HomeMy WebLinkAbout12-21-09 Parks Packet CITY OF OAK PARK HEIGHTS
PARKS COMMISSION MEETING AGENDA
Monday, December 21, 2009 at 6 :30 p.m. at City Hall
I. Call to Order.
11, Approval of Agenda
III. Approve Parks Commission Minutes for November 16, 2009 (1)
IV. Department / Commission liaison Reports
A. Arborist
B. Public Works Director
C. Other / Commission Liaison Deport
V. Visitors /Public Comment
This is an opporMnity,far the puhlic to address the Cornrnission with questions
or concerns not can the agenda... Please limit commenis to three minutes.
V1. Public Ilearings
None
V11. New Business
A. 2010 Meeting bates and Council Representatives (2)
VIII. Old Business
A. Discuss Quotes for `soffit and Fascia Replacement at Valley View Park (3)
B. 2010 Park Programming
IX. Informational
A. Next Meeting: Mojiday, January 25, 2009 at 6:30 p.in, at City Hall
B. Council Representative: 'Tuesday, January 26, 2009 -. -Vice Chair I-lauble
X. Adjourn
Page 1 of 20
This Pale Is Left Intentionally Bla
z ti`s
�'! ✓'`.`^`. FAY
Page 2 of 20
-
.. CITY Or OAK PARK HEIGHTS
" `.. PARKS COMMISSION MEETING MINUTES
Monday, November 16, 2009 at City Hall
I. Call to Order: Chair Eder called the meeting to order at 6:30 p.m. Present: Vice Chair
Hauble and Commissioners Krieger, Niedzolkowski, and Viers; City Administrator Johnson,
Arborist Widin, Public Works Director Kegley, and Commission Liaison McCombcr.
Absent: None.
II. Approval of A�zcnda: Chair Eder, seconded by Commissioner Krieger, moved to approve the
Agenda. Carried 5 -0.
III. Approve Parks Commission Minutes — October 19, 2009: Vice Chair I-lauble, seconded by
Commissioner Niedzolkowski, moved to approve the Minutes. Carried 5 -0.
IV. Department /Commission Liaison Reports:
A. Arborist: Arborist Widin reported she was working on a grant that was being offered
by Minnesota Department of Agriculture to help communities plan and prepare for
Emerald Ash Boren She reported that Emerald Ash Borer had not yet been detected
in Washington County,
Widin also reported she would be putting together a boulevard tree pruning list and
was working on the 2009 Tree City USA award report.
Commissioner Viers, seconded by Commissioner Krieger, moved to approve the
Arborist's report. Carried 5 -0.
B. Public Works Director: Public Works Director Kegley reported that five rink
attendants were hired for the season. Fie also reported staff was working on
replacing the broken hockey boards at both Cover Park and Brekke Park. Kegley
reported that he looked into the music system at I3rekke Park. Ile stated that they
still have the receiver but the speaker is bad and the wire is gone. lie stated it would
be relatively inexpensive to replace the speaker and wire. Chair Eder stated he has
heard many requests that music be played during open skating. He noted that if it is
not an Issue with the neighboring homes, he Would be in favor of having the system
repaired. The Parks Commission requested staff look into purchasing speakers for
the receiver at the hockey rink.
Vice Chair Hauble, seconded by Commissioner Niedzolkowski, moved to approve
the Public Works Director's report. Carried 5 -0.
C. Other / Commission Liaison Reports: None,
V. Adjourn to Worksession
A. Discussion with Dennis Lindsey — Band Director at Stillwater Area High School:
Page 3 of 20
Parks Commission Minutes
November 16, 2009
Page 2 of 3
Commissioner Krieger, seconded by Vice Chair I Iauble, moved to adjourn to the
worksession. Carried 5 -0.
VI. Reconvene Regular Mecting
VII. Visitors /Public Comment: None
VIII Public Hearings: None
IX. New Business:
A. 2010 Park Programming: City Administrator Johnson reported that $15,000 was
allocated in the 2010 budget for park programming. Park Programming Coordinator
Gina Zeuli was present at the meeting and provided some suggestions for park
programs for 2010.
