HomeMy WebLinkAbout2002-09-05 NAC Planning ReportPLANNING REPORT
TO: Kimberly Kamper
FROM: Scott Richards
DATE: September 5, 2002
RE:
FILE NO: 798.02 — 02.23
BACKGROUND
DDD LLC is proposing an amendment to their conditional use permit/planned unit
development to allow for building site plan changes to allow construction of Building 2 of
the project. The project, as approved in 2001, allowed the development to be
constructed in two phases. The applicants have proposed minor site and building
changes to include a slightly larger building to allow for trash storage. The parking lot
would be redesigned to better accommodate access to the loading doors of the second
building.
The applicants are interested in moving forward with construction of Building 2 this Fall.
The first building is in place and is currently fully leased.
Attached for reference:
Exhibit 1:
Exhibit 2:
Exhibit 3:
Exhibit 4:
Exhibit 5:
Exhibit 6:
Exhibit 7:
Exhibit 8:
NORTHWEST ASSOCIATED CONSULTANTS, INC.
5775 Wayzata Boulevard, Suite 655, St. Louis Park, MN 55416
Telephone: 952.596.9636 Facsimile: 962.695.9837 planners(amacplanning.corn
Oak Park Heights — DDD LLC Office/Warehouse Building
Conditional Use Permit/Planned Unit Development Amendment
And Site Plan Review
Site Plan
Approved Site Plan
Grading, Drainage, and Utility Plan
Building 2 Floor Plan
Building Elevations
Landscape Plan
Lighting Plan
Project Narrative
ENCLOSURE 2
ISSUES ANALYSIS
Project Request. The applicants have determined that it is not feasible to add onto
the existing trash enclosure located on the north side of the parking lot or construct a
new enclosure on the property. The proposed site plan indicates incorporation of the
trash handling area in Building 2. The trash area has been added onto Building 2 at the
inner corner facing west. That addition will add approximately 572 square feet to the
building footprint.
The trash enclosure for Building 2 had been planned on the south side of the building
near the driveway entrance of 55 Street North. The applicants have indicated that
location does not work from a practical or aesthetic point of view.
The second aspect of this review is that the applicants are requesting to remove the
eight parking stalls on the easterly side of the center parking island. This has been
requested to allow for better access into the doors of Building 2.
Parking. Building 1 requires 32 parking spaces. Building 2, with the larger footprint,
would require 29 parking spaces for a total of 61 for the site. The site plan indicates a
total of 76 parking spaces. If the eight stalls were removed as requested, the site would
have a seven stall surplus for parking.
Building Design. Elevations of the second building have been submitted
incorporating the building addition. The building will be identical in appearance to
Building 1 in terms of design and materials.
Grading, Drainage, and Utility Plans. The proposed building addition does not
increase the overall hard cover of the site. The submitted grading, drainage and utility
plans are subject to review and approval of the City Engineer.
Lighting. Lighting plans have been submitted. The fixtures will be identical to those
installed on Building 1 and are compliant with the Zoning Ordinance. The lighting plan
should be revised to assure that the maximum light at the property line is .4 foot
candles. The light fixtures installed on the northeast building side may not be necessary
and the applicant should consider whether they could be removed.
Landscaping. The submitted landscape plan is subject to review and approval of the
City Arborist.
RECOMMENDATION 1 CONCLUSION
Based upon the preceding review, it is recommended that the conditional use
permit /planned unit development and site plan review for Building 2 of the DDD LLC
project in the Kern Center should be approved with the following conditions:
2
1. The site plan has been revised to allow for a 572 square foot addition to Building
2 to allow for trash storage.
e The parking lot site plan has been revised to eliminate eight parking stalls within
the center parking island.
3. The grading, drainage and utility plans are subject to review and approval of the
City Engineer.
The lighting plans should be revised to comply with the lighting standards of the
Zoning Ordinance or the fixtures are removed from the northeast side of Building
2.
5. The landscape plan is subject to review and approval of the City Arborist.
pc: Kris Danielson
3
Q
z
IMO
p
L)
J
ai d
t
5.
7 0.
M 4-
sc 4 ', I lii =
,, 4, g J 5 .3 11 i c. , 3 ; ,
, L I .!
1 1 ,.
