Loading...
HomeMy WebLinkAbout2004-04-27 CC Meeting Packet EnclosureOak Park Heights Request for Council Action Meeting Date: April 27, 2004 Agenda Item Title: River Valley Rentals - PUD Concept Plan (East Oaks 2 Addition) Time Required: 10 minutes Agenda Placement: New Business Originating Department/ u stor: 1 Johnson Cs Administrator ir Requester's Signature Action Requested: C. sider and .Apo r ve r it Background/Justification (Please i.• • icate any previous action, financial implications including budget information and recommendations). ENCLOSURE 1 See attached Planner's Report from Scott Richards and Council Resolution. Please bring your Planning packet material on this item to the Council Meeting NORTHWEST ASSOCIATED CONSULTANTS, INC. 5775 Wayzata Boulevard, Suite 555, St. Louis Park, MN 55416 Telephone: 9 52.595.9636 Facsimile: 952.595.9337 planners@nacplanning.com PLANNING REPORT TO: Eric Johnson FROM: Bob Kirmis 1 Scott Richards DATE: April 1, 2004 RE: Oak Park Heights W East Oaks PUD 2nd Addition: PUD Concept Plan FILE NO: 798.02 -- 04.04 BACKGROUND River Valley Rentals, LLC is requesting approval of a mixed use, Planned Unit Development (PUD) Concept Plan for a development entitled East Oaks PUD 2 Addition. The development includes a 32 unit residential condominium building, a 2,065 square foot office building and a 4,658 square foot office building. The site area is located east of Osgood Avenue and south of Highway 36. This request was continued from the March 1 1 , 2004 Planning Commission meeting at which a number of outstanding were identified primarily in regard to setbacks, residential density and building height. Thus, revised plan submission attempts to address previously cited concerns. Attached for reference: Exhibit 1: Exhibit 2: Exhibit 3: Exhibit 4: Exhibit 5: ISSUES ANALYSIS Previous Site Plan Revised Site Plan Grading and Drainage Plan Condominium Building Elevations Office Building Elevations Comprehensive Plan. The Comprehensive Plan designates the entire project area as commercial land use. Should this project move forward, the Comprehensive Plan and use map should be amended to address the residential land use if this project. Zoning. The northern portion of the subject property is zoned B -2 General Business while the southern portion is zoned R -B Residential /Business Transitional. Within such districts, a PUD is listed as a conditional use. The use of the PUD allows multiple buildings on one property with shared parking. The current zoning is consistent with the proposed project. Density. Section 401.15.C.3 of the Zoning Ordinance requires 2,500 square feet of lot area per multiple family unit. In the R -B District, apartment density bonuses are available to allow a maximum 20 percent reduction in square feet of lot area per unit for multiple family dwellings of ten units or more. Bonuses are granted for features such as type 11 construction, an elevator serving each floor, and one -half of the required free parking underground or within the principal structure. As a result of a reconfiguration /adjustment of the lot areas devoted to residential and commercial uses, the amount of lot area devoted to residential or common open space has been increased from 56,287 square feet (in the previous submission) to 67,744 square feet (see Use Detail diagrams on Exhibits 1 and 2). The basic requirement of 2,500 square feet of lot area per multiple family unit results in a maximum of 27 units being allowed. Provided the building is type 11 construction with an elevator and underground parking, up to 32 units are allowed. Thus, the proposed number of dwelling units is considered acceptable. Setbacks. The front of a lot is defined as that boundary abutting a public right-of-way having the least width. The roadway along the west boundary is a private road; therefore, the only boundary with frontage on a public road is the north boundary. The front yard setback requirement in the B -2 District is 40 feet. Like the previous submission, a setback of 25 feet is proposed. The Planning Commission should comment on this arrangement. The proposed setbacks may be allowed as part of the PUD and may be considered appropriate because the property will be fully developed with this project and the buildings will be set back over 60 feet from the pavement of 60 Street North. The project complies with the minimum side yard setback of ten feet on the east side of the property. Setback flexibility has however, been requested to allow a side setback of five feet, rather than ten feet, from the west property line. Of particular concern with such setback is the adjacency of a 35 foot tall structure to the roadway surface. This issue should be subject to additional comment by the Planning Commission. The rear yard building setback has been increased from 21.3 feet to 30 feet in compliance with applicable ordinance requirements. Building Height. The maximum building