Chair Eder recommended that events be scheduled with consistency so that people
know that a particular day of the week corresponds with a particular activity. Eder
also thought it was important to rotate parks to get people into each of the parks.
Commissioner Viers suggested the program schedule be posted on the website and in
a newsletter well in advance. Vice Chair I- Iauble suggested the schedule be an insert
in the newsletter. Commission Liaison McComber suggested the schedule also be
included in the Chamber of Commerce newsletter. 7euli stated she would like to
keep the advertising local.
Chair Eder requested that Park Programming CoordinatorLeuli prepare a rough
schedule for 2010 events and a rough budget for the December Parks Commission
meeting.
Commissioner Viers suggested staff prepare a letter requesting; donations from
businesses. City Administrator Johnson stated businesses are already solicited for
donations for Party in the Park. He suggested the Parks Commission consider other
ideas for support.
X. Old Business:
A. Band Performance in City Park: This item was discussed in an earlier worksession.
No action was taken on the record.
B. Discuss Ouotes for Soffit and Fascia Replacement at Vallev View Park.: Vice Chair
Bauble, seconded by Commissioner Viers, moved to table this item to the next
meeting. Carried 5 -0.
XI. Informational:
Page 4 of 20
Parks Commission Minutes
November 16, 2009
Page 3 of 3
A. Next Meeting: Monday, December 21, 2009 at 6:30 p.m. at City Hall
B. Council Representative: 'Tuesday, December 22, 2009 — Commissioner
Niedrolkowski
XII. Adiournment:
Commissioner Krieger, seconded by Commissioner Viers, moved to adjourn the meeting.
Carried 5 -0.
Respectfully submitted,
Jennifer Pinski
Administrative Secretary /Deputy Clerk
Page 5 of 20
This Page Is Left Intentionally Blank.
Page 6 of 20
�J
CITY OF OAK PARK HEIGHTS
PARKS COMMISSION
2010
REGULAR MEETING BATES
Meetings are held the 31 Monday of each month. January and February
meetings have been changed to the week following the regularly
scheduled meeting date, due to legal holidays occurring on the regular
meeting date.
Meeting Date Council Representative
January 25 Commissioner Hauble
February 22 Commissioner Niedzolkowski
March 15 Commissioner Eder
April 19 Commissioner Krieger
May 17 Commissioner Viers
June 2:1 Commissioner Hauble
July 19 Commissioner Niedzolkowski
August 16 Commissioner Eder
September 20 Commissioner Krieger
October 18 Commissioner Viers
November 15 Commissioner Hauble
December 20 Commissioner Niedzolkowski
Page 7 of 20
This rage 6 Left n(c §on gl «bal
Page eam
r
City of
Oak Park Heights
14168 Otrk Park Blvd N.• Box 2007 o Oak Park I Icights. MN 55082 ® Phone (651) 439-4439'D 1 439 -0574
Memoranda
To: Eric Johnson, City Administrator
From Andrew Kegley, [director of Public Works
CC: Park Commissioners
Date: 12/17/09
Re: Quotes to Replace Fascia and Soffit at Valley View Park
During the park walk through on September 21 ", 2009 the Park Commission recognized the
need to replace the soffit and fascia at the Valley View Park Shelter. A request for quotes was
sent to several local construction companies; lour (4) companies submitted quotes. Please find
the attached quote summary and quote sheets submitted. This work would not likely take place
until early spring of2010 as the quotes are valid until April 30 " 2010.
The project would be funded under the budgeted prUjects park building; maintenance guild.
This fund currently has $5000 allocated; however an additional $15,000 will be added in the
2010 budget for a total of $20,000.
After Council approval an award letter shall be sent to the winning contractor; however a
notice to proceed would be withheld at the City's discretion until early spring; but before April
30`' 2-010.
Attachments: Original R Q Document
Quote Summary
Submitted Quotes
TREE CITY U.S.A.
Page 9 of 20
Request for Quotes — Replace Soffit and Fascia
Summary: The city of Oak Park Heights is seeking quotes from licensed and insured
contractors to remove and replace the soffit and fascia at Valley View Park located at 5575 Ozark
Avenue.
