Loading...
HomeMy WebLinkAbout2007-10-22 Brown's Creek WD Ltr. to Applicantr-OM: Wdsbin Conservation 6512751254 10/22/2007 11:20 #326 P.001/002 138 FILONTAG RD B RO W N -S H i 0 G W i-i WA E 3.6 S T I L LWA..T E R-, C RE .. WA E R S H E D 65I.275.1136 X26 [PHONEI D I S RI CT 651.275.1254 FAx VVWW- B CW D. 0 RG October 22, 2007 Robert Br-acke 80 East Arlin Avenue St. Faul, MN 55117 Re.* In complete Permit Submittal I Best Bu Oak -Park Hei MN De'ar Mr. Bracke MAILED & FAXED: 651489-1405 ij eo<` The Brown's Creek Watershed District (BCwD) received a permit application on October 15, 2007, for the Best Bu project in Oak Park Hei MN. After a review of permit submittal completeness per the BCW► Rules effective Ma L 2007, y o ur U 13lication for the above proj has been determined to be incomplete. The followin items will be re for a complete submittal: 0 Topio showin all on and off subwatersheds contributin to surface flows onto or from the site for existin and proposed conditions. (BCVYD Rule 2.6.2) - The proposed conamons model does not include all of the contributing area that is part of the pre- development conditions modeL Stormwatcr runoff rate anal for the two, 10, and 1 00 . critical events and runoff volume for,the two- event (or five- event for a landlocked basin) under pre-settlem and proposed conditions, usin Appendix 2.4 to simul infiltration losses in desi practices,, (BCWD Rule 2.6.9) - Model should use C soils for disturbed areas under propos conditions unless a soil amendment plan to restore compacted sods is submitted and approved (see Rule 2.5.3). o All h water q ualit y ,. and h computations completed to desi the proposed faciliti includin a demonstration of conformance, in the site a to phosphorus treatment efficienc re rements of Appendix 2.2. (BCwD Rule 2.6. 10) - The pond ad to the proposed pro was modeled in the District's Lon Lake Mana Plan P8 model and was found to be 36% efficientfor TP capture. The estimated re efficienc a commercial site on B soils is 84% (see Appendix 2.2 of the Rules) so the existin does not provide the full level oftr�alment needed. As specified in Rule 2.4. 1 ( c), the site cannot, increase the annual phosphorus load as c to pre-developme conditions.. M"AGERS; CRAIG LEISER, PRESI RICK VANZWO L, VICE-PPLES I DENT CONMETAILLON,TRIASUPLER • GERALD JOHNSON, SECRETARY- e GAIL PUNDSACK, MANAGER. From:Wasbington Conservation 6512751254 10/22/2007 11 :21 #326 P.002/002 Construction pl ans, specifications and a maintenance schedule for all proposed facilities. (BCWD Rule 2.6.8) w o Pretreatment Facility details and specifications (BCVVD Rule 2.6.8) - . Need pretreatment of runoff to infiltration feature o Infiltration Feature details and specifications. (BLVD Rule 2.6.5) - . Need plan view size of inf itration feature o Storm Water Pollution Prevention Plan (BCWD Rule 2.6.13), a Erosion and Sediment Control Plan including schedule for site restoration. (BCVVD Rule 3,2,1) Site Plan and supporting calculations indicating ,location and volume of floodplain impact.and mitigation. (BCVID Rule 7.3 . I) - Quantifyfill and mitigation proposed` helo the 1 00 wear HWL of the adjacent pond. Site Plan indicating lowest Boor elevations of all proposed structures. (BCWD Rule 7.3.2) Plan shows FFE, not LFE Additional alterations to site plan and submitted modeling may be necessary, following receipt of a complete submittal. Please feel free to contact me at 651 -275 -1136 ext 26 with any questions. Sincerely, Karen Kill BCVVD Administrator Cc: Board of Managers Curtis'Neft„ Westwood Professional Services, 7699 Anagram Dr, Eden Prairie, MN 55344- FAX: 952 - 337 -5822 Lisa T11man, FOR FAX: 651 -770 -2552 Erie Johnson, City of oak Park Heights FAX: 651 -439 -0574