From: Julie Hultman.
Sent: Tuesday, July 26, 2005 8:35 AM {
'jeff@jghauseconstruction.com I
To. 1 �1g �-
Cc: Jim Butler; Eric A. Johnson; Tom Ozzello; 'bkelly a@bonestroo.com'
Subject: Fox Hollow - Condominium Permit - Construction Limitations
Jeff -
Michelle stopped in yesterday afternoon and collected the permits for the plan review fees as well as the construction
permit for the condominium building. Please take a moment to review the notes on each of the permits. Particular to the
condo structure... NO construction beyond footings and foundation is to commence until such time the
sanitary sewer installation has been completed and passed inspection.
The project will be stopped if work moves beyond this stage prior to the sanitary sewer being tested and passing. NOTE
you are required to take any necessary measure to ensure that the sanitary sewer installation is correct and
working properly, this includes any removal of work performed that obstructs an area you may need to
reach,, should repair to the system be required for passing. As such, please contact Brian Kelly &/or Tom Czzello
to schedule the sanitary sewer as soon as it is at the point that it may be tested. I will trust them to notify me when the
test has been requested and passed so that the continuation of the structure's construction may occur.
Thanks,
Julie H.
iITY OF OAK PARK HEIGfl a :�
14168 OAK PARK BLVD. N. #2007
OAK PARK HEIGHTS, MN 55082 -2007
(651) 351 -1661 FAX: (651) 439 -0574
ADDRESS : 14937 60TH ST N
PIN : 04- 029 -20- 11-0127
LEGAL DESC : FOX HOLLOW EAST LLC
r
LOT 2 BLOCK I
PERMIT TYPE : BUILDING
PROPERTY TYPE : MULTI- FAMILYIAPT /TOWNHOMEICONDO
CONSTRUCTION TYPE e NEW CONSTRUCTION
VALUATION : $ 2
NOTE: CONSTRUCT PER APPROVED PLANS. WORK SHALL COMPLY WITH ALL APPLICABLE CONSTRUCTION CODE,
ALL LOCAL ORDINANCE REQUIREMENTS AND AGREEMENTS OF PLANNED UNIT DEVELOPMENT. PERMIT ISSUED
FOR CONSTRUCTION OF A 29 UNIT CONDO BUILDING, COMMON AREAS INCLUDING UNIT 101 COMM ROOM.
SEPARATE PERMITS ARE REQUIRED FOR IRRIGATION, MECHANICAL, PLUMBING, FIRE PROTECTION,
DEVELOPMENT SIGNAGE, ELECTRICAL, POOL INSTALLATION AND FIREPLACE INSTALLATIONS BEYOND THE ONE
IN COMMUNITY ROOM 101. CONTRACTORS SHALL BE REQUIRED TO BE LICENSED BY PROPER AUTHORITY AND
PROVIDE VERIFICATION OF SAME. NO WORK BEYOND FOOTINGS & FOUNDATION SHALL OCCUR UNTIL��,
SAC UNITS 29 WATER METER FEE 0
uc) P 0', Jy�n
APPLICANT
J.G. HAUSE CONSTRUCTION INC.
1909 ST. CROIX TRAIL N
STILLWATER, MN 55082
(651 ) 439-8008
OWNER
RIVER VALLEY RENTALS LLC
1901 ST CROIX TRAIL N
STILLWATER, MN 55082
PERMIT NO.: 2005 - 00149
DATE ISSUED 07/25/2005
BUILDING PERMIT FEE UB C TABLE 1A
12
STATE SURCHARGE - BUILDING
1
METRO SAC
42,050.00
WATER METER
2,125.10
WATER FUND
35.00
SEWER FUND
35.00
TOTAL
57,907.50
PAID WITH CHECK. # 3065
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed
according to: (1) the conditions of this permit; (2) the
approval plans and specifications; (3) the applicable city
approvals, Ordinances, and Codes; and, (4) the State Building
Code. This permit is for only the work described, and does
not grant permission for additional or related work which
requires separate permits. This permit will expire and become
null and void if work is not started within 180 days, or if work
is suspended or abandoned for a period of 180 days any time
after work has commenced. The applicant is responsible for
assuring all required inspections are requested in conformancc
with the Minnesota State Building Code.
CEP A R ATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.