Scope of Work:
Base Work:
Section 1. Temporarily remove all fixtures including but not limited to light fixtures,
electrical fixtures or conduits as needed from their current locations. Remove the existing soffit
and fascia on the perimeter of the pavilion, remove the drip edge; and if required remove and
replace the existing 1x4 trim finish.
Section 2. Replace the soffit with primed 4x8 -3/8" AC aspen plywood. Provide and install
ten (10) 8 "x16" white soffit vents evenly spaced with three vents along the east and west side of
the building and two on the north and south side of the building. The soffit vents must be fully
secured and shall be installed in a manner that does not damage the vents or the soffit sheet.
Provide and install 1x8" primed Miratec trim fascia board along the full perimeter of the building;
the fascia board must be routed on the back side to accept the 3/8" soffit plywood. Soffit and
fascia must be attached using appropriate nails and sunken to the appropriate depth. Install new
drip edge along full perimeter of the building. Confirm all colors with City — all colors shall be of
equal price. Reattach the existing light fixtures, electrical fixtures and conduits removed for
access to replace the soffit and fascia. The contractor must confirm all color choices with the City.
Alternates:
Alternate #1: Remove only the four (4) damaged soffit sheets as (narked by Oak Park Heights
staff and replace with 4x8 -3/8" AC aspen plywood. Provide and install ten (10) 8 "x16" white
soffit vents evenly spaced with three vents along the east and west side of the building and two
on the north and south side of the building. The soffit vents must be fully secured and shall be
installed in a manner that does not damage the vents or the soffit sheets. Remove and replace
all fascia board and the drip edge. Install new drip edge along full perimeter of the building.
Confirm all colors with City — all colors shall be of equal price and replace the fascia with 1x8"
primed Miratec trim fascia board; the fascia board must be routed on the back side to accept the
3/8" soffit plywood.
Alternate # 2: Paint the soffit and fascia around the full perimeter of the building including the
ceiling under the shelter. Use minimum 15 -year, exterior latex paint. The contractor must
confirm color choice with the City.
Page 10 of 20
Conditions (for base work and alternate)
• All work shall be completed within 15 calendar days of the City issuing a NOTICE TO
PROCEED. Failure to complete required work in required timeline will entitle the City to
assess a five (5) percent penalty for each week beyond such date.
• Should unanticipated conditions be discovered that are outside the Scope of Work the
Contractor shall immediately notify the City of such conditions and shall work in good -faith
with the City to coordinate appropriate actions. Should these conditions require additional
services, the Contractor and the City shall first negotiate for appropriate services but shall not
exceed reasonable time and materials costs in accordance with industry standard(s). Any
additional work required shall be completed within a reasonable timeline so as to not delay
work of other contractors at the site. Should the Contractor unreasonably cause any delays in
the execution of any work, the City may remove the Contractor from the site upon written
notice and without penalty to the City.
® The Contractor shall work in concert with and will coordinate with the City to complete
this work in a professional, courteous manner.
® The Final and awarded contractor shall provide proof of general liability insurance in an
amount not less than $1,000,000 naming the City as an insured party and shall fully
indemnify the City from loss or liability. The Contractor and their employees are not
employees of the City.
Prior to submitting a response to this RFQ, contractors shall first make a site visit to
better understand the scope and conditions of the Scope of Work. This site visit can be
scheduled by contacting Andy Kegley, Public Works Director at 651 - 439 -4439.
A final contract between the City and the contractor will be required and shall be wholly
consistent with this RFQ.
o The City will provide payment following the satisfactory completion of all work as
determined by the City. There shall be a minimum one -year warranty on all workmanship
and new fixtures.
® The Contractor shall secure and coordinate any needed City or State building permits;
the city will reimburse the contractor for the cost of the Q!y required permit upon
satisfactory completion of the work. Your submitted base work quote and alternate amounts
are total amounts and shall include all items to provide a complete job, including but not
limited to: taxes, licenses, monitoring, fees, disposal fees, surcharges, rental of equipment,
etc., necessary for your firm to complete the project.
