March 14, 2007 We-t --
Lakeland
T.
to "land
Eric Johnson, Administrator ;L.
tan"
Cit of Oak Park Hei I
L
14168 Oak Park Blvd. N p a ro
PO Box 2007
Oak Park Hei MN 55082
RE: Goodwill, MSCWMO Review Comments
Dear Mr. Johnson,
St.
I Beach
Mary's
The Middle St. Croix Watershed Mana Or (MSCWMO) received submittal items for the proposed
Goodwill project, located within MSCWMO boundaries and in the cit of Oak Park Hei Minnesota. Accordin to the
MSCWMO 2006 Watershed Mana Plan (WMP), an project undertakin g radin g , fillin or other land alteration
activities which involve movement of earth or removal of ve on g reater than 10,000 s feet of land will be
referred to the MSCWMO for full review (2006 WMP, Section 6.2.1). Because the proposed project q ualifies for full
review under the 2006 WMP, the followin WMP Policies and Performance Standards appl
WMP Section(s)
Polic or Performance Standard
Goodwill Project - Comments
Direct dischar of stormwater to wetlands and
Pro as submitted, is compliant with this
5.1.4, Polic Item I
all other water bodies without water q ualit y
polic
treatment is prohibited.
Sources of water pollution shall be identified
Project, as submitted, is compliant with this
throu the MSCWMO data collection pro
polic Sources of water pollution for this site
and corrected throu the application of BMPs.
include erosion/sedimentation issues durin
5.1.4, Polic Item 2
construction, and increased impervious areas
after construction is complete. BMPs will be
applied based on other policies and
performance standards of the MSCWMO.
All h studies shall anal the 2-, 10-
Project, as submitted, is compliant with this
and 100- rainfall event, with the critical
polic
duration defined as that event causin either the
hi water surface elevation or the lar
5.1.4, Polic Item 3
peak dischar in an area or both. An stud
must use consistent methodolo for the pre-
development and post-development land use
conditions. The methodolo must be approved
b MSCWMO.
Middle St. Croix Watershed Mana Or Member Communities
Afton, Ba Ba Lakeland, Lakeland Shores, Lake St. Croix Beach, Oak Park Hei St. Mar Point, Stillwater, a West Lakeland
March 14, 2007
Page 2 of 4
VAMP Section(s)
Policy or Performance Standard
Goodwill Project - Comments
Newly developed or redeveloped areas will be
Project, as submitted, is compliant with this
limited to the predevelopment or existing rate of
policy. HydroCAD report contains required
runoff or to a rate within the capacity of
information on flow and volume rates.
downstream conveyance systems, whichever is
less, and no increase in the volume or rate of
5.1.4, Policy Item 4
runoff from newly developed areas will occur in
areas where natural outlets do not exist. In sub-
areas of a landlocked watershed, development
shall not increase the predevelopment volume or
rate of discharge from the sub -area for the 10-
year return period event.
Runoff will be minimized through on -site
Project., as submitted, is compliant with this
5.1.4, Policy Item 5
infiltration or prevented through reduction in
policy. On -site infiltration practices meet
impervious surfaces to the largest extent
design standards.
possible before detention ponds are used.
Site design practices that may have only a minor
Project, as submitted, is compliant with this
negative impact on peak flow and volume, such
policy. Recommend using native vegetation to
5.1.4, Policy Item 6
as the use of buffer strips along receiving waters
the extent possible.
and drainage swales, will be promoted to
achieve compliance with the water quality
performance standard.
Applicants must secure any flowage easements
Project, as submitted, is compliant with this
that would be required to accommodate the
policy, on the condition that all required
5.1.4, Policy Item 7
stormwater management facilities. These
easements will be secured.
easements will be granted up to the 100 -yr flood
level.
Applicants will provide the MSCWMO with
Project, as submitted, is compliant with this
5.1.4, Policy Item 8
100 -year flood levels on the ponds, lakes, and
policy.
streams as parcels are developed.
5.1.4, Policy Item 9
The MSCWMO has adopted the Washington
Project, as submitted, is compliant with this
County Floodplain Regulations. (Appendix H).
policy.
5.1.4, Performance Standard I
See Appendix I for Design Standards for
Project, as submitted, is compliant with this
5.2.4, Performance Standard 1
Structural Stormwater Management Measures.
policy. On -site infiltration practices meet
design standards.
Enhanced volume runoff controls will be
Project, as submitted, is compliant with this
5.1.4, Performance Standard 2
designed to retain the first 1 /2 inch of runoff for
policy. Runoff volume standard has been met.
all impervious areas plus 1/ inch of runoff for
On -site infiltration practices meet design
areas with compacted soils.
standards.
No increase in rate of runoff leaving the site
Project, as submitted, is compliant with this
5.1.4, Performance Standard 3
from pre- development to post - development
performance standard, based on submitted
5.2.4 Performance Standard 2
conditions generated by the 2 -, 10 -, and 100-
HydroCAD rate calculations.
year rainfall.
A Stormwater Pollution Prevention Plan
Project, as submitted, is compliant with this
(S WPPP) that meets the National Pollutant
performance standard.
Discharge Elimination System (NPDES)
5.1.4, Performance Standard 4
requirements must be submitted to and approved
5.2.4, Performance Standard 3
by the MSCWMO for all projects undertaking
grading, filling, or other land alteration activities
which involve movement of earth or removal of
vegetation on greater than 10,000 square feet of
land (See Appendix J for NPDES requirements).
Middle St. Croix Watershed Management Organization
MEMBER COMMUNITIES;
Afton, Bayport, Baytown Township, Lakeland, Lakeland Shores, Lake 5t, Croix Beach, Oak Park Heights, St. Mary's Point, Stillwater and West Lakeland Township
March 14, 2007
Page 3 of 4
WMP Section(s)
Policy or Performance Standard
Goodwill Project — Comments
Direct discharge of stormwater to wetlands and
Project, as submitted, is compliant with this
5.1.4, Performance Standard 5
all other water bodies without water quality
performance standard.
treatment is prohibited.
