HomeMy WebLinkAbout06-05-35 RESOLUTION NO. 06-05-3 5
CITY OF OAK PARK HEIGHTS
WASHINGTON COUNTY, MINNESOTA
A RESOLUTION ESTABLISHING CONNECTION FEES
THROUGHOUT THE CITY OF OAK PARK HEIGHTS
FOR CONNECTIONS TO MUNICIPAL WATER SYSTEMS,
SANITARY SEWER SYSTEMS AND STORM SEWER SYSTEMS
WHEREAS, Minn. Stat. §444.075, Subd. 3 authorizes municipalities to establish a
system of charges for the construction, reconstruction, repair, enlargement, improvement or other
obtainment, maintenance operation and use of municipal facilities, including, but not limited to
charges for connections to such municipal facilities for municipal water, sanitary sewer, and storm
sewer; and,
WHEREAS, City ordinances provide for the Council to establish from time to time
connection charges to be collected for properties developing in and connecting to the municipal
water, sanitary sewer and storm sewer systems; and,
WHEREAS, the City has historically established and collected connection charges;
and,
WHEREAS, connection charges established by the City of Oak Park Heights
require modification and amendment from time to time; and,
WHEREAS, the office of the City Engineer has provided recommendations to the
City Council as it affects the establishment of connection charges throughout the City of Oak Park
Heights as it relates to connection to trunk sanitary sewer systems, trunk water systems and trunk
storm sewer systems; and,
WHEREAS, the City Council determines it to be in the best interest of the residents
and City of Oak Park Heights that such fees be periodically reviewed and adjusted to take into
account cost of construction and replacement and systems, cost of maintenance operation and other
expenses that the City expects to incur with regard to the maintenance of such systems.
NOW, THEREFORE, BE IT RESOLVED, by the City Council for the City of
Oak Park Heights that effective May 23, 2006 city connection charges to be applied throughout the
City of Oak Park Heights for properties developing or connecting to municipal utilities shall be as
follows:
1. Sanitary sewer connection charge as follows:
Commercial/Industrial Retail Business Centers $1,870.00 per acre.
Low Density Residential $1,784.00 per acre.
Medium Density Residential $2,379.00 per acre.
High Density Residential $4,163.00 per acre.
2. Municipal water connection charge as follows:
Commercial/Industrial Retail Business Centers $9,718.00 per acre.
Low Density Residential $9,271.00 per acre.
Medium Density Residential $12,361.00 per acre.
High Density Residential $21,632.00 per acre.
3. Storm sewer connection charges in the sections of the city located within the
Valley Branch Watershed District and the Middle St. Croix Valley Water
Management Organization as follows:
Commercial/Industrial Retail Business Centers $1,516.00 per acre.
Low Density Residential $834.00 per acre.
Medium Density Residential $1,209.00 per acre.
High Density Residential $1,516.00 per acre.
And additional TSMP storm sewer connection charges in the areas of the
city located in the Browns Creek Watershed District however excepting the
areas located West of Trunk Highway 5, South of Trunk Highway 36 and
north of 55th Street as follows:
Commercial/Industrial Retail Business Centers $7,069.00 per acre.
Low Density Residential $6,387.00 per acre.
Medium Density Residential $6,762.00 per acre.
High Density Residential $7,069.00 per acre.
BE IT FURTHER RESOLVED, that as to the determination of land use and
computation of acreage as it affects each development or connection related to the collection of
these fees, all such determinations /computations shall be made through the office of the City
Engineer with all such fees being thereafter collected through the office of the City Administrator.
No connection shall be made to any municipal utility system until such time as the connection fees
as calculated and determined by the office of the City Engineer have been collected.
Passed by the City Council for the City of Oak Park Heights this 23" day of May,
2006.