height allowed in the R--B and B -2 Districts is 35 feet measured from the mean ground level to the midpoint of the roof. The height of the condominiums has been reduced from 36'-6" to 35 ". Such change has been 2 accomplished via a change in the grade surrounding the building. Thus, the proposed height of the condominium building is considered acceptable. Landscaping and Tree Preservation. General tree cover is illustrated on the concept plan. A detailed tree inventory and landscape plan will be required with the general plan of development. As part of such plan submission, particular attention should be given to the screening of the swimming pool area from the adjacent private roadway. Grading, Drainage, and Utilities. As required, a grading and drainage plan has been submitted for review. In the initial submission, the applicant had requesting that part of a drainage and utility easement be vacated to allow construction of a swimming pool and retaining wall. While the proposed retaining wall remains on the revised plan submission, the swimming pool has been relocated to the west side of the site. The submitted grading and drainage plan should be subject to comment and recommendation by the City Engineer. The applicant is also proposing to add fill on top of an existing sanity sewer pipe. The applicant should provide information about this pipe's ability to accommodate the additional weight. The City Engineer should likewise provide comment on the acceptability of such action. Exterior Building Materials. Proposed exterior materials are rock face C.M.U., cultured stone, and cement board siding and are consistent with ordinance requirements. While the submitted building elevations are considered generally acceptable, some question exists in regard to the elevations for the condominium building. It appears that the elevation labeled "north elevation" is actually the south elevation and the elevation labeled "south elevation" is actually the north elevation. This should be corrected. Parking. The parking area and associated access previously proposed in the southwest corner of the site have been eliminated. Additionally, the parking area in the northwest area of the site has been reconfigured to provide a loop -type circulation pattern. Such changes are considered positive. In regard to the off - street parking supply, at least 2 spaces are required per multiple family dwelling unit. Therefore, at least 64 parking stalls are required for the 32 -unit condominium building. With a supply of 67 stalls (35 of which are underground), this requirement has been satisfied. It should be noted however, that some question does exist in regard to the usability of the proposed row end stalls (due to a lack of backing area in the garage). This issue should be addressed as part of PUD development stage plan review. For the office buildings, 3 parking stalls plus one parking stall per 200 square feet of floor area are required. Based upon the building areas indicated on the concept plan, 13 parking stalls are required for the smaller office building (2,005 x .9 f 200 sq. ft. + 3), 3 and 26 parking stalls are required for the larger office building (4,558 square feet x .9 I 200 + 3) resulting in a total off - street parking supply requirement of 39 stalls. With a supply of 40 stalls for the office building component, this requirement has been satisfied. in total, 103 off-street parking stalls are required on the site. The concept plan includes 107 stalls, 35 of which are underground. Condominium Trash Enclosure. The proposed trash handling area has been relocated from the center of the site (adjacent to the previous swimming pool location) to the extreme eastern boundary of the site. Such relocation is considered positive as the visually dominance of the enclosure will be significantly lessened. As part of the PUD general plan of development submission, the applicant should provide trash enclosure details. The trash enclosure materials should be consistent with the materials used on the condominium building. Lighting and signage. With the general plan of development, the applicant should submit information related to lighting and signage. RECOMMENDATION The Comprehensive Plan designates this area as commercial, while the zoning separates the property into commercial and residential /business districts. If residential use is approved for the site, the Comprehensive Plan map will need to be revised to address the use. The applicant has addressed the majority of issues previously raised most notably in regard to building height and density. Issues related to setbacks and engineering issues do however remain. The Planning Commission should comment on the acceptability of the proposed setbacks and the possibility of providing flexibility through the PUD process. If the Planning Commission determines it is appropriate to move the project forward, approval of the PUD Concept Plan shall be subject to the following conditions: 1. The City's Land Use Plan be amended to accommodate the proposed residential use component of the project. 