Predevelopment conditions shall assume "good
Not applicable.
hydrologic conditions" for appropriate land
covers as identified in TR -55 or an equivalent
methodology. The meanings of "hydrologic soil
group" and "runoff curve number" are as
determined in TR -55. However, when
predevelopment land cover is cropland, rather
than using TR--55 values for cropland, the
following runoff curve numbers (RCN) shall be
5.1.4, Performance Standard 5
used. These curve numbers represent midrange
values for soils under a good hydrologic
condition where conservation practices are used
and are selected to be protective of the resource
waters.
Hydrologic Soil Group RCN
A 56
B 70
C 79
D 83
Conversion of high- permeability soils shall be
Project, as submitted, is compliant with this
avoided and these soils shall be targeted for
performance standard. Any infiltration BMPs
5.1.4, Performance Standard 7
infiltration.
used for this project must meet MSCWMO
standards.
Lowest floor elevations of structures built
Project, as submitted, is compliant with this
adjacent to stormwater ponds and other water
performance standard.
bodies must be a minimum of two feet above the
100 -year flood elevation and a minimum of two
5.1.4, Performance Standard 8
feet above the natural overflow of landlocked
basins. The landowner or developer is required
to provide MSCWMO with the location of the
100 -year flood elevation, natural overflow
elevation, and lowe fl oor elevations.
Buffer zones of unmowed natural vegetation
Project, as submitted, is compliant with this
shall be maintained or created upslope of
performance standard.
delineated wetland edges, ordinary high water
5.1.4, Performance Standard 9
elevation, or floodplain of all water bodies
(wetlands, streams, lakes) in accordance with the
Performance Standards relating to wetlands,
Section 5.3.4.
Detention facilities will be designed to attenuate
Project, as submitted, is compliant with this
5.1.4, Performance Standard l0
peak flows and provide on -site infiltration in
policy. On -site infiltration practices meet
high - permeability soils, natural depressions, and
design standards.
swales.
Middle St. Croix watershed Management Organization
MEMBER COMMUNITIES:
Afton, Bayport, Baytown Township, Lakeland, Lakeland Shores, Lake St. Croix Beach, Oak Park Heights, St. Mary's Point, Stillwater and west Lakeland Township
March 14, 2007
Pa 4 of 4
WMP Section(s
Polic or Performance Standard
Goodwill Project - Comments
The MSCWMO shall re proper erosion and
Project, as submitted, is compliant with this
sediment control throu the watershed to
polic Compliance with other policies and
prevent siltation and sedimentation of streams,
performance standards relatin to erosion and
lakes, wetlands, and other areas of the
sediment control has been achieved (includin
5.2.4 Polic Item I
watershed.
5.1.4, Performance Standard 1; 5.2.4,
Performance Standard 1; 5.1.4, Performance
Standard 2; 5.1.4, Performance Standard 4;
5.2.4, Performance Standard 3; 5.2.4 Polic
Item 2
Both temporar (durin construction and
Project, as submitted, is compliant with this
permanent (lon erosion control will be
polic Compliance with other policies and
re q uired on newl developed or redeveloped
performance standards relatin to erosion
land in MSCWMO undertakin g radin g , fillin
control has been achieved ( includin g 5.1.4,
5.2.4 Polic Item 2
or other land alteration activities which involve
Performance Standard 1; 5.2.4, Performance
movement of over 100 cubic y ards of earth or
Standard 1 5.1.4, Performance Standard 2;
removal of ve on g reater than 10,000
5.1.4, Performance Standard 4; 5.2.4,
s feet* of land.
Performance Standard 3; 5.2.4 Polic Item 1
The proposed project disturbs g reater than
10,000 s feet of land.
Existin a activities will be exempt
Not applicable.
from the performance standards listed below.
5.2.4 Polic Item 3
MSCWMO will re buffers from
waterbodies and support a BMPs.
New a activities must conform to the
performance standards listed below.
5.2.4 Performance Standard 4
Construction is prohibited on slopes g reater than
Project, as submitted, is compliant with this
12 percent.
performance standard.
Buffer zones of unmoved natural ve
Project, as submitted, is compliant with this
shall be maintained or created upslope of
performance standard.
delineated wetland ed ordinar hi water
5.2.4 Performance Standard 5
elevation, or floodplain of all water bodies
(wetlands, streams, lakes in accordance with the
Performance Standards relatin to wetlands,
Section 5.3.4.
This project, as submitted, meets all Policies and Performance Standards contained within Section 5.0 of the MSCWMO
WMP. The MSCWMO Board approved the project on March 8, 2007. Washin Conservation District staff is available
for technical assistance to the landowner to ensure that the project desi and construction meets all MSCWMO Policies
and Performance Standards. Feel free to contact this office at 651-275-1136 if y ou have an q uestions re these
comments.
Sincerel
Pete Y n
En Specialist, Washin Conservation District
CC. Todd Erickson,, P.E., Folz, Freeman, Erickson, Inc., 5620 Memorial Ave N, Stillwater, MN 55082
Vicki Vandell, P.E., Folz, Freeman, Erickson, Inc., 5620 Memorial Ave N, Stillwater, MN 55082
Melissa Lewis, Administrator,, Middle St. Croix Watershed Mana Or
Middle St. Croix Watershed Mana Organization
MEMBER COMMUNITIES:
Afton, Ba Ba Township, Lakeland, Lakeland Shores, Lake St. Croix Beach, Oak Park Hei St. Mar Point, Stillwater and West Lakeland Township