fr i a id Beaudet, Mayor
'i ohnson
C Administrator
MASTER FEE SCHEDULE
ATTACHMENT TO CITY ORDINANCE 102
CITY OF OAK PARK HEIGHTS
14168 Oak Park Blvd. N.
P.O. Box 2007
Oak Park Heights, MN 55082
CURRENT FEES, RATES AND CHARGES
(Subject to Change) Republished 7/19/06
Alcoholic Beverages; Fee
3.2 Malt Liquor Off -Sale License 50.00 per year
3.2 Malt Liquor On -Sale License 150.00 per year
3.2 Malt Liquor License Investigation Fee 500.00 per year
Liquor Off -Sale License 100.00 per year
Liquor On -Sale License 2,770.00 per year
Liquor On -Sale Sunday License 200.00 per year
Liquor License Investigation Fee 500.00 per year
Park Alcohol Use Consumption Permit
In conjunction with park shelter 15.00 per permit
reservation)
Wine On -Sale License 600.00 per year
Wine License Investigation Fee 500.00 per year
Amusement Commercial Recreation: Fee
Billiards Pool Table License 15.00 per table
Bingo License 75.00 per year
Mechanical Amusement Devices 15.00 per device
Building/Construction/Utilities: Fee
Building /Construction Permits General
Right of Way Permits $150.00 Expenses and Deposit.
Commercial /Industrial Permits Based on job value (see valuation table
below). State Surcharge will be charged.
Plan Review Fee will be charged, if
applicable.
Excavating Grading Fee and State Surcharge are based on
job value (see valuation table below)
and cubic yards earth moved. Plan
Review Fee will be charged, if
applicable.
Residential Permits:
Additions Based on Job Value
Decks /Patios Similar Based on Job Value
Fence Installation 4' Under $50.00
Fence Installation Over 4' Based on job value (see valuation table
below). State Surcharge will be charged.
Plan Review Fee will be charged, if
applicable.
New Construction Remodeling Based on job value (see valuation table
below). State Surcharge will be charged.
Plan Review Fee will be charged, if
applicable.
Re- Roofing $50.00
Re- Siding $50.00
Storage Shed (1 story 120 sq. ft. or less) $25.00
Window Replacement $50.00
Compliance Escrow:
New Commercial Construction Variable
Compliance Escrow:
New Residential Construction $1,000 per residential unit
Contractor Licenses:
Blacktopping /Asphalt $30.00 per year
Building Moving $30.00 per year
Commercial General Contractor $50.00 per year
Concrete Masonry $30.00 per year
Excavation/Grading $30.00 per year
Fire Protection Systems Installation MN State Licensure Required
Heating, Ventilation AC (Mechanical)
MN Mechanical Bond Required $30.00 per year
Irrigation Sprinkler Installation $30.00 per year
Outside Sewer Water Installation $30.00 per year
Plumbing MN State Licensure Required
Residential General Contractor MN State Licensure Required
Siding Installation $30.00 per year
Signage Billboards Installation $30.00 per year
Specialty Other: Not Specified Above $30.00 per year
Verification of State Contractors License $5.00 per permit submission
Electrical Permit Application (MN State) $2.00
-2-
Inspection Services:
Miscellaneous Inspections $55.00 per hour or total hours cost to
(For which no other fee has been jurisdiction, whichever is greater. Includes
established Min. Charge is '/z hr.) employee costs, overhead and equipment.
Outside Regular Business Hours $55.00 per hour or total hours cost to
(Minimum Charge is 2 hours) jurisdiction, whichever is greater. Includes
employee costs, overhead and equipment.
Re inspection $55.00 per hour or total hours cost to
jurisdiction, whichever is greater. Includes
employee costs, overhead and equipment.
Plan Review Services:
Initial Plan Review Variable 65% of the base permit fee
based on project value
Additional Plan Review(s) $55.00 per hour or total hours cost to
(Due to changes, revisions Min. 1/2 Hr.) jurisdiction, whichever is greater. Includes
employee costs, overhead and equipment.
Grading /Excavation Fee Schedules
Grading Permit Fees (1):
The fee for a grading permit authorizing additional work to that under a valid permit shall be
the difference between the fee paid for the original permit and the fee shown for the entire
project.
