y the Planning Commission of the City of Oak Park Heights this 12 day of April 2007. ATTEST: Eric A. Johnson, City Administrator Michael Liljegren, Chair 3 Attachment A Washington County GEO Code: 05.029.20.13.0009 Legal Description: Lot 1, Block 2, Boutwell's Landing Physical Address: 13 575 58 St. N. Required Approvals: Planning Commission City Council Variance — Lapse of Approval: ATTACHMENT B Planned Unit Development (PUP): Amended Concept & General Plan Approvals And Building Height Variance For Boutwell's Landing Care Center Expansion Located at 13575 58 St. N. Application Materials • Application Form • Fees • Plan Sets (3 Large Scale Sets /20 11X17 Sets) • Written Narrative and Graphic Materials Explaining Proposal • Mailing List from Washington County (500' from subject property) • Proof of Ownership or Authorization to Proceed • Property Tax Statement(s)/Legal Description(s) Conference With City Staff Upon Application Submittal: February 21, 2007 Public Hearing: April 12, 2007 Majority Vote Majority Vote PUD: General Concept - Limitation on General Concept Plan Approval: Unless a General Plan of Development covering the area designated as in the General Concept Plan as the first stage of the PUD has been filed within twelve (12) months from the date Council grants General Concept Plan approval, or in any case where the applicant fails to file General Plan of Development Stage and Final Plans and to proceed with development in accordance with the provisions of this Ordinance and of an approved General Concept Plan, the approval may be revoked by Council action. (401.06.C.2.e) Unless the City Council specifically approves a different time when action is officially taken on the request, the variance shall become null and void twelve (12) months after the date of approval, unless the property owner or applicant has substantially started the construction of any building structure, addition or alteration, or use requested as part of this variance. The property owner shall have the right to submit an application to extend the approval of a variance to the Zoning Administrator not less than thirty (30) days before the expiration of said approval. (401.4.0 .1 — 401.4.C.2) A RESOLUTION ESTABLISHING FINDINGS OF FACT AND RESOLUTION OF THE CITY COUNCIL THAT THE REQUEST BY VALLEY SENIOR SERVICES ALLIANCE FOR A GENERAL PLAN PUD APPROVAL FOR A SKILLED CARE CENTER ADDITION AT BOUTWELLS LANDING LOCATED AT 58 STREET AND NORWICH AVENUE BE APPROVED WITH CONDITIONS WHEREAS, the City of 'Oak Park Heights has received a request from Valley Senior Services Alliance for a general plan PUD approval for a skilled care center addition at Boutwells Landing located at 58 Street and Norwich Avenue; and after having conducted a public hearing relative thereto, the Planning Commission of Oak Park Heights recommended that the application be approved with conditions. The City Council of Oak Park Heights makes the following findings of fact and resolution: 1. The real property affected by said application is legally described as SEE ATTACHMENT A 2. The applicant has submitted an application and supporting documentation to the Community Development Department consisting of the following items: follows, to wit: and and 3. Concept plan approval for the care center was approved by the City Council at the November 22, 2006 meeting; and 4. The property is zoned PUD District with an underlying zoning of R -B, Residential Business. Care centers are a conditional use in the R -B District; and PUD; and RESOLUTION NO, CITY COUNCIL CITY OF OAK PARK HEIGHTS WASHINGTON COUNTY, MINNESOTA SEE ATTACHMENT B 5. City staff prepared a planning report dated April 4, 2007 reviewing the 6. City staff recommends in the April 4, 2007 planning report that the request be approved with conditions; and 7. The Planning Commission held a public hearing at their April 12, 2007 meeting, took comments from the applicants and public, closed the public hearing, and recommended that the application be approved with conditions. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL FOR THE CITY OF OAK PARK HEIGHTS THAT THE CITY COUNCIL APPROVES THE FOLLOWING: A. The application submitted by Valley Senior Services Alliance for a general plan PUD approval for a skilled care center addition at Boutwells Landing located at 58 Street and Norwich Avenue and affecting the real property as follows: SEE ATTACHMENT A Be and the same as hereby approved by the City Council of the City of Oak Park Heights with the following conditions: 1. The City Engineer shall approve all driveway locations from 58 Street. 2. The City Engineer shall comment on the traffic study and potential impact of the expansion on 58 Street and Oakgreen Avenue. 3. The four propane tanks shall be removed from the site plans and not be installed unless approved by the City. 4. The landscape plan is subject to review and approval of the City Arborist. 5. The site plan shall be revised to include plans for the outdoor play area subject to review and approval of City staff. 6. The applicant shall provide additional plans for the grading and installation of prairie grasses on the east side the Autumn Hills park. The plans shall be subject to review and approval of the City Engineer and City Arborist. 7. The grading and drainage plans shall be subject to review and approval of the City Engineer and Middle St. Croix Watershed District. 8. The utility plans shall be subject to review and approval of the City Engineer. 9. All newly installed freestanding light fixtures shall include a conforming full cut off lens. A detailed lighting plan for the building light fixtures shall be submitted for City staff approval prior to installation. All new light fixtures shall comply with the requirements of the Zoning Ordinance. 