June 7, 2007
A r Bonestroo
Mr. Eric Johnson
City Administrator
City of Oak Park Heights
14168 Oak Park Blvd., P.O. Box 2007
Oak Park Heights, MN 550822007
Re: Goodwill
Plans Issued for Construction — March 8, 2007
Bonestroo file No. 55 -07 -000
Dear Eric:
Y 4'
V . I.
L� G
We have reviewed the Construction Plans for Goodwill as submitted by Folz, Freeman, Erickson, Inc. on
May 7, 2007, Following are our comments and/or recommendations.
Chnn+ r 1 1
1. At the driveway entrance the removal note for the sidewalk should be changed to bituminous
pathway.
2. An existing hydrant is located on the south side of the driveway entrance. Make a note to protect
existing hydrant.
c 1-, -t f, + r -) 1
1. Concrete pedestrian ramps with truncated domes shall be constructed on each side of the
driveway entrance,
2. A commercial concrete driveway apron is required at the entrance. As discussed with the owner a
curb cut will be placed at this location. Rebar shall be used to tie the concrete driveway apron into
the curb cut.
5t. Paul
5t. cloud
Rochester
Milwaukee
Chicago
City or Oak Park Heights
Goodwill
C h ant (_,� )
Page 2
b -7 -D7
1 . Detailed design drawings and calculations for the retaining walls signed by an engineer licensed in
Minnesota shall be submitted to the City for review and approval prior to construction.
2. Perm ission/easement from XCEE will be required for the minor grading on their property. Provide
the city with a copy of this permission /easement agreement,
chant rn 1
1 All 12" and 1 5" RCP shall be class 5.
2. The 4" FVC pipe in the in i filtration basins should be tailed out as perforated pipe.
3. CBMH 4 is called out as a 48" diameter structure. The top of the 24" pipe to the south and the
bottom of the 15" pipe to the east will be in conflict with a 48" diameter structure. It appears this
structure needs to be increased to a 6'0 diameter.
4. CBMH 9 in the northwest corner has a future storm sewer extened to the northwest. will CBMH 9
have a hole bulkheaded for this future pipe? Or will a new hole be made with the future
connection?
5. Provide rational sheet calculations for the design of the storm sewer.
6. Insulate all storm sewer /water main crossings.
7. The connection to the existing sanitary manhole shall be core drilled. The pavement section for the
patching is called out as C7.1. (In this set of plans there are duplicate detail sheets, C5.1- C5,3
and C7.1 — C7.3)
8. Verify that the hydrant detail/ specs call out the following information.
Fire hyrlrantc shall inr r an AF( - �,I aterous storz N0771e • The hydra nj i 11,n ❑
1 a s ✓ � {! i 1 4 �J 1 • 4 L i � 4. G. h: 4 • 4 � � ti.rj r - r 1 �r L.. f
shall be of one -piece design, compatible with a 5" Storz hose coupling. The nozzle shall be an
integral part of the fire hydrant and must be furnished by the manufacturer or authorized
distributor designated by the manufacturer. Storz adapters will not be accepted.
General Comments
1, Provide the City with a copy of the approval letter from the Middle St. Croix water Management
Organization,
City or Oak Park Heights
Goodwill
Pa 3
If you have any questions or require additional information, please contact meat(8S1)GO4-478QorDennis
PosderetAS51\6O4~4815.
Sincerely,
BONESTROO
A l
-
Karen S. Erickson, P.E.
cc TomOzzeUo, Public Works Director
Jim Butler, Building Official
Scott Richards City Planner
Mark Vler|ing, City Attorney
Todd Erickson, FFE Inc.
DMP, 8MK. [VVLong Fi|e — Bonestroo