Jul 3, 2007
Mr. Eric Johnson
Cit Administrator
Cit of Oak Park Hei
14168 Oak Park Blvd., P.O. Box 2007
Oak Park Hei 55082-2007
D en P y H r.-, c ke- r
Cit of Oak Park lei
onestroo fil o. 55-07-000
Dear Eric:
ON O
We have reviewed the Preliminar Development Plans for Denn Hecker Site as submitted b Darwin Lindahl
Architects and Ultei En on June 27, 2007. Followin are our comments and/or recommendations.
Sheet C1
1. Show the percent g rades with the draina arrows.
2. The detail for erosion control protection at the catch basin is not allowed b the Cit It has been
found that sediment falls into the structure when cleanin the filter fabric. The Cit does allow
Road Drain b Wimco, LLC (www.roaddrain.com).
Sheet C2,
1. Identif the class of RCP pipe.
2. Identif the outlet for the storm sewer s and the method to transport the storm water to the
Kern Center Pond.
3. Structure CBMH I is called out as a 27 " structure and is located in the center of the lot. The detail
shows this structure with a castin that has a curb back. This castin will not work at this
location.
4. Identif the t of PVC for the sanitar sewer.
5. Verif that the h covera is ade for the site.
St. Paul
St. Cloud
Rochester
Milwaukee
Chicago
City of Oak Pork Heights
Denny Necker
Page 2
July 3, 2007
Sheet G
I, Verify that the hydrant detail/ specs call out the following information:
Fire hydrants shall incorporate an AFC - waterous Storz Nozzle. The hydrant pumper nozzle
shall be of one -piece design, compatible with a 5" Storz hose coupling. The nozzle shall be an
integral part of the fire hydrant and must be furnished by the manufacturer or authorized
distributor designated by the manufacturer. Storz adapters will not be accepted.
2. There appears to be many details missing, including but not limited to, heavy duty pavement
section, concrete sections for side walk and concrete car show pads.
Traffic (
1 . It is recommended that the entrance on Morning Dove Avenue be moved further south to line up
with the customer parking drive aisle. This will facilitate better traffic operations as the future
street is completed. Moving the access point will help maintain the integrity of the intersection of
58t Street and Morning Dove Avenue,
2. The turning radius from the parking lot to Memorial Avenue will need to be increased for the
delivery trucks so that they will not drive over the curb and to minimize the need for the trucks to
encroach into oncoming traffic lanes.
I It is recommended that the south radius at 58"' and Memorial Avenue be increased from 42 feet to
60 feet. Even with the larger radius, trucks turning right from Memorial to 58' will need to drive
into the west bound lane on 58" Street; however they will be able to remain on the pavement.
4. Revisions will be required on the traffic signal and loop detectors at Highway 5 and 58t Street.
M N DOT will need to review and approve these revisions.
5. It is recommended that 58" Street will be widened to four lanes from Highway 5 to Morning Dove
Avenue and then taper back to the existing two lanes on the west side of Morning Dove.
6. For the circulation of traffic future development of the entire Denny Hecker site will require
additional roadway improvements.
MNIF)nT lsri,pr,
I . The developer should contact MNDOT on the following issues;
a. Setbacks from MNDOT's right -of -way for proposed improvements.
b. Modifications 58" Street at H ighwaty 5 within M N DOT's right -of -way.
c. As stated above, any signal modifications at 58t Street and Highway 5.
City of Ook Park Heights
Denny Necker
General Co mments
Page 3
July 3, 2007
1. The plans submitted were very preliminary and will require additional review when the design is
more complete,
1 Provide the City with a copy of the approval letter from the Browns Creek watershed District.
If you have any questions or require additional information, please contact me at (651) 604 -4788 or Dennis
Postler at (651) 604 -4815.
Sincerely,
BONESTROO
Karen S. Erickson, P. E,
cc: Tom Ozzello, Public works Director
Jim Butler, Building Official
Scott Richards, City Planner
Mark Vierling, City Attorney
Darwin Li ndah, Darwin Lindah Arch itects, PA
Troy Livgard, Ulteig Engineers
DMP, BMK, CwL2, File — Bonestroo