I I I q 1 1 5 d ,j_ I
. .,„ 5 .- p
j
11 § 011.1 S3 E§ 1! Aiiii6tifigyll 1111 ii. i '
zil; Mi hid- 4 1) I iiilighili14 1 - tl 1 /1-;
i lgtii1111 l anisill In/
_ a.
4 4 4,rf rf 4
z# Sufinne •71 ciaci
• JOJ Suppo pasodwd
1 !
elosauum ` leO
0
.r
----
L_J L_J
z
z
. --- •
t020,1 rrirgl
g
et 8
z
1—
ifs
g
CIO
ZAY03 LY - Z - DTI
B11,71,4
2
Ln c c
r1:1 LO
C) CT3
CO r--
• rn
111
.") L.7
LLI
OZ. 1.1.1
• ›- 111
c -.;1
Li CZ)
u LJ
•. CM LL-1
cL
LJ
11.1
td
1.1.1
1 o w
1.11
C\A
ln
rn
1
7
P7
cn
• •
Lri
/7-
N
I
EXHIBIT 2
6
0
0
z
z
t,r`l
V,
3
J
6 q!(
1 I \
\
I I ''
0,51%
47'
4 1 I 1 i
1 p 1 1 0
1 3 i 1
T T
I . - E_ _ _I
0
° .
—4 ,
E 1 21 E R10 A1/4114
I -, -_,_,-_,..,,-
-7 -s
7- r
-- i - I ', -- 1 - f -- 1 --- 1 --- 1- f,
1 1 1 , I I 1 1 I 1 I I
1 , 4
-----a
--- v - -----___ 4 0 >
.
1
(f)
0
z
0
(7)
LIJ
0
5%f
.tn
1
1
1-LH
I E
:01 A
iH
FRI
55555 5
w o
Lj 1111
F,
•
1 ' elosouuM 1 $114SPH lied Igo
z# DNICI1109 'Dill 000
Sullavne pasodom
A
•••■■01.10=1,
5,07Y-Z-o-n-coado-n-ocio
r tl
1
1
1
1
1
1
1
1
5
e 's;oaH )laed muo
Z# DNIO11ns 'D'A'M ❑00
Su!pp!ns pasodoid
v.� k
4D
gp
ii
x
m
•7
4 I
r � r
did
11
I 1
- 1
FI
If
1
11
11
1'1
11'
4D
d
6
E
8 me
iS
X
•
,rhtQ'bE' -2 -yr, - ,oa\x.fo71 -CCR
z
J
0.
ME
MI
III
ilIMEMNIES
IMMIONMEall
•
9 S Dal -' il/+YHf i#
FIMMINFaiNal
111.1+4f+1MNff �• 71�'. C�
9 4Wy (� rra;wcar�
Y9rwrzfo nevi 0
dr7�ds
0,07-+KT7.9
11
1111
•
MN=
-
z
J
0.
elosauqw 'sly2pH leO
z# 2 u!PlIng 0•1 aaa
Joj Supung pasodoid
I
1
8
2
V
t4
ti 8
Z Z
511
.7a
r
ENO
1—
1
x
w
ZOOTI-000 ua,
August 23, 2002
City of Oak Park Heights
Po o Box 2007
Oak Park Heights, MN 55082
RE: DDD, LLC Site Plan Revision
Sincerely,
DDD, LLC Officers:
Stephen A. Continenza
Charles A. Siedow
Robert L. White
Philip C. Ohs
To Whom It May Concern:
sons as to wh we need to relocate the trash enclosure at our
The following is a list of rea �
construction site located at Highway 5 and 55th Street.
• it will h
• be difficult - for the trash hauler to access the dumpster on the north end of
the building. ° what we'd
in plain view upon which is not
it would be on entering the parking lot, wh
p p
like eople to see upon entering the lot.
p
+ It would be visible from Highway 5 and 55th Street.
n losure will not work due to Xce
• Adding on to the existing trash. e l Energy utility enclosure
lines that run through that area. Moving these lines would be a major expense.
�
ure should be relocated to would not be seen from
The location we feel the trash enclosure . hie
well with the building which would make it almost unnoticeable 5 and blends �n w � d allows
would clean u the northeast corner of the building an
from. 5 5th Street. It also woe p
very good access for the trash hauler.
Your prompt review of this revision would be very much appreciated!