2. The applicant demonstrate eligibility for the residential density bonus. 3. The Planning Commission and City Council determine the acceptability of the proposed building setbacks. 4 4. As part of the PUD development stage plan submissions, a detailed tree inventory and landscape plan be submitted. As part of the landscape plan submission, particular attention should be given to the screening of the swimming pool area from the adjacent private roadway. 5. issues related to grading, drainage and utilities be subject to comment and recommendation by the City Engineer. 6. The labeling of the condominium building elevations be corrected. 7. The applicant address concerns over the usability of the row end parking stalls within the condominium building's underground parking garage. 8. As part of the PUD general plan of development submission, the applicant provide details of the trash enclosure. The enclosure materials shall be consistent with the materials used on the condominium building. 9. With the general plan of development, the applicant submit information related to lighting and signage. 5 RESOLUTION NO. CITY COUNCIL CITY OF OAK PARK HEIGHTS WASHINGTON COUNTY, MINNESOTA A RESOLUTION ESTABLISHING FINDINGS OF FACT AND RESOLUTION OF THE CITY COUNCIL THAT THE REQUEST BY RIVER VALLEY RENTALS, LLC FOR A MIXED USE, PUD CONCEPT PLAN FOR A 32 UNTT RESIDENTIAL CONDOMINIUM BUILDING AND TWO OFFICE BUILDINGS LOCATED EAST OF OSGOOD AVENUE AND SOUTH OF HIGHWAY 36 BE APPROVED WITH CONDITIONS WHEREAS, the City of Oak Park Heights has received a request from River Valley Rentals, LLC for a mixed use, PUD concept plan for a 32 unit residential condominium building and two office buildings located east of Osgood Avenue and south of Highway 36; and after having conducted a public hearing relative thereto, the Planning Commission of Oak Park Heights recommended that the application be approved with conditions. The City Council makes the following findings of fact and resolution: 1. The real property affected by said application is legally described as follows, to wit: SEE ATTACHMENT A 2. The applicant has submitted an application and supporting documentation to the Community Development Department consisting of the following items: and and SEE ATTACHMENT B 3. The subject site is zoned a combination of B -2, General Business District on the northern portion of the site and R -B, Residential Business /Transitional District on the south; and 4. The planned unit development has been requested to allow multiple buildings on one property and the shared access and parking arrangement of the proposed site plan; and 5. City staff prepared a planning report dated March 5, 2004 and April 1, 2004 reviewing the request for the PUD concept plan; and b. The April 1, 2004 planning report recommended approval of the PUD concept plan subject to the fulfillment of conditions; and 7. The Planning Commission held a public hearing at their March 11, 2004 and. April 8, 2004 meetings, took comments from the applicants and public, closed the public hearing, and recommended that the applications be approved subject to the fulfillment of conditions. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL FOR THE CITY OF OAK PARK HEIGHTS THAT THE CITY COUNCIL APPROVES THE FOLLOWING: A. The application submitted by River Valley Rentals, LLC for a mixed use, PUD concept plan for a 32 unit residential condominium building and two office buildings located east of Osgood Avenue and south of Highway 36 and affecting the real property as follows: SEE ATTACHMENT A Be and the same as hereby approved by the City Council of the City of Oak Park Heights subject to the following conditions: 1. The City's Land Use Plan be amended to accommodate the proposed residential use component of the project. 2. The applicant demonstrate eligibility for the residential density bonus, 3. The Planning Commission recommends the concept site plan with a minimum 25 foot front yard setback and eight foot west side setback to the property lines. 4. As part of the PUD development stage plan submissions, a detailed tree inventory and landscape plan be submitted. As part of the landscape plan submission, particular attention should be given to the screening of the swimming pool area from the adjacent private roadway and residences. 5. Issues related to grading, drainage and utilities be subject to comment and recommendation by the City Engineer. 6. The labeling of the condominium building elevations on the site plans be corrected. 7. The applicant shall address the usability of the row end parking stalls within the condominium building's underground parking garage as part of general plan of development submission. 