HomeMy WebLinkAbout2005-09-23 BRAA Weekly Project UpdateJulie Hultman From: Sent: To: Kelley, Brian [zka| nestroo.00n] Friday, September 23, 2005 4:02 PM Eric A. Johnson; Tom Ozzello; Judy Holst; JuIie Hultman Cc: Postler, Dennis M; Erickson, Karen S Subject: Weekly projec update Here is the update for this week: Fox Hollow � Buildirig construction in progress � All sanitary sewer testing is completed. 1 area of concern will be addressed when the TV tapes are received from |nfnabaoh. This area is where they cut an 8" saddle into the sanitary sewer main. The cut is 'agged, and needs to be re-examined to determine if it is a point where a blockage could occur. Should we determine that this cut needs to be re-done, there are options that exist to fix it from inside the pipe (as opposed to excavating down to the saddle). DNcKma, Square No change from last week. Cured-in-place storm sewer repairs are being coordinated with Infatech. 9/26/2005 Page 1 of 1