HomeMy WebLinkAbout2005-06-29 Arborist ReportJulie Hultman
From:
Sent:
To:
Sub ect:
OPH Staff -
kdwidin@comcast.net
Wednesday, June 29, 2005 9:06 AM
Tom Ozzello; Julie Hultman; Dennis Postler; Eric A. Johnson; Jim Butler; Scott Richards; Mark
Vierling
Fox Hollow Landscaping - revised site plan 2005
I have reviewed the revised site plan (5/2005) for the Fox Hollow project and have the following comments:
1. A small office building has been removed from the project. This has resulted in a slight shifting of placement of a few
trees, and the addition of more shrubs around the remaining office building.
2. The plant species are the same and acceptable as is the planting detail sheet.
3. One shade tree which was shown to be planted over the sewer line on the east end of the property has been removed.
4. There are 8 'Ivory Silk' Japanese tree lilac indicated on the plan, but only 7 listed in the 'Landscape Material Schedule'.
There are 14 'Summit' ash on the plan, but 15 listed in the schedule. There are 18 'Black Hills' spruce shown on the plan
but 19 listed in the schedule. The schedule should be changed to reflect the drawn plan.
4. The change in the plan should result in no substantial change to the tree replacement requirement, assuming that no
additional trees from the E side of the property are damaged or removed, and that the landscaping is installed as
indicated on the plan.
If you have any questions regarding this report, please contact me.
Kathy Widin
Arborist
City of Oak Park Heights
1