Page 11 of 20
40 Your submitted Quotes shall be valid and binding through April 30th, 2010 for the
purposes of awarding a contract and if a contract is awarded prior to such date submitted
quotes shall be carried through during the completion of this project regardless of the actual
final completion date. Should the City not make a project award prior to April 30th, 2010 all
submitted quotes are void. The City reserves the right to reject any and all bids at anytime.
The City shall select a contractor that in the City's determination best meets the needs of the
City. The City will make a final award via a written NOTICE OF AWARD.
• Your submitted base work quote and alternate amounts are total amounts and shall
include all items to provide a complete job, including but not limited to; taxes, licenses,
monitoring, fees, disposal fees, surcharges, storage, security, rental of equipment, etc.,
necessary for your firm to complete the project.
• The City may select the Base Work or Quote Alternates individually without penalty in
price and/or time.
® The City will not accept any workmanship that appears crooked, unprofessional or poorly
installed.
Page 12 of 20
Submission Form
Soffit and Fascia Replacement- Fall 2009
Submissions are due: December 15 ", 2009. Submit in original form only to Andy Kegley,
Director of Public Works, City of Oak Park Heights, PO Box 2007, Stillwater, MN or hand deliver to
Andy Kegley at City Hall located at 14168 Oak Park Blvd N, Oak Park Heights, MN, 55082.
No faxed or emailed submissions will be accented or considered.
Name of Firm:
Owner or President Name:
Base Work Quote Amount: $ .00 (Must be fully legible & in ink)
Alternate # I.: $ .00 (Must be fully legible & in ink)
Alternate # 2: $ .00 (Must be fully legible & in ink)
Signature: Date
(This signature must be the original signature of the owner or president)
Notary; Date (affix stamp)
(Notary is attesting to signature above as being the person capable of binding the company to submit such quote)
Page 13 of 20
Summary of Submitted Quotes w Valley View Soffit and Fascia Replacement
Base Work Alternate 1 Alternate 2 Total
Contractor Replace all soffit and Repair damaged paint the soffit, fascia
fascia sheets as marked by and existing celing Base + Alternate 2 Alternate 1 +2
P.W. staff
Mariah Remodeling I $2,265.00 $1,797.00 $735.00 � $3,000.00 � $2,532.00
Dan Roe er ntme I $2,365,00 $1,610.00 ( $840.00 $3,205.00 $2,450.00
3.G Hause Construction I $2,999.00 I $2,539.00 $2,106.00 $5,105,00 $4,645.00
John Heinlein Construction Inc. $17,912.00 I $4,754.00 ( $3,720.00 $21,632.00 $8,474.00
Mariah Remodeling $2,265.40 $1,797.00 I $735.00 I $3,000,00 � $2,532.00
v
0
N
O
FAPROJECTSWailey View fascia and soffit\Quote summary.xls
_ - -, including but not limited to: taxes, licenses, monitoring, fees, disposal fees, surcharges, storage, security, rental of
equipment, etc., necessary for your firm to complete the project.
9 The City may select the Base Work or Quote Alternates individually without penalty in price and/or time.
10 The City will not accept any workmanship that appears crooked, unprofessional or poorly installed.
Submission Form
Soffit and Fascia Replacement- Fall 2009
lubmissions are due. December 15 2009. Submit in original form only to Andy Kegley, Director of Public Works, City of Oak
'ark Heights, PO Box 20D7, Stillwater, MN or hand deliver to Andy Kegley at City Hall located at 14168 Oak Park Blvd N, Oak Park
leights, MN, 55082.
to faxed or emailed submissions will be accented or considered.
lame of Firm: R C Pl� n G
Page 15 of 20
Owner or President Name: C l� `� S n r
�•v
Base Work Quote Amount: $ 2 I �r°� .00 (Must be fully legible & in ink)
C t?
