HomeMy WebLinkAbout2002-09-05 NAC Planning ReportPLANNING REPORT TO: Kimberly Kamper FROM: Scott Richards DATE: September 5, 2002 RE: FILE NO: 798.02 — 02.23 BACKGROUND DDD LLC is proposing an amendment to their conditional use permit/planned unit development to allow for building site plan changes to allow construction of Building 2 of the project. The project, as approved in 2001, allowed the development to be constructed in two phases. The applicants have proposed minor site and building changes to include a slightly larger building to allow for trash storage. The parking lot would be redesigned to better accommodate access to the loading doors of the second building. The applicants are interested in moving forward with construction of Building 2 this Fall. The first building is in place and is currently fully leased. Attached for reference: Exhibit 1: Exhibit 2: Exhibit 3: Exhibit 4: Exhibit 5: Exhibit 6: Exhibit 7: Exhibit 8: NORTHWEST ASSOCIATED CONSULTANTS, INC. 5775 Wayzata Boulevard, Suite 655, St. Louis Park, MN 55416 Telephone: 952.596.9636 Facsimile: 962.695.9837 planners(amacplanning.corn Oak Park Heights — DDD LLC Office/Warehouse Building Conditional Use Permit/Planned Unit Development Amendment And Site Plan Review Site Plan Approved Site Plan Grading, Drainage, and Utility Plan Building 2 Floor Plan Building Elevations Landscape Plan Lighting Plan Project Narrative ENCLOSURE 2 ISSUES ANALYSIS Project Request. The applicants have determined that it is not feasible to add onto the existing trash enclosure located on the north side of the parking lot or construct a new enclosure on the property. The proposed site plan indicates incorporation of the trash handling area in Building 2. The trash area has been added onto Building 2 at the inner corner facing west. That addition will add approximately 572 square feet to the building footprint. The trash enclosure for Building 2 had been planned on the south side of the building near the driveway entrance of 55 Street North. The applicants have indicated that location does not work from a practical or aesthetic point of view. The second aspect of this review is that the applicants are requesting to remove the eight parking stalls on the easterly side of the center parking island. This has been requested to allow for better access into the doors of Building 2. Parking. Building 1 requires 32 parking spaces. Building 2, with the larger footprint, would require 29 parking spaces for a total of 61 for the site. The site plan indicates a total of 76 parking spaces. If the eight stalls were removed as requested, the site would have a seven stall surplus for parking. Building Design. Elevations of the second building have been submitted incorporating the building addition. The building will be identical in appearance to Building 1 in terms of design and materials. Grading, Drainage, and Utility Plans. The proposed building addition does not increase the overall hard cover of the site. The submitted grading, drainage and utility plans are subject to review and approval of the City Engineer. Lighting. Lighting plans have been submitted. The fixtures will be identical to those installed on Building 1 and are compliant with the Zoning Ordinance. The lighting plan should be revised to assure that the maximum light at the property line is .4 foot candles. The light fixtures installed on the northeast building side may not be necessary and the applicant should consider whether they could be removed. Landscaping. The submitted landscape plan is subject to review and approval of the City Arborist. RECOMMENDATION 1 CONCLUSION Based upon the preceding review, it is recommended that the conditional use permit /planned unit development and site plan review for Building 2 of the DDD LLC project in the Kern Center should be approved with the following conditions: 2 1. The site plan has been revised to allow for a 572 square foot addition to Building 2 to allow for trash storage. e The parking lot site plan has been revised to eliminate eight parking stalls within the center parking island. 