50 cubic yards or less $23.50
51 to 100 cubic yards $37.00
101 to 1,000 cubic yards $37.00 for the first 100 cubic yards
$17.50 for each additional 100 cubic yards or fraction
thereof
1,001 to 10,000 cubic yards $194.50 for the first 1,000 cubic yards
$14.50 for each additional 1,000 cubic yards or
fraction thereof
10,001 to 100,000 cubic yards $325.00 for the first 10,000 cubic yards
$66.00 for each additional 10,000 cubic yards or
fraction thereof
100,001 or more cubic yards $919.00 for the first 100,000 cubic yards
$36.50 for each additional 10,000 cubic yards or
fraction thereof
-3-
Other Grading Inspection Fees (2):
Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
Supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
Inspections outside normal business hours $55.00 per hour (2)
(Minimum Charge two hours)
Re- inspection Fees $55.00 per hour (2)
Inspections for which no fee is specifically indicated
(Minimum Charge one -half hour) $55.00 per hour (2)
Grading Plan Review Fees
Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
Supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
50 cubic yards or less No Fee
51 to 100 cubic yards $23.50
101 to 1,000 cubic yards $37.00
1,001 to 10,000 cubic yards $49.25
10,001 to 100,000 cubic yards $49.25 for the first 10,000 cubic yards
$24.50 for each additional 10,000 cubic yards or
fraction thereof
100,001 to 200,000 cubic yards $269.75 for the first 100,000 cubic yards
$13.25 for each additional 10,000 cubic yards or
fraction thereof
200,001 or more cubic yards $402.25 for the first 200,000 cubic yards
$7.25 for each additional 10,000 cubic yards or
fraction thereof
Other Grading Plan Review Fees:
Additional plan review required by changes, additions or revisions $55.00 per hour
to approved plans. (Minimum Charge one -half hour)
-4-
Heating Ventilation Cooling Permits (Mechanical)
Commercial/Industrial: 1% of job valuation for first $100,000
plus /2% of value above $100,000
($75.00 minimum). MN State Surcharge
will be charged. Plan Review Fee will
be charged, if applicable
Residential Permits:
Air Conditioning Replacement or Repair $25.50
Fireplace Installation $50.50
Furnace Replacement or Repair $50.50
New Construction Remodeling $75.50
Residential: Gas Line Installation Only $25.50
Residential: Minor Improvement
Eg. pre -wired dishwasher, water softener,
and minor repair meeting the following:
Does not modify gas or electrical 5% of job valuation (min. $15.00), plus
service; .50 cent state surcharge.
Does not exceed total labor cost of $500;
and
Is improved, installed or replaced by the
homeowner or a licensed contractor.
Plumbing
Commercial/Industrial Permits: 1% of job valuation ($75.00 minimum)
plus .50 MN State Surcharge.
Residential Permits:
New Construction Remodeling $75.50
Residential: Minor Improvement
Eg. pre -wired dishwasher, water softener,
and minor repair meeting the following:
Does not modify gas or electrical
service; 5% of job valuation (min. $15.00), plus
Does not exceed total labor cost of $500; .50 cent state surcharge.
and
Is improved, installed or replaced by the
homeowner or a licensed contractor.
Water Heater (when installation is
separate from other plumbing services) $25.50
-5-
Utilities
(Including Water, Sewer, Storm Sewer Garbage Rates)
Commercial Inspections Testing
Conductivity Test $70.00
Disinfection Test $70.00
Hydrostatic Pressure Test $70.00 Each
Manhole Inspection $35.00 5 manholes
Sewer Air Pressure Test $35.00
Sewer Service Inspection $35.00 Per Service
Water service Inspection $35.00 Per Service
Wet Tap Inspection $35.00 Per Wet Tap
Connection Charges:
Existing Lines: Local Water Connection $35.00 Unit
Charged with Construction Permit
when water meter required.
Existing Lines: Local Sewer Connection $35.00 Unit
Charged with Construction Permit
when water meter required.
New Lines: Municipal Water Connection $5,280 Per Acre
New Lines: Sanitary Sewer Connection $3,035 Per Acre
-6-
New Lines:
FOR UNDEVELOPED UNCONNECTED LAND: Per Acre
Area Charges Non TSMP AREA
(Middle St. Croix Watershed Valley
Branch Watershed Districts)
Commercial
Industrial
Retail Low Medium High
Business Density Density Density
Centers Residential Residential Residential
Sanitary 1,870 1,784 2,379 4,163
Water 9,718 9,271 12,361 21,632
Storm 1,516 834 1,209 1,516
TOTAL 13,104 11,889 15,949 27,311
Area Charges TSMP AREA
(Brown's Creek Watershed District
Exception: areas located W. of Hwy. 5,
S. of Hwy. 36 and N. of 55` St.)
Commercial
Industrial
Retail Low Medium
Business Density Density High Density
Centers Residential Residential Residential
Sanitary 1,870 1,784 2,379 4,163
Water 9,718 9,271 12,361 21,632
Storm 7,069 6,387 6,762 7,069
TOTAL 18,657 17,442 21,502 32,864
Computation of acreage, as it affects each development or connection related to the collection of
these fees, shall be made through the office of the City Engineer with all such fees being
collected through the Office of the City Administrator.