Alternate # 1: $ .00 (Must be fully legible & in ink)
_ C'G
Alternate # 2: $ 7 .00 (Must be fully legible & in ink)
zz .y
Signature: L.��2 ��� Date
l
(This signature must be the original signature of the owner or president)
Notary: �� '� Date V1 faffix stamp)
(Notary is attesting to signature above as being the person capable of binding the company to submit such quote)
. , MATT CHARLES FOSSE MATT CHARLES FOSSE
r 4r Notary PoG, :c: a '.=
Notary Publc
Minnesota
Minnesota ' My Commission Expires Jan. 31, 2014
" My Commission Expires Jan. 31, 2014 . •. a".r -`. %• „•. ,,, ,
Page 16 of 20
Submission Form
Soffit and Fascia Replacement- Fall 2009
Submissions are due: December 15 2009. Submit in original form only to Andy Kegley,
Director of Public Works, City of Oak Park Heights, PO Box 2007, Stillwater, MN or hand deliver to
Andy Kegley at City Hall located at 14168 Oak Park Blvd N, Oak Park Heights, MN, 65082.
No faxed or emailed submissions will be accented or considered.,
- �1�IJC r° r T71�6 -a z� r
Name of f=irm: � � � '��� �
Owner or President Name:
Base Work Quote Amount: $ 6�� .00 (Must be fully legible & in ink)
Alternate # 1: $ 00 (Must be fully legible & in ink)
Alternate # 2: $ �% ,.00 (Must be fully legible & in ink)
Si g nature: /�
�=:��— /� Date
(This signature must be the original signature of the owner or president)
Notary: `..... Z2 G L L! :��� Date L (affix stamp)
(Notary is attesting t6 signature above as being the person capable of binding the company to submit such quote)
JUDY L. HOLST
S NOTARY PUBLIC - Ar:INR`:SOTA
my Commission Fxpira:
Page 17 of 20
Submission Form
Soffit and Fascia Replacement- Fall 2009
Submissions are due: December 15 2009. Submit in original form only to Andy Kegley,
Director of Public Works, City of Oak Park Heights, PO Box 2007, Stillwater, MN or hand deliver to
Andy Kegley at City Hall located at 14168 Oak Park Blvd N, Oak Park Heights, MN, 55082,
No faxed or emailed submissions will be accepted or considered. ,
Name of Firm: — T . ( -13
Owner or President Name:�R
Base Work Quote Amount: $ 2-.9 c .00 (Must be fully legible & in ink)
Alternate # 1: $ 2 �` .00 (Must be fully legible & in ink)
Alternate # 2: $ 00 (Must be fully legible & in ink)
Signature: _ C� Date �2 ✓`���
(This signature must be the original signature of the owner or president)
Notary: '-�q Date j 1`3 ��(affix stamp)
(Notary is attesting to signature above as being the person capable of binding the company to submit such quote)
Ah AL -MI
""1, Kelly Jo Meyer
Notary Public
Minnesota
?� c Comm}ssion Jantst�y31,?At3 -
Page 18 of 20
c�44' "VS, " - a:.: kJti1J 1!•.41,1 t °1. �� /t ��y
i
s u bmissio n FOB m
< Soffit and Fascia Replacement- Fall 2009
SubmfWws are due: Decem ,ter 15"' 2009. Submit in orig form only to Andy Kegley,
Director of Public Works, City of Oak park Heights, PO Box 2007, Stillwater, MN or hand deliver to
Andy Kegley at City Hall located at 14168 Oak Park Blvd N, Oak Park Heights, MN, 55082.
No
w
Name of Firm' des i�rC
Owner or President Name:
.� "'o Base Mork Quote Amount: $_ 1 . 7 91�_ 00 (Must l folly legible 8L in ink)
Alternate # 1: $ - 1 7 1 , 75/ _.00 (Must be fully legible & in ink)
Alternate # 2: J � , �� .00 (Must be fully legible & in irk)
Signature: _bate 1."2 ^ %G� °O
(This signature must be the original signature of the owner or president)
Notary: --_--_ —_Date _ _ _ (affix stamp)
(Notary is o test ng to r�gnature above as being the perwn capable of binding die cwnpany to s�jbmit such quote)
Page - NL CAS.
This Pale Is Left Intentionally Blank.
Page 20 of 20