3. The grading, drainage and utility plans are subject to review and approval of the City Engineer. The lighting plans should be revised to comply with the lighting standards of the Zoning Ordinance or the fixtures are removed from the northeast side of Building 2. 5. The landscape plan is subject to review and approval of the City Arborist. pc: Kris Danielson 3 Q z IMO p L) J ai d t 5. 7 0. M 4- sc 4 ', I lii = ,, 4, g J 5 .3 11 i c. , 3 ; , , L I .! 1 1 ,. I I I q 1 1 5 d ,j_ I . .,„ 5 .- p j 11 § 011.1 S3 E§ 1! Aiiii6tifigyll 1111 ii. i ' zil; Mi hid- 4 1) I iiilighili14 1 - tl 1 /1-; i lgtii1111 l anisill In/ _ a. 4 4 4,rf rf 4 z# Sufinne •71 ciaci • JOJ Suppo pasodwd 1 ! elosauum ` leO 0 .r ---- L_J L_J z z . --- • t020,1 rrirgl g et 8 z 1— ifs g CIO ZAY03 LY - Z - DTI B11,71,4 2 Ln c c r1:1 LO C) CT3 CO r-- • rn 111 .") L.7 LLI OZ. 1.1.1 • ›- 111 c -.;1 Li CZ) u LJ •. CM LL-1 cL LJ 11.1 td 1.1.1 1 o w 1.11 C\A ln rn 1 7 P7 cn • • Lri /7- N I EXHIBIT 2 6 0 0 z z t,r`l V, 3 J 6 q!( 1 I \ \ I I '' 0,51% 47' 4 1 I 1 i 1 p 1 1 0 1 3 i 1 T T I . - E_ _ _I 0 ° . —4 , E 1 21 E R10 A1/4114 I -, -_,_,-_,..,,- -7 -s 7- r -- i - I ', -- 1 - f -- 1 --- 1 --- 1- f, 1 1 1 , I I 1 1 I 1 I I 1 , 4 -----a --- v - -----___ 4 0 > . 1 (f) 0 z 0 (7) LIJ 0 5%f .tn 1 1 1-LH I E :01 A iH FRI 55555 5 w o Lj 1111 F, • 1 ' elosouuM 1 $114SPH lied Igo z# DNICI1109 'Dill 000 Sullavne pasodom A •••■■01.10=1, 5,07Y-Z-o-n-coado-n-ocio r tl 1 1 1 1 1 1 1 1 5 e 's;oaH )laed muo Z# DNIO11ns 'D'A'M ❑00 Su!pp!ns pasodoid v.� k 4D gp ii x m •7 4 I r � r did 11 I 1 - 1 FI If 1 11 11 1'1 11' 4D d 6 E 8 me iS X • ,rhtQ'bE' -2 -yr, - ,oa\x.fo71 -CCR z J 0. ME MI III ilIMEMNIES IMMIONMEall • 9 S Dal -' il/+YHf i# FIMMINFaiNal 111.1+4f+1MNff �• 71�'. C� 9 4Wy (� rra;wcar� Y9rwrzfo nevi 0 dr7�ds 0,07-+KT7.9 11 1111 • MN= - z J 0. elosauqw 'sly2pH leO z# 2 u!PlIng 0•1 aaa Joj Supung pasodoid I 1 8 2 V t4 ti 8 Z Z 511 .7a r ENO 1— 1 x w ZOOTI-000 ua, August 23, 2002 City of Oak Park Heights Po o Box 2007 Oak Park Heights, MN 55082 RE: DDD, LLC Site Plan Revision Sincerely, DDD, LLC Officers: Stephen A. Continenza Charles A. Siedow Robert L. White Philip C. Ohs To Whom It May Concern: sons as to wh we need to relocate the trash enclosure at our The following is a list of rea � construction site located at Highway 5 and 55th Street. • it will h • be difficult - for the trash hauler to access the dumpster on the north end of the building. ° what we'd in plain view upon which is not it would be on entering the parking lot, wh p p like eople to see upon entering the lot. p + It would be visible from Highway 5 and 55th Street. n losure will not work due to Xce • Adding on to the existing trash. e l Energy utility enclosure lines that run through that area. Moving these lines would be a major expense. � ure should be relocated to would not be seen from The location we feel the trash enclosure . hie well with the building which would make it almost unnoticeable 5 and blends �n w � d allows would clean u the northeast corner of the building an from. 5 5th Street. It also woe p very good access for the trash hauler. Your prompt review of this revision would be very much appreciated! EXHIBIT 8 . *0144.