Customer Service Call Request $55.00 for first 1 /2 hour $55.00 for each
additional hour or fraction thereof.
Garbage Rates Commercial Individually contracted by Business with
City Licensed Sanitation Haulers
Containers:
Garbage Rates Residential 35 gal.: $6.05 9.75% cart tax mo.
65 gal.: $7.10 9.75% cart tax mo.
410 95 gal.: $8.70 9.75% cart tax mo.
-7-
S.A.C. $1,550 per unit
Metropolitan Council Service Availability Units determined by Building Official
Charge and /or Metropolitan Council
Sewer Usage Rates: $16.65 mo. min. Use up to 5,000
gallons water
$3.40 per each 1,000 gallons over 5,000
Vacant: $1.50 per acre
Storm Sewer Usage Rates Commercial: Occupied: $10.00 per acre
(Based on Acreage)
Storm Sewer Usage Rates Residential: Single Family Residential: $1.00 per
(Based on of garbage containers) garbage container.
Multiple Family Residential: $1.00
per garbage container Up to 4
containers. Over 4 considered
commercial.
Water Hydrant Connection $15.00 per connection to Hydrant
g 15.00 for temporary use of water
Construction Meters meter (if applicable)
water usage
Water Meters Variable
Based on size and Market Rate
Water Meter Calibration Check $35.00
(Refunded if Meter is Overcharging)
Water Service Shut Off Reinstatement $35.00 for first '/2 hour $55.00 for each
additional hour or fraction thereof.
Water Usage Rates: $7.50 mo. min. Use up to 5,000
gallons water
$1.34 per each 1,000 gallons over 5,000
and up to 16,000 gallons
$1.76 per each 1,000 gallons over
16,000 gallons and up to 33,000 gallons
$2.11 per each 1,000 gallons over
33,000 gallons
-8-
Valuation Based Permit Fee Schedule:
Base Permit Fee Only Does Not Constitute full fee charged for permit
Total Valuation Fee Calculation
$1 to $500 $23.50
$501 to $2,000 $23.50 for the first $500, plus $3.05 for each additional
$100 or fraction thereof, up to and including $2,000
$2,001 to $25,000 $69.25 for the first $2,000, plus $14.00 for each additional
$1,000 or fraction thereof, up to and including $25,000
$25,001 to 50,000 $391.75 for the first $25,000, plus $10.10 for each
additional $1,000 or fraction thereof, up to and including
$50,000
$50,001 to 100,000 $643.75 for the first $50,000, plus $7.00 for each
additional $1,000 or fraction thereof, up to and including
$100,000
$100,001 to $500,000 $993.75 for the first $100,000, plus $5.60 for each
additional $1,000 or fraction thereof, up to and including
$500,000
$500,001 to $1,000,000 $3,233.75 for the first $500,000, plus $4.75 for each
additional $1,000 or fraction thereof, up to and including
$1,000,000
$1,000,001 and Above $5,608.75 for the first $100,000, plus $3,65 for each
additional $1,000 or fraction thereof
1
-9-
Business Related Fee
Licenses:
Fireworks Sales
Combined with Mixed Retail 100.00 per year
Exclusive Firework Sales Retail 350.00 per year
Mobile Home Park Special Use Permit $50 per Mobile Home
10% of gross project area
designation to recreational use
(developed and maintained and
owners expense)
Refuse Hauler 150.00 per year
Phosphorous Based Fertilizer Sales 100.00 per year
Peddler/ Solicitor 25.00 per year
Taxicab License $60.00 per operator per year
Tobacco Over the Counter Sales 100.00 per year
Tree Worker's License (Eg. Trimmer, Etc) 25.00 per year
Temporary Signage /Banner Permit No Charge
Must Contact City Prior To Installing
Miscellaneous: Fee
Assessment Search $15.00 per parcel
City Maps Market Rate
Design Guidelines 5.00
Domestic Pet License (Cats Dogs) No Charge
Proof of Rabies Vaccination
Required
City Ordinance Book .03 per page
Comprehensive Plan 150.00
Kennel License 100.00 per year
Mailing, Messenger Service or Transmitting Actual Costs Incurred
Mileage Rate of Charge Per Current IRS Rate
NSF Returned Check Charge 20.00
Photocopies .03 per page
Special Project Research Actual Time Expended Costs
Subdivision Ordinance (Ordinance 402) 10.00
Videotape Reproduction 15.00
Zoning Ordinance Ordinance 401 or other 55.00
related documents)
-10-
Park Dedication Requirements:
Dedication is based on "Fair Market Value," determined at time of filing of plat and may be
comprised of land, cash or a combination of both. Refer to Ordinance 402: Subdivision for
o aitional information
Commercial/Industrial:
When City does not require park or open space within
Cash Dedication (1) development, cash amount equal to ten (10) percent of the
gross land area within the development, as determined by
the City.