2 8. As part of the PUD general plan of development submission, the applicant provide details of the trash enclosure. The enclosure materials shall be consistent with the materials used on the condominium building. 9. With the g eneral plan of development, the applicant submit information related to lighting and signage. PI The stormwater plan and any changes to the existing pond shall be subject to review and approval of the Minnesota Pollution Control Agency. 11. A MJiDOT access permit shall be required. A copy of the permit shall be submitted to the City prior to issuance of building permits. 2004. ATTEST: Approved by the City Council of the City of Oak Park Heights this 27th day of April Eric A. Johnson, City Administrator David Beaudet, Mayor 3 A RECOMMENDING RESOLUTION OF THE PLANNING COMMISSION CITY OF OAK PARK HEIGHTS WASHINGTON COUNTY, MINNESOTA A RESOLUTION ESTABLISHING FINDINGS OF FACT AND RECOMMENDING TO THE CITY COUNCIL THAT THE REQUEST BY RIVER VALLEY RENTALS, LLC FOR A MIXED USE, PUP CONCEPT PLAN FOR A 32 UNIT RESIDENTIAL CONDOMINIUM BUILDING AND TWO OFFICE BUILDINGS LOCATED EAST OF OSGOOD AVENUE AND SOUTH OF HIGHWAY 36 SHOULD BE APPROVED WITH CONDITIONS WHEREAS, the City of Oak Park Heights has received a request from River Valley Rentals, LLC for a mixed use, PUD concept plan for a 32 unit residential condominium building and two office buildings located east of Osgood Avenue and south of Highway 36; and after having conducted a public hearing relative thereto, the Planning Commission of Oak Park Heights makes the following findings of fact: 1. The real property affected by said application is legally described as SEE ATTACHMENT A 2. The applicant has submitted an application and supporting documentation to the Community Development Department consisting of the following items: follows, to wit: and and SEE ATTACHMENT B 3. The subject site is zoned a combination of B-2, General Business District on the northern portion of the site and R-B, Residential Business/Transitional District on the south; and 4. The planned unit development has been requested to allow multiple buildings on one property and the shared access and parking arrangement of the proposed site plan; and 5. City staff prepared a planning report dated March 5, 2004 and April 1, 2004 reviewing the request for the PIJt concept plan; and 6. The April 1, 2004 planning report recommended approval of the PUD concept plan subject to the fulfillment of conditions; and 7. The Planning Commission held a public hearing at their March 11, 2004 and April 8, 2004 meetings, took comments from the applicants and public, closed the public hearing, and made the following recommendation: NOW, THEREFORE, BE IT RESOLVED BY THE PLANNING COMMISSION FOR THE CITY OF OAK PARK HEIGHTS THAT THE PLANNING COMMISSION RECOMMENDS THE FOLLOWING: A. The application submitted by River Valley Rentals, LLC for a mixed use, PUD concept plan for a 32 unit residential condominium building and two office buildings located east of Osgood Avenue and south of Highway 36 and affecting the real property as follows: SEE ATTACHMENT A Be and the same as hereby recommended to the City Council of the City of Oak Park Heights for approval subject to the following conditions: 1. The City's Land Use Plan be amended to accommodate the proposed residential use component of the project. 2. The applicant demonstrate eligibility for the residential density bonus. 3. The Planning Commission recommends the concept site plan with a minimum 25 foot front yard setback and eight foot west side setback to the property lines. 4. As part of the PUD development stage plan submissions, a detailed tree inventory and landscape plan be submitted. As part of the landscape plan submission, particular attention should be given to the screening of the swimming pool area from the adjacent private roadway and residences. 5. Issues related to grading, drainage and utilities be subject to comment and recommendation by the City Engineer. 6. The labeling of the condominium building elevations on the site plans be corrected. 7. The applicant shall address the usability of the row end parking stalls within the condominium building's underground parking garage as part of general plan of development ub issio , 8. As part of the PUD general plan of development submission, the applicant provide details of the trash enclosure. The enclosure materials shall be consistent with the materials used on the condominium building. 2 9. With the general plan of development, the applicant submit information related to lighting and signage. 10. The stormwater plan and any changes to the existing pond shall be subject to review and approval of the Minnesota Pollution Control Agency. 11. A MnDOT access permit shall be required. A copy of the permit shall be submitted to the City prior to issuance of building permits. Recommended by the Planning Commission of the City of Oak Park Heights this 8th day of April 2004. ATTEST: Eric A. Johnson, City Administrator John Dwyer, Chair 3