10. All signage installed on site shall comply with the requirements of the Zoning Ordinance. A plan, subject to approval by City staff, shall be submitted by the applicant indicating appropriate directional signage. 2 11. The City Council is favorable to the proposed building architecture and materials. 12. The Planning Commission recommends and City Council approves a building height variance to the mid point of the highest roof of 42 feet. 13. As part of the PUD approvals, the Planning Commission recommends and the City Council approves a conditional use permit allowance for tower elements to not exceed 60 feet in height. 14. The City reserves the right to address the issue of 911 calls and potential emergency vehicle siting on campus at a later date. 15. A snow removal and storage plan shall be submitted by the applicant. 16. The Police Chief and Fire Chief should comment on any safety vehicle access issues of the access points, driveways, or of the general site plan. 17. A development contract amendment shall be executed subject to review and approval of the City Attorney. The issue of payment in lieu of taxes will be addressed as part of the contract. 2007. ATTEST: Approved by the City Council of the City of Oak Park Heights this 24th day of April Eric A. Johnson, City Administrator David Beaudet, Mayor 3 Attachment A Washington County GEO Code: 05.029.20.13.0009 Legal Description: Lot 1, Block 2, Boutwell's Landing Physical Address: 13 575 58 St. N. Application Materials • Application Form • Fees • Plan Sets (3 Large Scale Sets /20 1 1 X 17 Sets) • Written Narrative and Graphic Materials Explaining Proposal • Mailing List from Washington County (500' from subject property) • Proof of Ownership or Authorization to Proceed • Property Tax Statement(s)/Legal Description(s) Conference With City Staff Upon Application Submittal: February 21, 2007 Public Hearing: April 12, 2007 Required Approvals: Planning Commission City Council ATTACHMENT B Planned Unit Development (PUD): Amended Concept & General Plan Approvals And Building Height Variance For Boutwell's Landing Care Center Expansion Located at 13575 58 St. N. Majority Vote Majority Vote PUD: General Concept - Limitation on General Concept Plan Approval: Unless a General Plan of Development covering the area designated as in the General Concept Plan as the first stage of the PUD has been filed within twelve (12) months from the date Council grants General Concept Plan approval, or in any case where the applicant fails to file General Plan of Development Stage and Final Plans and to proceed with development in accordance with the provisions of this Ordinance and of an approved General Concept Plan, the approval may be revoked by Council action. (401.06.C.2.e) Variance — Lapse of Approval: Unless the City Council specifically approves a different time when action is officially taken on the request, the variance shall become null and void twelve (12) months after the date of approval, unless the property owner or applicant has substantially started the construction of any building structure, addition or alteration, or use requested as part of this variance. The property owner shall have the right to submit an application to extend the approval of a variance to the Zoning Administrator not less than thirty (30) days before the expiration of said approval. (401.4.0 .1 — 401.4.C.2) NORTHWEST ASSOCIATED ON ULTANT , INC. MEMORANDUM TO: FROM: DATE: 4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 Telephone: 763.231 .2555 Facsimile: 763.23 1 .2561 planners@nacplanning.com Eric Johnson Scott Richards April 17, 2007 RE: Oak Park Heights — Valley Senior Services Alliance (VSSA) General Plan Review — PUD — Boutwells Landing Care Center FILE NO: 798.02 — 07.01 At the April 12, 2007 Planning Commission meeting, Boutwells Landing representatives and City staff clarified two issues related to parking and building height as an update to the April 4, 2007 planning report. A table in the planning report identified a requirement for 377 parking stalls for the main campus of Boutwells Landing. The table incorrectly identified 78 units of independent living as part of the main campus. These units are the Brownstones and are not part of the main campus. They are constructed with their own parking. The actual parking requirement for the main campus is 299 stalls. The proposed plans include a total of 334 standard stalls, 22 accessible stalls, and 14 proof -of- parking stalls. The development is well within its overall parking requirements. The Planning Commission eliminated a condition related to the parking deficit. A second point of clarification is related to building height and how the new building will relate to the existing structure. The building heights of the existing /proposed structures are as follows: 2 Existing Structures: Independent Living Assisted Living Center Tower Structure Two Side Towers Proposed Structures: Main Tower Structure Care Center To Midpoint of Gable 49 feet, 8 inches 1 49 feet, 8 inches 1 42 feet 1 To Peak 55 feet 55 feet 50 feet 2 58 feet 2 59 feet, 6 inches 2 50 feet Defined building height in Oak Park Heights Zoning Ordinance/Uniform Building Code for gabled roofs. Building height requirement for tower structures per Zoning Ordinance. As indicated above, the care center will be comparable in height to the existing campus building. The building requirement for gabled roofs is 35 feet to the midpoint of the highest gable, and for towers it is 45 feet to the peak. A variance is required for the gabled roof elements and a conditional use permit is required for the towers. 2