Land Dedication (1) An amount of up to ten (10) percent of the gross land area
within the development, as determined by the City.
(1) A credit of up to twenty -five (25) percent of the required dedication may be allowed by the City
Council for open space areas within a development provided that such improvements benefit
identifiable park and recreation water resources.
Residential:
Required Land Dedication Based upon Dwelling Units Per Acre
Cash Dedication (1) x
Fair Market Value of Land Per Acre
Required Cash Contribution For Proposed Development
Land Dedication (2) Dwelling Units Per Acre Land to Be Dedicated
0 -1.9 8%
2.0 3.9 10%
4.0 -5.9 12%
6.0 9.9 14%
10 14% 5% for each unit over 10
(1) Amount based on fair market value and same density forumlas established for land dedication.
(2) Amount based on the gross area of the proposed subdivision and proposed type of dwelling unit and
density.
-11-
0 Planning Zoning: Application Fee Escrow
City Financial Assistance: $3,000.00 To be determined by
Eg: TIF, Tax Abatement, Special Assessments, City based on proposed
Annexation, Special District Projects, Etc. project.
Also See: City of Oak Park Heights Financial Assistance
Listing of Fees.
Comprehensive Plan Amendment 500.00 $1,000 $3,000*
Conditional Use Permit /Amendment 400.00 NA
Home Occupation: Minor 25.00 NA
Home Occupation: Major (CUP Process) 100.00 NA
Home Occupation: Annual Renewal Fee 15.00 $1,000 $3,000*
Planned Unit Development: Amendment 700.00 $1,000 $3,000*
Planned Unit Development Concept Plan 500.00 $1,000 $3,000*
Planned Unit Development: General Plan 700.00 $1,000 $3,000*
Site Plan Review 400.00 $1,000 $3,000*
Street Vacation 100.00 $500.00*
Subdivision: Minor 200.00 $1,000 $3,000*
Subdivision: Major 400.00 $1,000 $3,000*
III Variance: Industrial /Commercial 200.00 NA
Variance: Single Family Residential 150.00 $1,000 $3,000*
Zoning District Amendment 400.00 $1,000 $3,000*
Escrow is based on number of units: 1 -9 $1,000
10 -50 $2,000
51+ $3,000
Police Department: Fee
Reports:
(Accident, Arrest, Burglary, Incident, Offense, Etc.) .03 per page
0
-12-
City of Oak Park Heights
Financial Assistance
Listing of Fees
1. Application Fee
Any conduit revenue bond, financial note or other financial assistance tool, including TIF assistance,
requested to be provided by the City shall require the payment of an Application Fee of $3,000. This fee is
payable at the time of the formal submission of any financial assistance request. This fee is not refundable.
2. Escrow Deposit
In addition to Application Fee, the applicant shall also provide the City necessary cash to be deposited into
an escrow fund and in an amount estimated to adequate to secure all City out -of- pocket expenses including
but not limited to; attorney's fees, auditing fees, planning fees, etc., to complete the project. This amount
will be determined by the City at the time of the submission of any application. Any unused funds shall be
returned to the Applicant.
3. Closing Fee
Prior to the City executing any final resolutions authorizing the sale of bonds, notes or other financial
assistance tools, a Closing Fee payable to the City shall be determined and incorporated into the project.
The Closing Fee shall be a maximum 1.0 percent of gross proceeds. The City Council may determine a
lower amount but may not be less than 0.5 percent. Closing Fees shall be due and payable at closing.
4. Annual Servicing Fee
The Applicant shall also pay to the City an Annual Servicing Fee and is equal to 0.1% of the average
balance of all outstanding funds as calculated on Jan 1 of each year following the issuance of any financial
tool or obligation. The first year Servicing Fee shall be pro- rated.
-13-